Harefield, UK. 3rd August, 2023. Construction of the HS2 High Speed Rail Colne Valley Viaduct piers across the lake formerly occupied by the Hillingdon Outdoor Activities Centre (HOAC). The popular and much loved HOAC has had to close down due to HS2 works. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, calling the project as it stands “unachievable”. HS2 CEO Mark Thurston resigned two weeks ago. Credit: Maureen McLean/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-3rd-august-2023-construction-of-the-hs2-high-speed-rail-colne-valley-viaduct-piers-across-the-lake-formerly-occupied-by-the-hillingdon-outdoor-activities-centre-hoac-the-popular-and-much-loved-hoac-has-had-to-close-down-due-to-hs2-works-the-infrastructure-and-projects-authority-has-placed-the-hs2-multi-billion-pound-project-between-london-and-birmingham-on-the-danger-list-calling-the-project-as-it-stands-unachievable-hs2-ceo-mark-thurston-resigned-two-weeks-ago-credit-maureen-mcleanalamy-live-news-image560317309.html
RM2RFGJCD–Harefield, UK. 3rd August, 2023. Construction of the HS2 High Speed Rail Colne Valley Viaduct piers across the lake formerly occupied by the Hillingdon Outdoor Activities Centre (HOAC). The popular and much loved HOAC has had to close down due to HS2 works. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, calling the project as it stands “unachievable”. HS2 CEO Mark Thurston resigned two weeks ago. Credit: Maureen McLean/Alamy Live News
Harefield, UK. 13th February, 2021. Ice is pictured on the surface of HOAC lake in the Colne Valley. The current cold spell is expected to be replaced by milder conditions after tomorrow. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-13th-february-2021-ice-is-pictured-on-the-surface-of-hoac-lake-in-the-colne-valley-the-current-cold-spell-is-expected-to-be-replaced-by-milder-conditions-after-tomorrow-credit-mark-kerrisonalamy-live-news-image403539301.html
RM2ECEPDW–Harefield, UK. 13th February, 2021. Ice is pictured on the surface of HOAC lake in the Colne Valley. The current cold spell is expected to be replaced by milder conditions after tomorrow. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 3rd August, 2023. Construction of the HS2 High Speed Rail Colne Valley Viaduct piers across the lake formerly occupied by the Hillingdon Outdoor Activities Centre (HOAC). The popular and much loved HOAC has had to close down due to HS2 works. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, calling the project as it stands “unachievable”. HS2 CEO Mark Thurston resigned two weeks ago. Credit: Maureen McLean/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-3rd-august-2023-construction-of-the-hs2-high-speed-rail-colne-valley-viaduct-piers-across-the-lake-formerly-occupied-by-the-hillingdon-outdoor-activities-centre-hoac-the-popular-and-much-loved-hoac-has-had-to-close-down-due-to-hs2-works-the-infrastructure-and-projects-authority-has-placed-the-hs2-multi-billion-pound-project-between-london-and-birmingham-on-the-danger-list-calling-the-project-as-it-stands-unachievable-hs2-ceo-mark-thurston-resigned-two-weeks-ago-credit-maureen-mcleanalamy-live-news-image560317346.html
RM2RFGJDP–Harefield, UK. 3rd August, 2023. Construction of the HS2 High Speed Rail Colne Valley Viaduct piers across the lake formerly occupied by the Hillingdon Outdoor Activities Centre (HOAC). The popular and much loved HOAC has had to close down due to HS2 works. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, calling the project as it stands “unachievable”. HS2 CEO Mark Thurston resigned two weeks ago. Credit: Maureen McLean/Alamy Live News
Harefield, UK. 13th February, 2021. Ice is pictured alongside a jetty on the edge of a lake in the Colne Valley. The current spell of cold weather is expected to be replaced by milder conditions after tomorrow. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-13th-february-2021-ice-is-pictured-alongside-a-jetty-on-the-edge-of-a-lake-in-the-colne-valley-the-current-spell-of-cold-weather-is-expected-to-be-replaced-by-milder-conditions-after-tomorrow-credit-mark-kerrisonalamy-live-news-image403539288.html
RM2ECEPDC–Harefield, UK. 13th February, 2021. Ice is pictured alongside a jetty on the edge of a lake in the Colne Valley. The current spell of cold weather is expected to be replaced by milder conditions after tomorrow. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 3rd August, 2023. Construction of the HS2 High Speed Rail Colne Valley Viaduct piers across the lake formerly occupied by the Hillingdon Outdoor Activities Centre (HOAC). The popular and much loved HOAC has had to close down due to HS2 works. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, calling the project as it stands “unachievable”. HS2 CEO Mark Thurston resigned two weeks ago. Credit: Maureen McLean/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-3rd-august-2023-construction-of-the-hs2-high-speed-rail-colne-valley-viaduct-piers-across-the-lake-formerly-occupied-by-the-hillingdon-outdoor-activities-centre-hoac-the-popular-and-much-loved-hoac-has-had-to-close-down-due-to-hs2-works-the-infrastructure-and-projects-authority-has-placed-the-hs2-multi-billion-pound-project-between-london-and-birmingham-on-the-danger-list-calling-the-project-as-it-stands-unachievable-hs2-ceo-mark-thurston-resigned-two-weeks-ago-credit-maureen-mcleanalamy-live-news-image560317251.html
RM2RFGJAB–Harefield, UK. 3rd August, 2023. Construction of the HS2 High Speed Rail Colne Valley Viaduct piers across the lake formerly occupied by the Hillingdon Outdoor Activities Centre (HOAC). The popular and much loved HOAC has had to close down due to HS2 works. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, calling the project as it stands “unachievable”. HS2 CEO Mark Thurston resigned two weeks ago. Credit: Maureen McLean/Alamy Live News
Harefield, UK. 13th February, 2021. Small icicles are formed around the edge of a sheet of ice above the surface of a lake in the Colne Valley. The current cold spell is expected to be replaced by milder conditions after tomorrow. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-13th-february-2021-small-icicles-are-formed-around-the-edge-of-a-sheet-of-ice-above-the-surface-of-a-lake-in-the-colne-valley-the-current-cold-spell-is-expected-to-be-replaced-by-milder-conditions-after-tomorrow-credit-mark-kerrisonalamy-live-news-image403539285.html
RM2ECEPD9–Harefield, UK. 13th February, 2021. Small icicles are formed around the edge of a sheet of ice above the surface of a lake in the Colne Valley. The current cold spell is expected to be replaced by milder conditions after tomorrow. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 3rd August, 2023. Construction of the HS2 High Speed Rail Colne Valley Viaduct piers across the lake formerly occupied by the Hillingdon Outdoor Activities Centre (HOAC). The popular and much loved HOAC has had to close down due to HS2 works. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, calling the project as it stands “unachievable”. HS2 CEO Mark Thurston resigned two weeks ago. Credit: Maureen McLean/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-3rd-august-2023-construction-of-the-hs2-high-speed-rail-colne-valley-viaduct-piers-across-the-lake-formerly-occupied-by-the-hillingdon-outdoor-activities-centre-hoac-the-popular-and-much-loved-hoac-has-had-to-close-down-due-to-hs2-works-the-infrastructure-and-projects-authority-has-placed-the-hs2-multi-billion-pound-project-between-london-and-birmingham-on-the-danger-list-calling-the-project-as-it-stands-unachievable-hs2-ceo-mark-thurston-resigned-two-weeks-ago-credit-maureen-mcleanalamy-live-news-image560317404.html
RM2RFGJFT–Harefield, UK. 3rd August, 2023. Construction of the HS2 High Speed Rail Colne Valley Viaduct piers across the lake formerly occupied by the Hillingdon Outdoor Activities Centre (HOAC). The popular and much loved HOAC has had to close down due to HS2 works. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, calling the project as it stands “unachievable”. HS2 CEO Mark Thurston resigned two weeks ago. Credit: Maureen McLean/Alamy Live News
Harefield, UK. 13th February, 2021. Small icicles are formed around the edge of a sheet of ice above the surface of a lake in the Colne Valley. The current cold spell is expected to be replaced by milder conditions after tomorrow. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-13th-february-2021-small-icicles-are-formed-around-the-edge-of-a-sheet-of-ice-above-the-surface-of-a-lake-in-the-colne-valley-the-current-cold-spell-is-expected-to-be-replaced-by-milder-conditions-after-tomorrow-credit-mark-kerrisonalamy-live-news-image403539289.html
