RM2R3FH6G–Heavylift vessel GPO GRACE with cargo of wind turbine parts for Vineyard wind1 in Halifax Harbour
RM2PGN15D–Buss Terminal Eemshaven, logistics hub for the offshore wind farm industry, from here new wind farms in the North Sea are supplied with equipment, mon
RM2J157T5–Tug and tow EN AVANT 20 with the worlds biggest monopiles passing the Kiel Canal bound for Roenne
RM2R1C4EB–Nordenham, Germany. 12th May, 2023. The logo of Steelwind Nordenham GmbH hangs on a production hall. The company on the Weser produces steel foundations, so-called monopiles, which are used for wind turbines in offshore wind farms. Credit: Hauke-Christian Dittrich/dpa/Alamy Live News
RM2J45B06–Das Firmengebäude der Firma Steelwind in Nordenham-Blexen, Offshore-Unternehmen, Dillinger-Gruppe, Windpark, baut Monopiles für den Windpark Borkum Ri
RMC5YE8T–Monopile's, the foundation piece for a wind turbine on the Walney offshore wind farm, UK.
RMTXFPHX–U. S. President Barack Obama (R) greets workers as he tours Tower Tech Systems, Inc., a manufacturer of utility-scale wind towers and monopiles for on- and off-shore wind development, in Manitowoc, Wisconsin on January 26, 2011. President Obama, Vice President Joe Biden and other members of the President's Cabinet traveled across the country Wednesday to highlight the administration's efforts to rebuild the American economy. UPI/Brian Kersey
RMBND30J–Monopiles waiting to be sunk into the seabed to support offshore wind turbines at Dong Energy's Walney Offshore wind farm.
RM2E1E21C–U. S. President Barack Obama (R) greets workers as he tours Tower Tech Systems, Inc., a manufacturer of utility-scale wind towers and monopiles for on- and off-shore wind development, in Manitowoc, Wisconsin on January 26, 2011. President Obama, Vice President Joe Biden and other members of the President's Cabinet traveled across the country Wednesday to highlight the administration's efforts to rebuild the American economy. Photo by Brian Kersey/UPI/ABACAUSA.COM
RF2KAA0Y4–A closeup of barges with monopiles in an industrial harbor in Roermond
RMH6F72B–Sea Cadet training ship 'Royalist' sails through the Portsmouth Harbour Approaches
RMAD0JB4–The Seaflow Marine Current Turbine project with rotor raised for maintenance off Foreland Point Lynmouth North Devon England
RM2RFXE4R–Halifax, Canada - August 2, 2023: GPO Grace Heavy Lift ship in Halifax Harbour. The ship is being used to transport heavy equipment to the Vineyard Wi
RF2FK1RFB–SIF plant on the Maasvlakte for production of monopiles for windturbines in Rotterdam
RMG4MN0C–Shipping leaving the River Mersey, crossing the Burbo Windfarm, at Crosby, Merseyside, UK. Cammell Laird is used as a base port for the construction of the Gwynt y Môr wind farm components n the Irish Sea. The port area covers around 14 hectares 32 acres and includes a quay of 230 metres. It is from here that the foundations for 160 wind turbines are preassembled, loaded and shipped to the 576 megawatt wind farm in Liverpool Bay positioned around 18 kilometres off the Welsh coast.
RMG4NYHJ–Shipping leaving the River Mersey, crossing the Burbo Windfarm, at Crosby, Merseyside, UK. Cammell Laird Wind Farm components.
