SAVE 40% ON SINGLE IMAGE PURCHASES - OFFER ENDS MONDAY, USE CODE: SAVE40MAYBH

Steven Berry Scottish Canals head of operational delivery views the fixed gare bearings at the Falkirk Wheel as the second phase of winter maintenance on the world's only rotating boat lift is currently underway, with Scottish Canals' engineers de-watering the structure in order to replace the gate bearings, with the attraction reopening to boat trips on March 8th.

Steven Berry Scottish Canals head of operational delivery views the fixed gare bearings at the Falkirk Wheel as the second phase of winter maintenance on the world's only rotating boat lift is currently underway, with Scottish Canals' engineers de-watering the structure in order to replace the gate bearings, with the attraction reopening to boat trips on March 8th. Stock Photo
Preview

Image details

Contributor:

PA Images / Alamy Stock Photo

Image ID:

HNJFYY

File size:

23.4 MB (1.1 MB Compressed download)

Releases:

Model - no | Property - noDo I need a release?

Dimensions:

2333 x 3500 px | 19.8 x 29.6 cm | 7.8 x 11.7 inches | 300dpi

Date taken:

13 February 2017

Photographer:

Andrew Milligan

More information:

This image could have imperfections as it’s either historical or reportage.

Available for editorial and personal use only. Get in touch for commercial uses.