RM2ECEPDD–Harefield, UK. 13th February, 2021. Small icicles are formed around the edge of a sheet of ice above the surface of a lake in the Colne Valley. The current cold spell is expected to be replaced by milder conditions after tomorrow. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 3rd August, 2023. Construction of the HS2 High Speed Rail Colne Valley Viaduct piers across the lake formerly occupied by the Hillingdon Outdoor Activities Centre (HOAC). The popular and much loved HOAC has had to close down due to HS2 works. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, calling the project as it stands “unachievable”. HS2 CEO Mark Thurston resigned two weeks ago. Credit: Maureen McLean/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-3rd-august-2023-construction-of-the-hs2-high-speed-rail-colne-valley-viaduct-piers-across-the-lake-formerly-occupied-by-the-hillingdon-outdoor-activities-centre-hoac-the-popular-and-much-loved-hoac-has-had-to-close-down-due-to-hs2-works-the-infrastructure-and-projects-authority-has-placed-the-hs2-multi-billion-pound-project-between-london-and-birmingham-on-the-danger-list-calling-the-project-as-it-stands-unachievable-hs2-ceo-mark-thurston-resigned-two-weeks-ago-credit-maureen-mcleanalamy-live-news-image560317328.html
RM2RFGJD4–Harefield, UK. 3rd August, 2023. Construction of the HS2 High Speed Rail Colne Valley Viaduct piers across the lake formerly occupied by the Hillingdon Outdoor Activities Centre (HOAC). The popular and much loved HOAC has had to close down due to HS2 works. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, calling the project as it stands “unachievable”. HS2 CEO Mark Thurston resigned two weeks ago. Credit: Maureen McLean/Alamy Live News
Harefield, UK. 13th February, 2021. Icicles are formed beneath sheets of ice around reeds on the edge of a lake in the Colne Valley. The current spell of cold weather is expected to be replaced by milder conditions after tomorrow. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-13th-february-2021-icicles-are-formed-beneath-sheets-of-ice-around-reeds-on-the-edge-of-a-lake-in-the-colne-valley-the-current-spell-of-cold-weather-is-expected-to-be-replaced-by-milder-conditions-after-tomorrow-credit-mark-kerrisonalamy-live-news-image403539305.html
RM2ECEPE1–Harefield, UK. 13th February, 2021. Icicles are formed beneath sheets of ice around reeds on the edge of a lake in the Colne Valley. The current spell of cold weather is expected to be replaced by milder conditions after tomorrow. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 21 January, 2020. The sun rises behind a lake in Colne Valley Regional Park across which a 3.4 km-long viaduct would be constructed should plans for the HS2 high-speed rail link be approved. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-21-january-2020-the-sun-rises-behind-a-lake-in-colne-valley-regional-park-across-which-a-34-km-long-viaduct-would-be-constructed-should-plans-for-the-hs2-high-speed-rail-link-be-approved-credit-mark-kerrisonalamy-live-news-image340667517.html
RM2AP6MW1–Harefield, UK. 21 January, 2020. The sun rises behind a lake in Colne Valley Regional Park across which a 3.4 km-long viaduct would be constructed should plans for the HS2 high-speed rail link be approved. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 19 January, 2020. A view across a lake in Colne Valley Regional Park across which a 3.4 km-long viaduct would be constructed should plans for the HS2 high-speed rail link be approved. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-19-january-2020-a-view-across-a-lake-in-colne-valley-regional-park-across-which-a-34-km-long-viaduct-would-be-constructed-should-plans-for-the-hs2-high-speed-rail-link-be-approved-credit-mark-kerrisonalamy-live-news-image340481435.html
RM2ANX7F7–Harefield, UK. 19 January, 2020. A view across a lake in Colne Valley Regional Park across which a 3.4 km-long viaduct would be constructed should plans for the HS2 high-speed rail link be approved. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 13th February, 2021. Small icicles are formed beneath a sheet of ice around reeds on the edge of the Hillingdon Outdoor Activities Centre lake in the Colne Valley. The current spell of cold weather is expected to be replaced by milder conditions after tomorrow. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-13th-february-2021-small-icicles-are-formed-beneath-a-sheet-of-ice-around-reeds-on-the-edge-of-the-hillingdon-outdoor-activities-centre-lake-in-the-colne-valley-the-current-spell-of-cold-weather-is-expected-to-be-replaced-by-milder-conditions-after-tomorrow-credit-mark-kerrisonalamy-live-news-image403784510.html
RM2ECWY7A–Harefield, UK. 13th February, 2021. Small icicles are formed beneath a sheet of ice around reeds on the edge of the Hillingdon Outdoor Activities Centre lake in the Colne Valley. The current spell of cold weather is expected to be replaced by milder conditions after tomorrow. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 3rd August, 2023. Construction of the HS2 High Speed Rail Colne Valley Viaduct piers across the lake formerly occupied by the Hillingdon Outdoor Activities Centre (HOAC). The popular and much loved HOAC has had to close down due to HS2 works. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, calling the project as it stands “unachievable”. HS2 CEO Mark Thurston resigned two weeks ago. Credit: Maureen McLean/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-3rd-august-2023-construction-of-the-hs2-high-speed-rail-colne-valley-viaduct-piers-across-the-lake-formerly-occupied-by-the-hillingdon-outdoor-activities-centre-hoac-the-popular-and-much-loved-hoac-has-had-to-close-down-due-to-hs2-works-the-infrastructure-and-projects-authority-has-placed-the-hs2-multi-billion-pound-project-between-london-and-birmingham-on-the-danger-list-calling-the-project-as-it-stands-unachievable-hs2-ceo-mark-thurston-resigned-two-weeks-ago-credit-maureen-mcleanalamy-live-news-image560317338.html
RM2RFGJDE–Harefield, UK. 3rd August, 2023. Construction of the HS2 High Speed Rail Colne Valley Viaduct piers across the lake formerly occupied by the Hillingdon Outdoor Activities Centre (HOAC). The popular and much loved HOAC has had to close down due to HS2 works. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, calling the project as it stands “unachievable”. HS2 CEO Mark Thurston resigned two weeks ago. Credit: Maureen McLean/Alamy Live News
Harefield, UK. 13th February, 2021. Small icicles are formed beneath a sheet of ice around reeds on the edge of the Hillingdon Outdoor Activities Centre lake in the Colne Valley. The current spell of cold weather is expected to be replaced by milder conditions after tomorrow. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-13th-february-2021-small-icicles-are-formed-beneath-a-sheet-of-ice-around-reeds-on-the-edge-of-the-hillingdon-outdoor-activities-centre-lake-in-the-colne-valley-the-current-spell-of-cold-weather-is-expected-to-be-replaced-by-milder-conditions-after-tomorrow-credit-mark-kerrisonalamy-live-news-image403784535.html
RM2ECWY87–Harefield, UK. 13th February, 2021. Small icicles are formed beneath a sheet of ice around reeds on the edge of the Hillingdon Outdoor Activities Centre lake in the Colne Valley. The current spell of cold weather is expected to be replaced by milder conditions after tomorrow. Credit: Mark Kerrison/Alamy Live News
London, UK. 16th April, 2024. Segments of the Colne Valley viaduct for the HS2 high-speed rail link are pictured above Harefield Lake No. 2. The viaduct will carry HS2 across lakes and watercourses in the Colne Valley Regional Park. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/london-uk-16th-april-2024-segments-of-the-colne-valley-viaduct-for-the-hs2-high-speed-rail-link-are-pictured-above-harefield-lake-no-2-the-viaduct-will-carry-hs2-across-lakes-and-watercourses-in-the-colne-valley-regional-park-credit-mark-kerrisonalamy-live-news-image603569883.html
RM2X1XYF7–London, UK. 16th April, 2024. Segments of the Colne Valley viaduct for the HS2 high-speed rail link are pictured above Harefield Lake No. 2. The viaduct will carry HS2 across lakes and watercourses in the Colne Valley Regional Park. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 19 January, 2020. A fisherman checks his fishing rods as early morning mist lies across a lake in Colne Valley Regional Park across which a 3.4 km-long viaduct would be constructed should plans for the HS2 high-speed rail link be approved. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-19-january-2020-a-fisherman-checks-his-fishing-rods-as-early-morning-mist-lies-across-a-lake-in-colne-valley-regional-park-across-which-a-34-km-long-viaduct-would-be-constructed-should-plans-for-the-hs2-high-speed-rail-link-be-approved-credit-mark-kerrisonalamy-live-news-image340481437.html
RM2ANX7F9–Harefield, UK. 19 January, 2020. A fisherman checks his fishing rods as early morning mist lies across a lake in Colne Valley Regional Park across which a 3.4 km-long viaduct would be constructed should plans for the HS2 high-speed rail link be approved. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 6th April, 2021. Works for the HS2 high-speed rail link are pictured close to HOAC lake. Thousands of trees have already been felled in the Colne Valley where HS2 works will include the construction of a Colne Valley Viaduct across lakes and waterways and electricity pylon relocation. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-6th-april-2021-works-for-the-hs2-high-speed-rail-link-are-pictured-close-to-hoac-lake-thousands-of-trees-have-already-been-felled-in-the-colne-valley-where-hs2-works-will-include-the-construction-of-a-colne-valley-viaduct-across-lakes-and-waterways-and-electricity-pylon-relocation-credit-mark-kerrisonalamy-live-news-image417665838.html