RM2R3FH7E–Heavylift vessel GPO GRACE with cargo of wind turbine parts for Vineyard wind1 in Halifax Harbour
RM2PGN1CN–Transport of rotors, blades for wind turbines, by inland freighter on canals in the Netherlands, near Groningen, from manufacturer to on-site assembly
RM2J157R9–Tug and tow EN AVANT 20 with the worlds biggest monopiles passing the Kiel Canal bound for Roenne
RM2R1C4EG–Nordenham, Germany. 12th May, 2023. Numerous components for steel foundations of offshore wind turbines are stored on the premises of Steelwind Nordenham GmbH. The company on the Weser produces steel foundations, so-called monopiles, which are used for wind turbines in offshore wind farms. Credit: Hauke-Christian Dittrich/dpa/Alamy Live News
RM2PMN70W–Heavy Load Carrier FAIRPARTNER passing the Kiel Canal underway from Rostock to the United States East Coast
RMTXFPHW–U. S. President Barack Obama (R) greets workers as he tours Tower Tech Systems, Inc., a manufacturer of utility-scale wind towers and monopiles for on- and off-shore wind development, in Manitowoc, Wisconsin on January 26, 2011. President Obama, Vice President Joe Biden and other members of the President's Cabinet traveled across the country Wednesday to highlight the administration's efforts to rebuild the American economy. UPI/Brian Kersey
RMBND2YR–Monopiles waiting to be sunk into the seabed to support offshore wind turbines at Dong Energy's Walney Offshore wind farm.
RM2E1E20W–U. S. President Barack Obama (R) greets workers as he tours Tower Tech Systems, Inc., a manufacturer of utility-scale wind towers and monopiles for on- and off-shore wind development, in Manitowoc, Wisconsin on January 26, 2011. President Obama, Vice President Joe Biden and other members of the President's Cabinet traveled across the country Wednesday to highlight the administration's efforts to rebuild the American economy. Photo by Brian Kersey/UPI/ABACAUSA.COM
RF2KA8G4J–A closeup of barges with monopiles in an industrial harbor in Roermond
RMH6F71P–Sea Cadet training ship 'Royalist' sails through the Portsmouth Harbour Approaches
RMAD0J7C–The Seaflow Marine Current Turbine project with rotor raised for maintenance off Foreland Point Lynmouth North Devon England
RMG4MN0H–Shipping leaving the River Mersey, crossing the Burbo Windfarm, at Crosby, Merseyside, UK. Cammell Laird is used as a base port for the construction of the Gwynt y Môr wind farm components n the Irish Sea. The port area covers around 14 hectares 32 acres and includes a quay of 230 metres. It is from here that the foundations for 160 wind turbines are preassembled, loaded and shipped to the 576 megawatt wind farm in Liverpool Bay positioned around 18 kilometres off the Welsh coast.
RMG4NYHB–Shipping leaving the River Mersey, crossing the Burbo Windfarm, at Crosby, Merseyside, UK. Cammell Laird Wind Farm components.
RM2R3FH73–Heavylift vessel GPO GRACE with cargo of wind turbine parts for Vineyard wind1 in Halifax Harbour
RM2PGN154–Buss Terminal Eemshaven, logistics hub for the offshore wind farm industry, from here new wind farms in the North Sea are supplied with equipment, mon
RM2R1C4E9–Nordenham, Germany. 12th May, 2023. Numerous components for steel foundations of offshore wind turbines are stored on the premises of Steelwind Nordenham GmbH. The company on the Weser produces steel foundations, so-called monopiles, which are used for wind turbines in offshore wind farms. Credit: Hauke-Christian Dittrich/dpa/Alamy Live News
RMTXFPHY–U. S. President Barack Obama (center right) shakes hands with Melissa Peters (C) as he tours Tower Tech Systems, Inc., a manufacturer of utility-scale wind towers and monopiles for on- and off-shore wind development, with executive Paul Smith (center left) and other executives in Manitowoc, Wisconsin on January 26, 2011. President Obama, Vice President Joe Biden and other members of the President's Cabinet traveled across the country Wednesday to highlight the administration's efforts to rebuild the American economy. UPI/Brian Kersey
RMBND2MP–Dong Energy's off shore, Walney Wind Farm using a jack up barge to install the monopiles and transition pieces.
