Steven Berry Scottish Canals head of operational delivery views the drained gondolas at the Falkirk Wheel as the second phase of winter maintenance on the world's only rotating boat lift is currently underway, with Scottish Canals engineers de-watering the structure in order to replace the gate bearings, with the attraction reopening to boat trips on March 8th.
RMID:Image ID:HNJFXE
Image details
Contributor:
PA Images / Alamy Stock PhotoImage ID:
HNJFXEFile size:
57.1 MB (1.7 MB Compressed download)Releases:
Model - no | Property - noDo I need a release?Dimensions:
5472 x 3648 px | 46.3 x 30.9 cm | 18.2 x 12.2 inches | 300dpiDate taken:
13 February 2017Photographer:
Andrew MilliganMore information:
This image could have imperfections as it’s either historical or reportage.
Falkirk Wheel maintenance