RM2F7E912–Harefield, UK. 6th April, 2021. Works for the HS2 high-speed rail link are pictured close to HOAC lake. Thousands of trees have already been felled in the Colne Valley where HS2 works will include the construction of a Colne Valley Viaduct across lakes and waterways and electricity pylon relocation. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 10th November, 2023. Construction works are pictured in Harefield Lake No. 2 for the Colne Valley viaduct for the HS2 high-speed rail link. The viaduct requires 292 piles and will carry HS2 across lakes and watercourses in the Colne Valley Regional Park. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-10th-november-2023-construction-works-are-pictured-in-harefield-lake-no-2-for-the-colne-valley-viaduct-for-the-hs2-high-speed-rail-link-the-viaduct-requires-292-piles-and-will-carry-hs2-across-lakes-and-watercourses-in-the-colne-valley-regional-park-credit-mark-kerrisonalamy-live-news-image572305638.html
RM2T72NK2–Harefield, UK. 10th November, 2023. Construction works are pictured in Harefield Lake No. 2 for the Colne Valley viaduct for the HS2 high-speed rail link. The viaduct requires 292 piles and will carry HS2 across lakes and watercourses in the Colne Valley Regional Park. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 3rd August, 2023. Construction of the HS2 High Speed Rail Colne Valley Viaduct piers across the lake formerly occupied by the Hillingdon Outdoor Activities Centre (HOAC). The popular and much loved HOAC has had to close down due to HS2 works. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, calling the project as it stands “unachievable”. HS2 CEO Mark Thurston resigned two weeks ago. Credit: Maureen McLean/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-3rd-august-2023-construction-of-the-hs2-high-speed-rail-colne-valley-viaduct-piers-across-the-lake-formerly-occupied-by-the-hillingdon-outdoor-activities-centre-hoac-the-popular-and-much-loved-hoac-has-had-to-close-down-due-to-hs2-works-the-infrastructure-and-projects-authority-has-placed-the-hs2-multi-billion-pound-project-between-london-and-birmingham-on-the-danger-list-calling-the-project-as-it-stands-unachievable-hs2-ceo-mark-thurston-resigned-two-weeks-ago-credit-maureen-mcleanalamy-live-news-image560317230.html
RM2RFGJ9J–Harefield, UK. 3rd August, 2023. Construction of the HS2 High Speed Rail Colne Valley Viaduct piers across the lake formerly occupied by the Hillingdon Outdoor Activities Centre (HOAC). The popular and much loved HOAC has had to close down due to HS2 works. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, calling the project as it stands “unachievable”. HS2 CEO Mark Thurston resigned two weeks ago. Credit: Maureen McLean/Alamy Live News
Harefield, UK. 10th November, 2023. Construction works are pictured in Harefield Lake No. 2 for the Colne Valley viaduct for the HS2 high-speed rail link. The viaduct requires 292 piles and will carry HS2 across lakes and watercourses in the Colne Valley Regional Park. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-10th-november-2023-construction-works-are-pictured-in-harefield-lake-no-2-for-the-colne-valley-viaduct-for-the-hs2-high-speed-rail-link-the-viaduct-requires-292-piles-and-will-carry-hs2-across-lakes-and-watercourses-in-the-colne-valley-regional-park-credit-mark-kerrisonalamy-live-news-image572305628.html
RM2T72NJM–Harefield, UK. 10th November, 2023. Construction works are pictured in Harefield Lake No. 2 for the Colne Valley viaduct for the HS2 high-speed rail link. The viaduct requires 292 piles and will carry HS2 across lakes and watercourses in the Colne Valley Regional Park. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 3rd August, 2023. Construction of the HS2 High Speed Rail Colne Valley Viaduct piers across the lake formerly occupied by the Hillingdon Outdoor Activities Centre (HOAC). The popular and much loved HOAC has had to close down due to HS2 works. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, calling the project as it stands “unachievable”. HS2 CEO Mark Thurston resigned two weeks ago. Credit: Maureen McLean/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-3rd-august-2023-construction-of-the-hs2-high-speed-rail-colne-valley-viaduct-piers-across-the-lake-formerly-occupied-by-the-hillingdon-outdoor-activities-centre-hoac-the-popular-and-much-loved-hoac-has-had-to-close-down-due-to-hs2-works-the-infrastructure-and-projects-authority-has-placed-the-hs2-multi-billion-pound-project-between-london-and-birmingham-on-the-danger-list-calling-the-project-as-it-stands-unachievable-hs2-ceo-mark-thurston-resigned-two-weeks-ago-credit-maureen-mcleanalamy-live-news-image560317134.html
RM2RFGJ66–Harefield, UK. 3rd August, 2023. Construction of the HS2 High Speed Rail Colne Valley Viaduct piers across the lake formerly occupied by the Hillingdon Outdoor Activities Centre (HOAC). The popular and much loved HOAC has had to close down due to HS2 works. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, calling the project as it stands “unachievable”. HS2 CEO Mark Thurston resigned two weeks ago. Credit: Maureen McLean/Alamy Live News
Harefield, UK. 10th November, 2023. Construction works are pictured in Harefield Lake No. 2 for the Colne Valley viaduct for the HS2 high-speed rail link. The viaduct requires 292 piles and will carry HS2 across lakes and watercourses in the Colne Valley Regional Park. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-10th-november-2023-construction-works-are-pictured-in-harefield-lake-no-2-for-the-colne-valley-viaduct-for-the-hs2-high-speed-rail-link-the-viaduct-requires-292-piles-and-will-carry-hs2-across-lakes-and-watercourses-in-the-colne-valley-regional-park-credit-mark-kerrisonalamy-live-news-image572305571.html
RM2T72NGK–Harefield, UK. 10th November, 2023. Construction works are pictured in Harefield Lake No. 2 for the Colne Valley viaduct for the HS2 high-speed rail link. The viaduct requires 292 piles and will carry HS2 across lakes and watercourses in the Colne Valley Regional Park. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 16th February, 2022. Preparatory works in Savay Lake in the Colne Valley for the HS2 high-speed rail link. The HS2 route will cross waterways and lakes in the Colne Valley Regional Park by means of the Colne Valley Viaduct which will become the UK's longest railway bridge. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-16th-february-2022-preparatory-works-in-savay-lake-in-the-colne-valley-for-the-hs2-high-speed-rail-link-the-hs2-route-will-cross-waterways-and-lakes-in-the-colne-valley-regional-park-by-means-of-the-colne-valley-viaduct-which-will-become-the-uks-longest-railway-bridge-credit-mark-kerrisonalamy-live-news-image460883388.html
RM2HNR1D0–Harefield, UK. 16th February, 2022. Preparatory works in Savay Lake in the Colne Valley for the HS2 high-speed rail link. The HS2 route will cross waterways and lakes in the Colne Valley Regional Park by means of the Colne Valley Viaduct which will become the UK's longest railway bridge. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 3rd August, 2023. Construction of the HS2 High Speed Rail Colne Valley Viaduct piers across the lake formerly occupied by the Hillingdon Outdoor Activities Centre (HOAC). The popular and much loved HOAC has had to close down due to HS2 works. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, calling the project as it stands “unachievable”. HS2 CEO Mark Thurston resigned two weeks ago. Credit: Maureen McLean/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-3rd-august-2023-construction-of-the-hs2-high-speed-rail-colne-valley-viaduct-piers-across-the-lake-formerly-occupied-by-the-hillingdon-outdoor-activities-centre-hoac-the-popular-and-much-loved-hoac-has-had-to-close-down-due-to-hs2-works-the-infrastructure-and-projects-authority-has-placed-the-hs2-multi-billion-pound-project-between-london-and-birmingham-on-the-danger-list-calling-the-project-as-it-stands-unachievable-hs2-ceo-mark-thurston-resigned-two-weeks-ago-credit-maureen-mcleanalamy-live-news-image560317298.html
RM2RFGJC2–Harefield, UK. 3rd August, 2023. Construction of the HS2 High Speed Rail Colne Valley Viaduct piers across the lake formerly occupied by the Hillingdon Outdoor Activities Centre (HOAC). The popular and much loved HOAC has had to close down due to HS2 works. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, calling the project as it stands “unachievable”. HS2 CEO Mark Thurston resigned two weeks ago. Credit: Maureen McLean/Alamy Live News
Harefield, UK. 16th February, 2022. Preparatory works in Savay Lake in the Colne Valley for the HS2 high-speed rail link. The HS2 route will cross waterways and lakes in the Colne Valley Regional Park by means of the Colne Valley Viaduct which will become the UK's longest railway bridge. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-16th-february-2022-preparatory-works-in-savay-lake-in-the-colne-valley-for-the-hs2-high-speed-rail-link-the-hs2-route-will-cross-waterways-and-lakes-in-the-colne-valley-regional-park-by-means-of-the-colne-valley-viaduct-which-will-become-the-uks-longest-railway-bridge-credit-mark-kerrisonalamy-live-news-image460883396.html