RM2E1E213–U. S. President Barack Obama (center right) shakes hands with Melissa Peters (C) as he tours Tower Tech Systems, Inc., a manufacturer of utility-scale wind towers and monopiles for on- and off-shore wind development, with executive Paul Smith (center left) and other executives in Manitowoc, Wisconsin on January 26, 2011. President Obama, Vice President Joe Biden and other members of the President's Cabinet traveled across the country Wednesday to highlight the administration's efforts to rebuild the American economy. Photo by Brian Kersey/UPI/ABACAUSA.COM
RF2KADY1C–A closeup of barges with monopiles in an industrial harbor in Roermond
RMAD0J5C–The Seaflow Marine Current Turbine project off the coast of Lynmouth North Devon England UK
RMG4NYJK–Shipping leaving the River Mersey, crossing the Burbo Windfarm, at Crosby, Merseyside, UK. Cammell Laird Wind Farm components.
RM2R3FH1T–Heavylift vessel GPO GRACE with cargo of wind turbine parts for Vineyard wind1 in Halifax Harbour
RM2PGN110–Buss Terminal Eemshaven, logistics hub for the offshore wind farm industry, from here new wind farms in the North Sea are supplied with equipment, mon
RM2R58C3J–the Orion Offshore Heavy Lift crane moving wind turbine monopiles from the GPO Grace
RM2R19AWK–Nordenham, Germany. 12th May, 2023. Numerous components for steel foundations of offshore wind turbines are stored on the premises of Steelwind Nordenham GmbH. Chancellor Scholz visited the production of steel foundations, so-called monopiles, for wind turbines in offshore wind farms at Steelwind Nordenham GmbH. Credit: Hauke-Christian Dittrich/dpa/Alamy Live News
RMBND2KN–Dong Energy's off shore, Walney Wind Farm using a jack up barge to install the monopiles and transition pieces.
RF2KAD852–A closeup of barges with monopiles in an industrial harbor in Roermond
RMC5YEBT–Monopile's, the foundation piece for a wind turbine on the Walney offshore wind farm, UK.
RMBND3XT–Monopiles waiting to be sunk into the seabed to support offshore wind turbines at Dong Energy's Walney Offshore wind farm.
RMAD0J74–The Seaflow Marine Current Turbine project with rotor raised for maintenance off Foreland Point Lynmouth North Devon England
RMG4NXFC–Shipping leaving the River Mersey, crossing the Burbo Windfarm, at Crosby, Merseyside, UK. Cammell Laird Wind Farm components.
RM2PGN113–Buss Terminal Eemshaven, logistics hub for the offshore wind farm industry, from here new wind farms in the North Sea are supplied with equipment, mon
RM2R58C4A–the Orion Offshore Heavy Lift crane moving wind turbine monopiles from the GPO Grace
RM2R195BD–Nordenham, Germany. 12th May, 2023. German Chancellor Olaf Scholz (SPD) speaks to journalists while standing in front of numerous components for the steel foundations of wind turbines. Scholz visited the production of steel foundations, so-called monopiles, for wind turbines in offshore wind farms at Steelwind Nordenham GmbH. Credit: Hauke-Christian Dittrich/dpa/Alamy Live News
RM2R58C2C–the Orion Offshore Heavy Lift crane moving wind turbine monopiles from the GPO Grace
RM2RAT6H1–Halifax, Nova Scotia, Canada. July 5th, 2023. The GPO Grace, a Heavylift vessel, loaded with wind turbine monopiles destined for the USA's first utility-scale offshore wind energy project off the coast of Massachusetts enters the Port of Halifax where the project has set up part of its staging area. The ship is seen here passing the George Island lighthouse.
RM2R58C2T–the Orion Offshore Heavy Lift crane moving wind turbine monopiles from the GPO Grace
RF2KAA160–A closeup of a steel factory in an industrial harbor in Roermond
RM2RAT6HC–Halifax, Nova Scotia, Canada. July 5th, 2023. The GPO Grace, a Heavylift vessel, loaded with wind turbine monopiles destined for the USA's first utility-scale offshore wind energy project off the coast of Massachusetts enters the Port of Halifax where the project has set up part of its staging area.
