. The street railway review . coal is secured by gravity. The nextoperation is to transfer it from the coal pockets to the boiler fur-naci - The plant was not large enough to justify an investmentiu an via bo rate system of coal and ash handling apparatus and stor-age bins and yet the fact that the station was to operate nearly 20bonis each day for every day in the year made it desirable to adoptsome method of doing away with hand firing. The coal handlingdevice indicated on the cross section of the power house was se-lected as combining the advantage of small first investment with theability

. The street railway review . coal is secured by gravity. The nextoperation is to transfer it from the coal pockets to the boiler fur-naci - The plant was not large enough to justify an investmentiu an via bo rate system of coal and ash handling apparatus and stor-age bins and yet the fact that the station was to operate nearly 20bonis each day for every day in the year made it desirable to adoptsome method of doing away with hand firing. The coal handlingdevice indicated on the cross section of the power house was se-lected as combining the advantage of small first investment with theability Stock Photo
Preview

Image details

Contributor:

Reading Room 2020 / Alamy Stock Photo

Image ID:

2CRFH9X

File size:

7.2 MB (236.6 KB Compressed download)

Releases:

Model - no | Property - noDo I need a release?

Dimensions:

2688 x 930 px | 22.8 x 7.9 cm | 9 x 3.1 inches | 300dpi

More information:

This image could have imperfections as it’s either historical or reportage.

. The street railway review . coal is secured by gravity. The nextoperation is to transfer it from the coal pockets to the boiler fur-naci - The plant was not large enough to justify an investmentiu an via bo rate system of coal and ash handling apparatus and stor-age bins and yet the fact that the station was to operate nearly 20bonis each day for every day in the year made it desirable to adoptsome method of doing away with hand firing. The coal handlingdevice indicated on the cross section of the power house was se-lected as combining the advantage of small first investment with theability to reduce the coal handling cost. This apparatus has not yetbeen installed bin the tact that at present the coal and ashes areeach handled at least twice only emphasizes the importance of aninvestment in this part of the plant. The apparatus shown consists of a traveling bin carried upon anelevator leg which rests directly upon and travels along a track par-allel to (be boiler room wall. At frequent intervals along this wall. ELEVATION OF GENERATOR UNITS. plalo a sufficient distancfc to hold the 2x4 in. nailing strips for thehard wood floor. foundations are made of concrete with Portland ce-ment and gravel from a pit near the power plant site. The founda-tions ai psum and present a neat and fin-ranee. The main engine and generator fouihth.The building is divided into bents with trusses spaced on 18 ft.centers. At each oinl a pilaster 3 ft. wide, extending 2 ft.into the engine room, il carrier! 23 ft. ab the cran; runway. The distance between these rails is45 ft., and the lifting capacity of the crane is 15 tons. This cranehas been a great convenience in the erection of the engine roomequipment. The crane is operated by pendai I red by means of a chain hanging directly in front of the gallery which extends the entire length of the plant. There are two hoisting speed for heavy loads, and a fast •rhauling the empty hook and for light loads, and each rale chain. • ion ihouli wh