RM2HNR1D8–Harefield, UK. 16th February, 2022. Preparatory works in Savay Lake in the Colne Valley for the HS2 high-speed rail link. The HS2 route will cross waterways and lakes in the Colne Valley Regional Park by means of the Colne Valley Viaduct which will become the UK's longest railway bridge. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 3rd August, 2023. Construction of the HS2 High Speed Rail Colne Valley Viaduct piers across the lake formerly occupied by the Hillingdon Outdoor Activities Centre (HOAC). The popular and much loved HOAC has had to close down due to HS2 works. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, calling the project as it stands “unachievable”. HS2 CEO Mark Thurston resigned two weeks ago. Credit: Maureen McLean/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-3rd-august-2023-construction-of-the-hs2-high-speed-rail-colne-valley-viaduct-piers-across-the-lake-formerly-occupied-by-the-hillingdon-outdoor-activities-centre-hoac-the-popular-and-much-loved-hoac-has-had-to-close-down-due-to-hs2-works-the-infrastructure-and-projects-authority-has-placed-the-hs2-multi-billion-pound-project-between-london-and-birmingham-on-the-danger-list-calling-the-project-as-it-stands-unachievable-hs2-ceo-mark-thurston-resigned-two-weeks-ago-credit-maureen-mcleanalamy-live-news-image560317290.html
RM2RFGJBP–Harefield, UK. 3rd August, 2023. Construction of the HS2 High Speed Rail Colne Valley Viaduct piers across the lake formerly occupied by the Hillingdon Outdoor Activities Centre (HOAC). The popular and much loved HOAC has had to close down due to HS2 works. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, calling the project as it stands “unachievable”. HS2 CEO Mark Thurston resigned two weeks ago. Credit: Maureen McLean/Alamy Live News
Harefield, UK. 16th February, 2022. Preparatory works in Savay Lake in the Colne Valley for the HS2 high-speed rail link. The HS2 route will cross waterways and lakes in the Colne Valley Regional Park by means of the Colne Valley Viaduct which will become the UK's longest railway bridge. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-16th-february-2022-preparatory-works-in-savay-lake-in-the-colne-valley-for-the-hs2-high-speed-rail-link-the-hs2-route-will-cross-waterways-and-lakes-in-the-colne-valley-regional-park-by-means-of-the-colne-valley-viaduct-which-will-become-the-uks-longest-railway-bridge-credit-mark-kerrisonalamy-live-news-image460883387.html
RM2HNR1CY–Harefield, UK. 16th February, 2022. Preparatory works in Savay Lake in the Colne Valley for the HS2 high-speed rail link. The HS2 route will cross waterways and lakes in the Colne Valley Regional Park by means of the Colne Valley Viaduct which will become the UK's longest railway bridge. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 3rd August, 2023. Construction of the HS2 High Speed Rail Colne Valley Viaduct piers across the lake formerly occupied by the Hillingdon Outdoor Activities Centre (HOAC). The popular and much loved HOAC has had to close down due to HS2 works. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, calling the project as it stands “unachievable”. HS2 CEO Mark Thurston resigned two weeks ago. Credit: Maureen McLean/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-3rd-august-2023-construction-of-the-hs2-high-speed-rail-colne-valley-viaduct-piers-across-the-lake-formerly-occupied-by-the-hillingdon-outdoor-activities-centre-hoac-the-popular-and-much-loved-hoac-has-had-to-close-down-due-to-hs2-works-the-infrastructure-and-projects-authority-has-placed-the-hs2-multi-billion-pound-project-between-london-and-birmingham-on-the-danger-list-calling-the-project-as-it-stands-unachievable-hs2-ceo-mark-thurston-resigned-two-weeks-ago-credit-maureen-mcleanalamy-live-news-image560317484.html
RM2RFGJJM–Harefield, UK. 3rd August, 2023. Construction of the HS2 High Speed Rail Colne Valley Viaduct piers across the lake formerly occupied by the Hillingdon Outdoor Activities Centre (HOAC). The popular and much loved HOAC has had to close down due to HS2 works. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, calling the project as it stands “unachievable”. HS2 CEO Mark Thurston resigned two weeks ago. Credit: Maureen McLean/Alamy Live News
Harefield, UK. 16th February, 2022. Preparatory works in Savay Lake in the Colne Valley for the HS2 high-speed rail link. The HS2 route will cross waterways and lakes in the Colne Valley Regional Park by means of the Colne Valley Viaduct which will become the UK's longest railway bridge. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-16th-february-2022-preparatory-works-in-savay-lake-in-the-colne-valley-for-the-hs2-high-speed-rail-link-the-hs2-route-will-cross-waterways-and-lakes-in-the-colne-valley-regional-park-by-means-of-the-colne-valley-viaduct-which-will-become-the-uks-longest-railway-bridge-credit-mark-kerrisonalamy-live-news-image460883392.html
RM2HNR1D4–Harefield, UK. 16th February, 2022. Preparatory works in Savay Lake in the Colne Valley for the HS2 high-speed rail link. The HS2 route will cross waterways and lakes in the Colne Valley Regional Park by means of the Colne Valley Viaduct which will become the UK's longest railway bridge. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 3rd August, 2023. Construction of the HS2 High Speed Rail Colne Valley Viaduct piers across the lake formerly occupied by the Hillingdon Outdoor Activities Centre (HOAC). The popular and much loved HOAC has had to close down due to HS2 works. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, calling the project as it stands “unachievable”. HS2 CEO Mark Thurston resigned two weeks ago. Credit: Maureen McLean/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-3rd-august-2023-construction-of-the-hs2-high-speed-rail-colne-valley-viaduct-piers-across-the-lake-formerly-occupied-by-the-hillingdon-outdoor-activities-centre-hoac-the-popular-and-much-loved-hoac-has-had-to-close-down-due-to-hs2-works-the-infrastructure-and-projects-authority-has-placed-the-hs2-multi-billion-pound-project-between-london-and-birmingham-on-the-danger-list-calling-the-project-as-it-stands-unachievable-hs2-ceo-mark-thurston-resigned-two-weeks-ago-credit-maureen-mcleanalamy-live-news-image560317303.html
RM2RFGJC7–Harefield, UK. 3rd August, 2023. Construction of the HS2 High Speed Rail Colne Valley Viaduct piers across the lake formerly occupied by the Hillingdon Outdoor Activities Centre (HOAC). The popular and much loved HOAC has had to close down due to HS2 works. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, calling the project as it stands “unachievable”. HS2 CEO Mark Thurston resigned two weeks ago. Credit: Maureen McLean/Alamy Live News
London, UK. 16th April, 2024. A 700-tonne launching girder is used above Harefield Lake No. 2 in the construction of the Colne Valley viaduct for the HS2 high-speed rail link. The viaduct will carry HS2 across lakes and watercourses in the Colne Valley Regional Park. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/london-uk-16th-april-2024-a-700-tonne-launching-girder-is-used-above-harefield-lake-no-2-in-the-construction-of-the-colne-valley-viaduct-for-the-hs2-high-speed-rail-link-the-viaduct-will-carry-hs2-across-lakes-and-watercourses-in-the-colne-valley-regional-park-credit-mark-kerrisonalamy-live-news-image603569915.html
RM2X1XYGB–London, UK. 16th April, 2024. A 700-tonne launching girder is used above Harefield Lake No. 2 in the construction of the Colne Valley viaduct for the HS2 high-speed rail link. The viaduct will carry HS2 across lakes and watercourses in the Colne Valley Regional Park. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 3rd August, 2023. Construction of the HS2 High Speed Rail Colne Valley Viaduct piers across the lake formerly occupied by the Hillingdon Outdoor Activities Centre (HOAC). The popular and much loved HOAC has had to close down due to HS2 works. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, calling the project as it stands “unachievable”. HS2 CEO Mark Thurston resigned two weeks ago. Credit: Maureen McLean/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-3rd-august-2023-construction-of-the-hs2-high-speed-rail-colne-valley-viaduct-piers-across-the-lake-formerly-occupied-by-the-hillingdon-outdoor-activities-centre-hoac-the-popular-and-much-loved-hoac-has-had-to-close-down-due-to-hs2-works-the-infrastructure-and-projects-authority-has-placed-the-hs2-multi-billion-pound-project-between-london-and-birmingham-on-the-danger-list-calling-the-project-as-it-stands-unachievable-hs2-ceo-mark-thurston-resigned-two-weeks-ago-credit-maureen-mcleanalamy-live-news-image560317396.html
RM2RFGJFG–Harefield, UK. 3rd August, 2023. Construction of the HS2 High Speed Rail Colne Valley Viaduct piers across the lake formerly occupied by the Hillingdon Outdoor Activities Centre (HOAC). The popular and much loved HOAC has had to close down due to HS2 works. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, calling the project as it stands “unachievable”. HS2 CEO Mark Thurston resigned two weeks ago. Credit: Maureen McLean/Alamy Live News