RMBND3JR–Dong Energy's off shore, Walney Wind Farm using a jack up barge to install the monopiles and transition pieces.
RMAD0JB8–The Seaflow Marine Current Turbine project with rotor raised for maintenance off Foreland Point Lynmouth North Devon England
RM2PGN1HX–Two-blade rotor, wind turbine with two rotor blades from 2-B Energy in the industrial harbour of Eemshaven, wind turbine, wind power plant
RM2R19AX8–Nordenham, Germany. 12th May, 2023. An employee of Steelwind Nordenham GmbH works on a section of a steel foundation for offshore wind turbines in a production hall. Scholz visited the production of steel foundations, so-called monopiles, for wind turbines in offshore wind farms at Steelwind Nordenham GmbH. Credit: Hauke-Christian Dittrich/dpa/Alamy Live News
RF2KA8679–A closeup of a steel factory in an industrial harbor in Roermond
RM2RAT6HJ–Halifax, Nova Scotia, Canada. July 5th, 2023. The GPO Grace, a Heavylift vessel, loaded with wind turbine monopiles destined for the USA's first utility-scale offshore wind energy project off the coast of Massachusetts enters the Port of Halifax where the project has set up part of its staging area.
RMAD0J63–The Seaflow Marine Current Turbine project off Foreland Point near Lynmouth North Devon England
RM2PGN1D5–Transport of rotors, blades for wind turbines, by inland freighter on canals in the Netherlands, near Groningen, from manufacturer to on-site assembly
RM2R19AX1–Nordenham, Germany. 12th May, 2023. An employee of Steelwind Nordenham GmbH works on a section of a steel foundation for offshore wind turbines in a production hall. Scholz visited the production of steel foundations, so-called monopiles, for wind turbines in offshore wind farms at Steelwind Nordenham GmbH. Credit: Hauke-Christian Dittrich/dpa/Alamy Live News
RMAD0J77–The Seaflow Marine Current Tubine project with rotor raised for maintenance off Foreland Point Lynmouth North Devon
RM2PGN15J–Offshore working vessels, Buss Terminal Eemshaven, logistics hub for the offshore wind farm industry, from here new wind farms in the North Sea are su
RM2R19898–Nordenham, Germany. 12th May, 2023. German Chancellor Olaf Scholz (SPD) stands with numerous employees of Steelwind Nordenham GmbH in front of a component for the steel foundation of a wind turbine at sea. Scholz visited the production of steel foundations, so-called monopiles, for wind turbines in offshore wind farms at Steelwind Nordenham GmbH. Credit: Hauke-Christian Dittrich/dpa/Alamy Live News
RMAD0J8A–The Seaflow Marine Current Turbine project off Foreland Point Lynmouth North Devon England
RM2PGN1HC–Wind turbine, wind power station
RM2R195BN–Nordenham, Germany. 12th May, 2023. German Chancellor Olaf Scholz (l, SPD) speaks to journalists while standing with Andreas Liessem, Managing Director of Steelwind Nordenham GmbH, in front of numerous components for the steel foundations of wind turbines. Scholz visited the production of steel foundations, so-called monopiles, for wind turbines in offshore wind farms at Steelwind Nordenham GmbH. Credit: Hauke-Christian Dittrich/dpa/Alamy Live News
RMAD0J60–The Seaflow Marine Current Turbine project off the coast of Lynmouth North Devon England
RM2PGN1J5–Two-blade rotor, wind turbine with two rotor blades from 2-B Energy in the industrial harbour of Eemshaven, wind turbine, wind power plant
RM2R19892–Nordenham, Germany. 12th May, 2023. Andreas Liessem (r), Managing Director of Steelwind Nordenham GmbH, speaks to journalists while standing with German Chancellor Olaf Scholz (SPD) in front of numerous components for the steel foundations of wind turbines. Scholz visited the production of steel foundations, so-called monopiles, for wind turbines in offshore wind farms at Steelwind Nordenham GmbH. Credit: Hauke-Christian Dittrich/dpa/Alamy Live News
RMAD0JA2–The Seaflow Marine Current Turbine project with rotor raised for maintenance off Foreland Point Lynmouth North Devon England
RM2PGN107–Buss Terminal Eemshaven, logistics hub for the offshore wind farm industry, from here new wind farms in the North Sea are supplied with equipment, mon
RM2R1C548–Nordenham, Germany. 12th May, 2023. Adem Dener (l-r), a production employee at Steelwind Nordenham GmbH, explains to German Chancellor Olaf Scholz (SPD) and Jonathan Weber, member of the Executive Board of Dillinger Hüttenwerke AG, the function of a bending machine for the production of steel foundations used for wind turbines. Scholz visited the production of steel foundations, so-called monopiles, for wind turbines in offshore wind farms at Steelwind Nordenham GmbH. Credit: Hauke-Christian Dittrich/dpa/Alamy Live News
RMAD0J94–The Seaflow Marine Current Turbine project with rotor raised for maintenance off Foreland Point Lynmouth North Devon England
RM2PGN1CF–Offshore working vessels, Buss Terminal Eemshaven, logistics hub for the offshore wind farm industry, from here new wind farms in the North Sea are su
RM2R19AWM–Nordenham, Germany. 12th May, 2023. Jonathan Weber (l-r), member of the Executive Board of Dillinger Hüttenwerke AG, German Chancellor Olaf Scholz (SPD) and Andreas Liessem, Managing Director of Steelwind Nordenham GmbH, walk through a production hall at Steelwind Nordenham GmbH, where steel foundations for offshore wind turbines are manufactured. Scholz visited the production of steel foundations, so-called monopiles, for wind turbines in offshore wind farms at Steelwind Nordenham GmbH. Credit: Hauke-Christian Dittrich/dpa/Alamy Live News
RMAD0J6E–The Seaflow Marine Current Turbine project with rotor raised for maintenance off Foreland Point Lynmouth North Devon England
RM2PGN19A–Offshore working vessels, Buss Terminal Eemshaven, logistics hub for the offshore wind farm industry, from here new wind farms in the North Sea are su
RM2R1C54A–Nordenham, Germany. 12th May, 2023. Janina Patricia Schweitzer (l-r), a production employee at Steelwind Nordenham GmbH, shows German Chancellor Olaf Scholz (SPD), Andreas Liessem, managing director of Steelwind Nordenham GmbH, and Jörg Redmer, a production employee, the function of the longitudinal internal seam welding machine used to manufacture steel foundations for wind turbines. Scholz visited the production of steel foundations, so-called monopiles, for wind turbines in offshore wind farms at Steelwind Nordenham GmbH. Credit: Hauke-Christian Dittrich/dpa/Alamy Live News
RMAD0JA6–The Seaflow Marine Current Turbine project with rotor raised for maintenance off Foreland Point Lynmouth North Devon England
RM2PGN0MN–Buss Terminal Eemshaven, logistics hub for the offshore wind farm industry, from here new wind farms in the North Sea are supplied with equipment, mon
RM2R19AY1–Nordenham, Germany. 12th May, 2023. Janina Patricia Schweitzer (l-r), a production employee at Steelwind Nordenham GmbH, shows German Chancellor Olaf Scholz (SPD), Andreas Liessem, managing director of Steelwind Nordenham GmbH, and Jörg Redmer, a production employee, the function of the longitudinal internal seam welding machine used to manufacture steel foundations for wind turbines. Scholz visited the production of steel foundations, so-called monopiles, for wind turbines in offshore wind farms at Steelwind Nordenham GmbH. Credit: Hauke-Christian Dittrich/dpa/Alamy Live News
RMAD0J6A–The Seaflow Marine Current Turbine project with rotor raised for maintenance off Foreland Point Lynmouth North Devon England