London, UK. 16th April, 2024. A 700-tonne launching girder is used above Harefield Lake No. 2 in the construction of the Colne Valley viaduct for the HS2 high-speed rail link. The viaduct will carry HS2 across lakes and watercourses in the Colne Valley Regional Park. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/london-uk-16th-april-2024-a-700-tonne-launching-girder-is-used-above-harefield-lake-no-2-in-the-construction-of-the-colne-valley-viaduct-for-the-hs2-high-speed-rail-link-the-viaduct-will-carry-hs2-across-lakes-and-watercourses-in-the-colne-valley-regional-park-credit-mark-kerrisonalamy-live-news-image603569925.html
RM2X1XYGN–London, UK. 16th April, 2024. A 700-tonne launching girder is used above Harefield Lake No. 2 in the construction of the Colne Valley viaduct for the HS2 high-speed rail link. The viaduct will carry HS2 across lakes and watercourses in the Colne Valley Regional Park. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 3rd August, 2023. Construction of the HS2 High Speed Rail Colne Valley Viaduct piers across the lake formerly occupied by the Hillingdon Outdoor Activities Centre (HOAC). The popular and much loved HOAC has had to close down due to HS2 works. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, calling the project as it stands “unachievable”. HS2 CEO Mark Thurston resigned two weeks ago. Credit: Maureen McLean/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-3rd-august-2023-construction-of-the-hs2-high-speed-rail-colne-valley-viaduct-piers-across-the-lake-formerly-occupied-by-the-hillingdon-outdoor-activities-centre-hoac-the-popular-and-much-loved-hoac-has-had-to-close-down-due-to-hs2-works-the-infrastructure-and-projects-authority-has-placed-the-hs2-multi-billion-pound-project-between-london-and-birmingham-on-the-danger-list-calling-the-project-as-it-stands-unachievable-hs2-ceo-mark-thurston-resigned-two-weeks-ago-credit-maureen-mcleanalamy-live-news-image560317401.html
RM2RFGJFN–Harefield, UK. 3rd August, 2023. Construction of the HS2 High Speed Rail Colne Valley Viaduct piers across the lake formerly occupied by the Hillingdon Outdoor Activities Centre (HOAC). The popular and much loved HOAC has had to close down due to HS2 works. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, calling the project as it stands “unachievable”. HS2 CEO Mark Thurston resigned two weeks ago. Credit: Maureen McLean/Alamy Live News
London, UK. 16th April, 2024. A 700-tonne launching girder is used above Harefield Lake No. 2 in the construction of the Colne Valley viaduct for the HS2 high-speed rail link. The viaduct will carry HS2 across lakes and watercourses in the Colne Valley Regional Park. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/london-uk-16th-april-2024-a-700-tonne-launching-girder-is-used-above-harefield-lake-no-2-in-the-construction-of-the-colne-valley-viaduct-for-the-hs2-high-speed-rail-link-the-viaduct-will-carry-hs2-across-lakes-and-watercourses-in-the-colne-valley-regional-park-credit-mark-kerrisonalamy-live-news-image603569922.html
RM2X1XYGJ–London, UK. 16th April, 2024. A 700-tonne launching girder is used above Harefield Lake No. 2 in the construction of the Colne Valley viaduct for the HS2 high-speed rail link. The viaduct will carry HS2 across lakes and watercourses in the Colne Valley Regional Park. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 16th February, 2022. Preparatory works for the HS2 high-speed rail link are pictured in Savay Lake in the Colne Valley. The HS2 route will cross waterways and lakes in the Colne Valley Regional Park by means of the Colne Valley Viaduct which will become the UK's longest railway bridge. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-16th-february-2022-preparatory-works-for-the-hs2-high-speed-rail-link-are-pictured-in-savay-lake-in-the-colne-valley-the-hs2-route-will-cross-waterways-and-lakes-in-the-colne-valley-regional-park-by-means-of-the-colne-valley-viaduct-which-will-become-the-uks-longest-railway-bridge-credit-mark-kerrisonalamy-live-news-image463162371.html
RM2HWET97–Harefield, UK. 16th February, 2022. Preparatory works for the HS2 high-speed rail link are pictured in Savay Lake in the Colne Valley. The HS2 route will cross waterways and lakes in the Colne Valley Regional Park by means of the Colne Valley Viaduct which will become the UK's longest railway bridge. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 21st September, 2020. A man in a small river cruiser navigates the Grand Union Canal in front of trees being felled alongside HOAC lake in connection with the HS2 high-speed rail link. Thousands of trees have already been felled in the Colne Valley for the controversial £106bn rail link. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-21st-september-2020-a-man-in-a-small-river-cruiser-navigates-the-grand-union-canal-in-front-of-trees-being-felled-alongside-hoac-lake-in-connection-with-the-hs2-high-speed-rail-link-thousands-of-trees-have-already-been-felled-in-the-colne-valley-for-the-controversial-106bn-rail-link-credit-mark-kerrisonalamy-live-news-image376398412.html
RM2CTAC0C–Harefield, UK. 21st September, 2020. A man in a small river cruiser navigates the Grand Union Canal in front of trees being felled alongside HOAC lake in connection with the HS2 high-speed rail link. Thousands of trees have already been felled in the Colne Valley for the controversial £106bn rail link. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 27th February, 2022. Construction works for the HS2 Colne Valley Viaduct, which will become the UK's longest railway bridge, are pictured at HOAC Lake (Harefield Lake No. 2). A viaduct requiring 292 piles is currently being constructed to carry HS2 across lakes and watercourses in the Colne Valley Regional Park. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-27th-february-2022-construction-works-for-the-hs2-colne-valley-viaduct-which-will-become-the-uks-longest-railway-bridge-are-pictured-at-hoac-lake-harefield-lake-no-2-a-viaduct-requiring-292-piles-is-currently-being-constructed-to-carry-hs2-across-lakes-and-watercourses-in-the-colne-valley-regional-park-credit-mark-kerrisonalamy-live-news-image465092803.html
RM2J0JPH7–Harefield, UK. 27th February, 2022. Construction works for the HS2 Colne Valley Viaduct, which will become the UK's longest railway bridge, are pictured at HOAC Lake (Harefield Lake No. 2). A viaduct requiring 292 piles is currently being constructed to carry HS2 across lakes and watercourses in the Colne Valley Regional Park. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 3rd August, 2023. Construction of the HS2 High Speed Rail Colne Valley Viaduct piers across the lake formerly occupied by the Hillingdon Outdoor Activities Centre (HOAC). The popular and much loved HOAC has had to close down due to HS2 works. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, calling the project as it stands “unachievable”. HS2 CEO Mark Thurston resigned two weeks ago. Credit: Maureen McLean/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-3rd-august-2023-construction-of-the-hs2-high-speed-rail-colne-valley-viaduct-piers-across-the-lake-formerly-occupied-by-the-hillingdon-outdoor-activities-centre-hoac-the-popular-and-much-loved-hoac-has-had-to-close-down-due-to-hs2-works-the-infrastructure-and-projects-authority-has-placed-the-hs2-multi-billion-pound-project-between-london-and-birmingham-on-the-danger-list-calling-the-project-as-it-stands-unachievable-hs2-ceo-mark-thurston-resigned-two-weeks-ago-credit-maureen-mcleanalamy-live-news-image560317439.html
RM2RFGJH3–Harefield, UK. 3rd August, 2023. Construction of the HS2 High Speed Rail Colne Valley Viaduct piers across the lake formerly occupied by the Hillingdon Outdoor Activities Centre (HOAC). The popular and much loved HOAC has had to close down due to HS2 works. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, calling the project as it stands “unachievable”. HS2 CEO Mark Thurston resigned two weeks ago. Credit: Maureen McLean/Alamy Live News
Harefield, UK. 27th February, 2022. Construction works for the HS2 Colne Valley Viaduct, which will become the UK's longest railway bridge, are pictured at HOAC Lake (Harefield Lake No. 2). A viaduct requiring 292 piles is currently being constructed to carry HS2 across lakes and watercourses in the Colne Valley Regional Park. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-27th-february-2022-construction-works-for-the-hs2-colne-valley-viaduct-which-will-become-the-uks-longest-railway-bridge-are-pictured-at-hoac-lake-harefield-lake-no-2-a-viaduct-requiring-292-piles-is-currently-being-constructed-to-carry-hs2-across-lakes-and-watercourses-in-the-colne-valley-regional-park-credit-mark-kerrisonalamy-live-news-image465092792.html