RM2PGN0MG–Buss Terminal Eemshaven, logistics hub for the offshore wind farm industry, from here new wind farms in the North Sea are supplied with equipment, mon
RM2R19AXG–12 May 2023, Lower Saxony, Nordenham: Janina Patricia Schweitzer (l-r), a production employee at Steelwind Nordenham GmbH, shows German Chancellor Olaf Scholz (SPD), Andreas Liessem, Managing Director of Steelwind Nordenham GmbH, Jörg Redmer, a production employee, and Jonathan Weber, a member of the Board of Management of Dillinger Hüttenwerke AG, the function of the longitudinal seam welding machine used to manufacture steel foundations for wind turbines. Scholz visited the production of steel foundations, so-called monopiles, for wind turbines in offshore wind farms at Steelwind Nordenham G
RMDFA4G0–A 73.5 m long steel tube weighing 900 t is erected with the installation platform 'Svanen' at windpark Baltic 2 about 32 km north of Ruegen, Germany, 01 October 2013. The monopile will then be rammed about 35 m into the ground with a hydraulic hammer. 39 monopiles in total, manufactured by EEW Special Pipe Constructions GmbH in Rostock, will be installed at Baltic 2 in the next months. Baltic 2 will consits of 80 wind turbines providing a total output of 288 megawatts when completed in 2014. Photo: STEFAN SAUER
RMAD0J6D–The Seaflow Marine Current Turbine project with rotor raised for maintenance off Foreland Point Lynmouth North Devon England
RM2PGN0T7–Buss Terminal Eemshaven, logistics hub for the offshore wind farm industry, from here new wind farms in the North Sea are supplied with equipment, mon
RMDFA4G1–A 73.5 m long steel tube weighing 900 t is erected with the installation platform 'Svanen' at windpark Baltic 2 about 32 km north of Ruegen, Germany, 01 October 2013. The monopile will then be rammed about 35 m into the ground with a hydraulic hammer. 39 monopiles in total, manufactured by EEW Special Pipe Constructions GmbH in Rostock, will be installed at Baltic 2 in the next months. Baltic 2 will consits of 80 wind turbines providing a total output of 288 megawatts when completed in 2014. Photo: STEFAN SAUER
RMAD0J90–The Seaflow Marine Current Turbine project with rotor raised for maintenance off Foreland Point Lynmouth North Devon England
RM2PGN18X–Offshore working vessels, Buss Terminal Eemshaven, logistics hub for the offshore wind farm industry, from here new wind farms in the North Sea are su
RMDFA4FY–A 73.5 m long steel tube weighing 900 t is erected with the installation platform 'Svanen' at windpark Baltic 2 about 32 km north of Ruegen, Germany, 01 October 2013. The monopile will then be rammed about 35 m into the ground with a hydraulic hammer. 39 monopiles in total, manufactured by EEW Special Pipe Constructions GmbH in Rostock, will be installed at Baltic 2 in the next months. Baltic 2 will consits of 80 wind turbines providing a total output of 288 megawatts when completed in 2014. Photo: STEFAN SAUER
RMECX7B9–The construction of foundations for the North Sea wind park 'Sandbank' 90 kilometers to the West from Sylt begins at the metal company EEW Special Pipe Constructions GmbH at the sea harbor in Rostock, Germany, 18 December 2014. 72 monopiles of a length of up to 70 meters were built, for which 52,000 tons of steel were used. Photo: Bernd Wuestneck/dpa
RMAD0J87–The Seaflow Marine Current Turbine project off Foreland Point Lynmouth North Devon England
RM2PGN194–Offshore working vessels, Buss Terminal Eemshaven, logistics hub for the offshore wind farm industry, from here new wind farms in the North Sea are su
Download Confirmation
Please complete the form below. The information provided will be included in your download confirmation