RM2J0JPGT–Harefield, UK. 27th February, 2022. Construction works for the HS2 Colne Valley Viaduct, which will become the UK's longest railway bridge, are pictured at HOAC Lake (Harefield Lake No. 2). A viaduct requiring 292 piles is currently being constructed to carry HS2 across lakes and watercourses in the Colne Valley Regional Park. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 3rd August, 2023. HS2 were jet washing a white substance, possibly concrete today and overspray was going into the lake (right) possibly contaminating the water. Construction of the HS2 High Speed Rail Colne Valley Viaduct piers across the lake formerly occupied by the Hillingdon Outdoor Activities Centre (HOAC). The popular and much loved HOAC has had to close down due to HS2 works. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, calling the project as it stands “unachievable”. HS2 CEO M Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-3rd-august-2023-hs2-were-jet-washing-a-white-substance-possibly-concrete-today-and-overspray-was-going-into-the-lake-right-possibly-contaminating-the-water-construction-of-the-hs2-high-speed-rail-colne-valley-viaduct-piers-across-the-lake-formerly-occupied-by-the-hillingdon-outdoor-activities-centre-hoac-the-popular-and-much-loved-hoac-has-had-to-close-down-due-to-hs2-works-the-infrastructure-and-projects-authority-has-placed-the-hs2-multi-billion-pound-project-between-london-and-birmingham-on-the-danger-list-calling-the-project-as-it-stands-unachievable-hs2-ceo-m-image560317469.html
RM2RFGJJ5–Harefield, UK. 3rd August, 2023. HS2 were jet washing a white substance, possibly concrete today and overspray was going into the lake (right) possibly contaminating the water. Construction of the HS2 High Speed Rail Colne Valley Viaduct piers across the lake formerly occupied by the Hillingdon Outdoor Activities Centre (HOAC). The popular and much loved HOAC has had to close down due to HS2 works. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, calling the project as it stands “unachievable”. HS2 CEO M
Harefield, UK. 27th February, 2022. Construction works for the HS2 Colne Valley Viaduct, which will become the UK's longest railway bridge, are pictured at HOAC Lake (Harefield Lake No. 2). A viaduct requiring 292 piles is currently being constructed to carry HS2 across lakes and watercourses in the Colne Valley Regional Park. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-27th-february-2022-construction-works-for-the-hs2-colne-valley-viaduct-which-will-become-the-uks-longest-railway-bridge-are-pictured-at-hoac-lake-harefield-lake-no-2-a-viaduct-requiring-292-piles-is-currently-being-constructed-to-carry-hs2-across-lakes-and-watercourses-in-the-colne-valley-regional-park-credit-mark-kerrisonalamy-live-news-image465092802.html
RM2J0JPH6–Harefield, UK. 27th February, 2022. Construction works for the HS2 Colne Valley Viaduct, which will become the UK's longest railway bridge, are pictured at HOAC Lake (Harefield Lake No. 2). A viaduct requiring 292 piles is currently being constructed to carry HS2 across lakes and watercourses in the Colne Valley Regional Park. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 5th February, 2022. Construction works for the HS2 Colne Valley Viaduct, which will become the UK's longest railway bridge, are pictured at HOAC Lake (Harefield Lake No. 2). A viaduct requiring 292 piles is currently being constructed to carry HS2 across lakes and watercourses in the Colne Valley Regional Park. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-5th-february-2022-construction-works-for-the-hs2-colne-valley-viaduct-which-will-become-the-uks-longest-railway-bridge-are-pictured-at-hoac-lake-harefield-lake-no-2-a-viaduct-requiring-292-piles-is-currently-being-constructed-to-carry-hs2-across-lakes-and-watercourses-in-the-colne-valley-regional-park-credit-mark-kerrisonalamy-live-news-image459945311.html
RM2HM88X7–Harefield, UK. 5th February, 2022. Construction works for the HS2 Colne Valley Viaduct, which will become the UK's longest railway bridge, are pictured at HOAC Lake (Harefield Lake No. 2). A viaduct requiring 292 piles is currently being constructed to carry HS2 across lakes and watercourses in the Colne Valley Regional Park. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 3rd August, 2023. HS2 were jet washing a white substance, possibly concrete today and overspray was going into the lake (right) possibly contaminating the water. Construction of the HS2 High Speed Rail Colne Valley Viaduct piers across the lake formerly occupied by the Hillingdon Outdoor Activities Centre (HOAC). The popular and much loved HOAC has had to close down due to HS2 works. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, calling the project as it stands “unachievable”. HS2 CEO M Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-3rd-august-2023-hs2-were-jet-washing-a-white-substance-possibly-concrete-today-and-overspray-was-going-into-the-lake-right-possibly-contaminating-the-water-construction-of-the-hs2-high-speed-rail-colne-valley-viaduct-piers-across-the-lake-formerly-occupied-by-the-hillingdon-outdoor-activities-centre-hoac-the-popular-and-much-loved-hoac-has-had-to-close-down-due-to-hs2-works-the-infrastructure-and-projects-authority-has-placed-the-hs2-multi-billion-pound-project-between-london-and-birmingham-on-the-danger-list-calling-the-project-as-it-stands-unachievable-hs2-ceo-m-image560317458.html
RM2RFGJHP–Harefield, UK. 3rd August, 2023. HS2 were jet washing a white substance, possibly concrete today and overspray was going into the lake (right) possibly contaminating the water. Construction of the HS2 High Speed Rail Colne Valley Viaduct piers across the lake formerly occupied by the Hillingdon Outdoor Activities Centre (HOAC). The popular and much loved HOAC has had to close down due to HS2 works. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, calling the project as it stands “unachievable”. HS2 CEO M
Harefield, UK. 5th February, 2022. A cormorant takes off from HOAC Lake (Harefield Lake No. 2) in front of works for the HS2 Colne Valley Viaduct. The viaduct, which will become the UK's longest railway bridge, requires 292 piles to carry HS2 across lakes and watercourses in the Colne Valley Regional Park. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-5th-february-2022-a-cormorant-takes-off-from-hoac-lake-harefield-lake-no-2-in-front-of-works-for-the-hs2-colne-valley-viaduct-the-viaduct-which-will-become-the-uks-longest-railway-bridge-requires-292-piles-to-carry-hs2-across-lakes-and-watercourses-in-the-colne-valley-regional-park-credit-mark-kerrisonalamy-live-news-image459801257.html
RM2HM1N5D–Harefield, UK. 5th February, 2022. A cormorant takes off from HOAC Lake (Harefield Lake No. 2) in front of works for the HS2 Colne Valley Viaduct. The viaduct, which will become the UK's longest railway bridge, requires 292 piles to carry HS2 across lakes and watercourses in the Colne Valley Regional Park. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 16th February, 2022. Preparatory works for the HS2 high-speed rail link at Broadwater Lake, a large lake in the Colne Valley which supports huge numbers of waterbirds. The HS2 route will cross waterways and lakes in the Colne Valley Regional Park by means of the Colne Valley Viaduct which will become the UK's longest railway bridge. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-16th-february-2022-preparatory-works-for-the-hs2-high-speed-rail-link-at-broadwater-lake-a-large-lake-in-the-colne-valley-which-supports-huge-numbers-of-waterbirds-the-hs2-route-will-cross-waterways-and-lakes-in-the-colne-valley-regional-park-by-means-of-the-colne-valley-viaduct-which-will-become-the-uks-longest-railway-bridge-credit-mark-kerrisonalamy-live-news-image460883384.html
RM2HNR1CT–Harefield, UK. 16th February, 2022. Preparatory works for the HS2 high-speed rail link at Broadwater Lake, a large lake in the Colne Valley which supports huge numbers of waterbirds. The HS2 route will cross waterways and lakes in the Colne Valley Regional Park by means of the Colne Valley Viaduct which will become the UK's longest railway bridge. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 3rd August, 2023. HS2 were jet washing a white substance, possibly concrete today and overspray was going into the lake (right) possibly contaminating the water. Construction of the HS2 High Speed Rail Colne Valley Viaduct piers across the lake formerly occupied by the Hillingdon Outdoor Activities Centre (HOAC). The popular and much loved HOAC has had to close down due to HS2 works. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, calling the project as it stands “unachievable”. HS2 CEO M Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-3rd-august-2023-hs2-were-jet-washing-a-white-substance-possibly-concrete-today-and-overspray-was-going-into-the-lake-right-possibly-contaminating-the-water-construction-of-the-hs2-high-speed-rail-colne-valley-viaduct-piers-across-the-lake-formerly-occupied-by-the-hillingdon-outdoor-activities-centre-hoac-the-popular-and-much-loved-hoac-has-had-to-close-down-due-to-hs2-works-the-infrastructure-and-projects-authority-has-placed-the-hs2-multi-billion-pound-project-between-london-and-birmingham-on-the-danger-list-calling-the-project-as-it-stands-unachievable-hs2-ceo-m-image560317448.html
RM2RFGJHC–Harefield, UK. 3rd August, 2023. HS2 were jet washing a white substance, possibly concrete today and overspray was going into the lake (right) possibly contaminating the water. Construction of the HS2 High Speed Rail Colne Valley Viaduct piers across the lake formerly occupied by the Hillingdon Outdoor Activities Centre (HOAC). The popular and much loved HOAC has had to close down due to HS2 works. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, calling the project as it stands “unachievable”. HS2 CEO M
Harefield, UK. 16th February, 2022. Preparatory works for the HS2 high-speed rail link are pictured at Broadwater Lake, a large lake in the Colne Valley which supports large numbers of waterbirds. The HS2 route will cross waterways and lakes in the Colne Valley Regional Park by means of the Colne Valley Viaduct which will become the UK's longest railway bridge. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-16th-february-2022-preparatory-works-for-the-hs2-high-speed-rail-link-are-pictured-at-broadwater-lake-a-large-lake-in-the-colne-valley-which-supports-large-numbers-of-waterbirds-the-hs2-route-will-cross-waterways-and-lakes-in-the-colne-valley-regional-park-by-means-of-the-colne-valley-viaduct-which-will-become-the-uks-longest-railway-bridge-credit-mark-kerrisonalamy-live-news-image463162337.html
RM2HWET81–Harefield, UK. 16th February, 2022. Preparatory works for the HS2 high-speed rail link are pictured at Broadwater Lake, a large lake in the Colne Valley which supports large numbers of waterbirds. The HS2 route will cross waterways and lakes in the Colne Valley Regional Park by means of the Colne Valley Viaduct which will become the UK's longest railway bridge. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 14th February, 2023. A general view of works in Harefield Lake No. 2 for the HS2 high-speed rail link. The Colne Valley Viaduct requires 292 piles and will carry HS2 across lakes and watercourses in the Colne Valley Regional Park. The first phase of HS2 between London and Birmingham is due to open between 2029 and 2033. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-14th-february-2023-a-general-view-of-works-in-harefield-lake-no-2-for-the-hs2-high-speed-rail-link-the-colne-valley-viaduct-requires-292-piles-and-will-carry-hs2-across-lakes-and-watercourses-in-the-colne-valley-regional-park-the-first-phase-of-hs2-between-london-and-birmingham-is-due-to-open-between-2029-and-2033-credit-mark-kerrisonalamy-live-news-image525422780.html
RM2NER238–Harefield, UK. 14th February, 2023. A general view of works in Harefield Lake No. 2 for the HS2 high-speed rail link. The Colne Valley Viaduct requires 292 piles and will carry HS2 across lakes and watercourses in the Colne Valley Regional Park. The first phase of HS2 between London and Birmingham is due to open between 2029 and 2033. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 5th February, 2022. Construction works for the HS2 Colne Valley Viaduct, which will become the UK's longest railway bridge, are pictured at HOAC Lake (Harefield Lake No. 2). A viaduct requiring 292 piles driven into the aquifer, a natural water filtration system, is currently being constructed to carry HS2 across lakes and watercourses in the Colne Valley Regional Park. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-5th-february-2022-construction-works-for-the-hs2-colne-valley-viaduct-which-will-become-the-uks-longest-railway-bridge-are-pictured-at-hoac-lake-harefield-lake-no-2-a-viaduct-requiring-292-piles-driven-into-the-aquifer-a-natural-water-filtration-system-is-currently-being-constructed-to-carry-hs2-across-lakes-and-watercourses-in-the-colne-valley-regional-park-credit-mark-kerrisonalamy-live-news-image459801291.html
RM2HM1N6K–Harefield, UK. 5th February, 2022. Construction works for the HS2 Colne Valley Viaduct, which will become the UK's longest railway bridge, are pictured at HOAC Lake (Harefield Lake No. 2). A viaduct requiring 292 piles driven into the aquifer, a natural water filtration system, is currently being constructed to carry HS2 across lakes and watercourses in the Colne Valley Regional Park. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 3rd August, 2023. HS2 were jet washing a white substance, possibly concrete today and overspray was going into the lake (right) possibly contaminating the water. Construction of the HS2 High Speed Rail Colne Valley Viaduct piers across the lake formerly occupied by the Hillingdon Outdoor Activities Centre (HOAC). The popular and much loved HOAC has had to close down due to HS2 works. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, calling the project as it stands “unachievable”. HS2 CEO M Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-3rd-august-2023-hs2-were-jet-washing-a-white-substance-possibly-concrete-today-and-overspray-was-going-into-the-lake-right-possibly-contaminating-the-water-construction-of-the-hs2-high-speed-rail-colne-valley-viaduct-piers-across-the-lake-formerly-occupied-by-the-hillingdon-outdoor-activities-centre-hoac-the-popular-and-much-loved-hoac-has-had-to-close-down-due-to-hs2-works-the-infrastructure-and-projects-authority-has-placed-the-hs2-multi-billion-pound-project-between-london-and-birmingham-on-the-danger-list-calling-the-project-as-it-stands-unachievable-hs2-ceo-m-image560317411.html
RM2RFGJG3–Harefield, UK. 3rd August, 2023. HS2 were jet washing a white substance, possibly concrete today and overspray was going into the lake (right) possibly contaminating the water. Construction of the HS2 High Speed Rail Colne Valley Viaduct piers across the lake formerly occupied by the Hillingdon Outdoor Activities Centre (HOAC). The popular and much loved HOAC has had to close down due to HS2 works. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, calling the project as it stands “unachievable”. HS2 CEO M
Harefield, UK. 5th February, 2022. Construction works for the HS2 Colne Valley Viaduct, which will become the UK's longest railway bridge, are pictured at HOAC Lake (Harefield Lake No. 2). A viaduct requiring 292 piles driven into the aquifer, a natural water filtration system, is currently being constructed to carry HS2 across lakes and watercourses in the Colne Valley Regional Park. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-5th-february-2022-construction-works-for-the-hs2-colne-valley-viaduct-which-will-become-the-uks-longest-railway-bridge-are-pictured-at-hoac-lake-harefield-lake-no-2-a-viaduct-requiring-292-piles-driven-into-the-aquifer-a-natural-water-filtration-system-is-currently-being-constructed-to-carry-hs2-across-lakes-and-watercourses-in-the-colne-valley-regional-park-credit-mark-kerrisonalamy-live-news-image459801349.html
RM2HM1N8N–Harefield, UK. 5th February, 2022. Construction works for the HS2 Colne Valley Viaduct, which will become the UK's longest railway bridge, are pictured at HOAC Lake (Harefield Lake No. 2). A viaduct requiring 292 piles driven into the aquifer, a natural water filtration system, is currently being constructed to carry HS2 across lakes and watercourses in the Colne Valley Regional Park. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 3rd August, 2023. HS2 jet washing a white substance, possibly concrete. Construction of the HS2 High Speed Rail Colne Valley Viaduct piers across the lake formerly occupied by the Hillingdon Outdoor Activities Centre (HOAC). The popular and much loved HOAC has had to close down due to HS2 works. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, calling the project as it stands “unachievable”. HS2 CEO Mark Thurston resigned two weeks ago. Credit: Maureen McLean/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-3rd-august-2023-hs2-jet-washing-a-white-substance-possibly-concrete-construction-of-the-hs2-high-speed-rail-colne-valley-viaduct-piers-across-the-lake-formerly-occupied-by-the-hillingdon-outdoor-activities-centre-hoac-the-popular-and-much-loved-hoac-has-had-to-close-down-due-to-hs2-works-the-infrastructure-and-projects-authority-has-placed-the-hs2-multi-billion-pound-project-between-london-and-birmingham-on-the-danger-list-calling-the-project-as-it-stands-unachievable-hs2-ceo-mark-thurston-resigned-two-weeks-ago-credit-maureen-mcleanalamy-live-news-image560317357.html
RM2RFGJE5–Harefield, UK. 3rd August, 2023. HS2 jet washing a white substance, possibly concrete. Construction of the HS2 High Speed Rail Colne Valley Viaduct piers across the lake formerly occupied by the Hillingdon Outdoor Activities Centre (HOAC). The popular and much loved HOAC has had to close down due to HS2 works. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, calling the project as it stands “unachievable”. HS2 CEO Mark Thurston resigned two weeks ago. Credit: Maureen McLean/Alamy Live News
Harefield, UK. 5th February, 2022. Construction works for the HS2 Colne Valley Viaduct, which will become the UK's longest railway bridge, are pictured at HOAC Lake (Harefield Lake No. 2). A viaduct requiring 292 piles driven into the aquifer, a natural water filtration system, is currently being constructed to carry HS2 across lakes and watercourses in the Colne Valley Regional Park. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-5th-february-2022-construction-works-for-the-hs2-colne-valley-viaduct-which-will-become-the-uks-longest-railway-bridge-are-pictured-at-hoac-lake-harefield-lake-no-2-a-viaduct-requiring-292-piles-driven-into-the-aquifer-a-natural-water-filtration-system-is-currently-being-constructed-to-carry-hs2-across-lakes-and-watercourses-in-the-colne-valley-regional-park-credit-mark-kerrisonalamy-live-news-image459801348.html
RM2HM1N8M–Harefield, UK. 5th February, 2022. Construction works for the HS2 Colne Valley Viaduct, which will become the UK's longest railway bridge, are pictured at HOAC Lake (Harefield Lake No. 2). A viaduct requiring 292 piles driven into the aquifer, a natural water filtration system, is currently being constructed to carry HS2 across lakes and watercourses in the Colne Valley Regional Park. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 3rd August, 2023. HS2 jet washing a white substance, possibly concrete. Construction of the HS2 High Speed Rail Colne Valley Viaduct piers across the lake formerly occupied by the Hillingdon Outdoor Activities Centre (HOAC). The popular and much loved HOAC has had to close down due to HS2 works. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, calling the project as it stands “unachievable”. HS2 CEO Mark Thurston resigned two weeks ago. Credit: Maureen McLean/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-3rd-august-2023-hs2-jet-washing-a-white-substance-possibly-concrete-construction-of-the-hs2-high-speed-rail-colne-valley-viaduct-piers-across-the-lake-formerly-occupied-by-the-hillingdon-outdoor-activities-centre-hoac-the-popular-and-much-loved-hoac-has-had-to-close-down-due-to-hs2-works-the-infrastructure-and-projects-authority-has-placed-the-hs2-multi-billion-pound-project-between-london-and-birmingham-on-the-danger-list-calling-the-project-as-it-stands-unachievable-hs2-ceo-mark-thurston-resigned-two-weeks-ago-credit-maureen-mcleanalamy-live-news-image560317352.html
RM2RFGJE0–Harefield, UK. 3rd August, 2023. HS2 jet washing a white substance, possibly concrete. Construction of the HS2 High Speed Rail Colne Valley Viaduct piers across the lake formerly occupied by the Hillingdon Outdoor Activities Centre (HOAC). The popular and much loved HOAC has had to close down due to HS2 works. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, calling the project as it stands “unachievable”. HS2 CEO Mark Thurston resigned two weeks ago. Credit: Maureen McLean/Alamy Live News
Harefield, UK. 5th February, 2022. A view of works for the HS2 Colne Valley Viaduct, which will become the UK's longest railway bridge, at HOAC Lake (Harefield Lake No. 2). A viaduct requiring 292 piles driven into the aquifer, a natural water filtration system, is currently being constructed to carry HS2 across lakes and watercourses in the Colne Valley Regional Park. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-5th-february-2022-a-view-of-works-for-the-hs2-colne-valley-viaduct-which-will-become-the-uks-longest-railway-bridge-at-hoac-lake-harefield-lake-no-2-a-viaduct-requiring-292-piles-driven-into-the-aquifer-a-natural-water-filtration-system-is-currently-being-constructed-to-carry-hs2-across-lakes-and-watercourses-in-the-colne-valley-regional-park-credit-mark-kerrisonalamy-live-news-image459801265.html
RM2HM1N5N–Harefield, UK. 5th February, 2022. A view of works for the HS2 Colne Valley Viaduct, which will become the UK's longest railway bridge, at HOAC Lake (Harefield Lake No. 2). A viaduct requiring 292 piles driven into the aquifer, a natural water filtration system, is currently being constructed to carry HS2 across lakes and watercourses in the Colne Valley Regional Park. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 3rd August, 2023. HS2 jet washing a white substance, possibly concrete. Construction of the HS2 High Speed Rail Colne Valley Viaduct piers across the lake formerly occupied by the Hillingdon Outdoor Activities Centre (HOAC). The popular and much loved HOAC has had to close down due to HS2 works. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, calling the project as it stands “unachievable”. HS2 CEO Mark Thurston resigned two weeks ago. Credit: Maureen McLean/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-3rd-august-2023-hs2-jet-washing-a-white-substance-possibly-concrete-construction-of-the-hs2-high-speed-rail-colne-valley-viaduct-piers-across-the-lake-formerly-occupied-by-the-hillingdon-outdoor-activities-centre-hoac-the-popular-and-much-loved-hoac-has-had-to-close-down-due-to-hs2-works-the-infrastructure-and-projects-authority-has-placed-the-hs2-multi-billion-pound-project-between-london-and-birmingham-on-the-danger-list-calling-the-project-as-it-stands-unachievable-hs2-ceo-mark-thurston-resigned-two-weeks-ago-credit-maureen-mcleanalamy-live-news-image560317211.html
RM2RFGJ8Y–Harefield, UK. 3rd August, 2023. HS2 jet washing a white substance, possibly concrete. Construction of the HS2 High Speed Rail Colne Valley Viaduct piers across the lake formerly occupied by the Hillingdon Outdoor Activities Centre (HOAC). The popular and much loved HOAC has had to close down due to HS2 works. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, calling the project as it stands “unachievable”. HS2 CEO Mark Thurston resigned two weeks ago. Credit: Maureen McLean/Alamy Live News
Harefield, UK. 5th February, 2022. A view of works for the HS2 Colne Valley Viaduct, which will become the UK's longest railway bridge, at HOAC Lake (Harefield Lake No. 2). A viaduct requiring 292 piles driven into the aquifer, a natural water filtration system, is currently being constructed to carry HS2 across lakes and watercourses in the Colne Valley Regional Park. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-5th-february-2022-a-view-of-works-for-the-hs2-colne-valley-viaduct-which-will-become-the-uks-longest-railway-bridge-at-hoac-lake-harefield-lake-no-2-a-viaduct-requiring-292-piles-driven-into-the-aquifer-a-natural-water-filtration-system-is-currently-being-constructed-to-carry-hs2-across-lakes-and-watercourses-in-the-colne-valley-regional-park-credit-mark-kerrisonalamy-live-news-image459801280.html
RM2HM1N68–Harefield, UK. 5th February, 2022. A view of works for the HS2 Colne Valley Viaduct, which will become the UK's longest railway bridge, at HOAC Lake (Harefield Lake No. 2). A viaduct requiring 292 piles driven into the aquifer, a natural water filtration system, is currently being constructed to carry HS2 across lakes and watercourses in the Colne Valley Regional Park. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 3rd August, 2023. Construction of the HS2 High Speed Rail Colne Valley Viaduct (CVV) piers across Savay Lake in Harefield for the new High Speed Railway from London to Birmingham is continuing. According to HS2 the CVV will stretch for more than 3.4km (2 miles) across a series of lakes and waterways between Hillingdon and the M25. It will be the longest railway bridge in the UK and almost a kilometre longer than the Forth Rail Bridge. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, callin Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-3rd-august-2023-construction-of-the-hs2-high-speed-rail-colne-valley-viaduct-cvv-piers-across-savay-lake-in-harefield-for-the-new-high-speed-railway-from-london-to-birmingham-is-continuing-according-to-hs2-the-cvv-will-stretch-for-more-than-34km-2-miles-across-a-series-of-lakes-and-waterways-between-hillingdon-and-the-m25-it-will-be-the-longest-railway-bridge-in-the-uk-and-almost-a-kilometre-longer-than-the-forth-rail-bridge-the-infrastructure-and-projects-authority-has-placed-the-hs2-multi-billion-pound-project-between-london-and-birmingham-on-the-danger-list-callin-image560324268.html
RM2RFGY90–Harefield, UK. 3rd August, 2023. Construction of the HS2 High Speed Rail Colne Valley Viaduct (CVV) piers across Savay Lake in Harefield for the new High Speed Railway from London to Birmingham is continuing. According to HS2 the CVV will stretch for more than 3.4km (2 miles) across a series of lakes and waterways between Hillingdon and the M25. It will be the longest railway bridge in the UK and almost a kilometre longer than the Forth Rail Bridge. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, callin
Harefield, UK. 5th February, 2022. A view of works for the HS2 Colne Valley Viaduct, which will become the UK's longest railway bridge, at HOAC Lake (Harefield Lake No. 2). A viaduct requiring 292 piles driven into the aquifer, a natural water filtration system, is currently being constructed to carry HS2 across lakes and watercourses in the Colne Valley Regional Park. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-5th-february-2022-a-view-of-works-for-the-hs2-colne-valley-viaduct-which-will-become-the-uks-longest-railway-bridge-at-hoac-lake-harefield-lake-no-2-a-viaduct-requiring-292-piles-driven-into-the-aquifer-a-natural-water-filtration-system-is-currently-being-constructed-to-carry-hs2-across-lakes-and-watercourses-in-the-colne-valley-regional-park-credit-mark-kerrisonalamy-live-news-image459801268.html
RM2HM1N5T–Harefield, UK. 5th February, 2022. A view of works for the HS2 Colne Valley Viaduct, which will become the UK's longest railway bridge, at HOAC Lake (Harefield Lake No. 2). A viaduct requiring 292 piles driven into the aquifer, a natural water filtration system, is currently being constructed to carry HS2 across lakes and watercourses in the Colne Valley Regional Park. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 3rd November, 2022. Construction works for the Colne Valley Viaduct for the HS2 high-speed rail link are pictured in Savay Lake. Mark Harper, the new Secretary of State for Transport, has advised that the government is examining all options regarding the HS2 project in advance of expected spending cuts in the autumn statement. Phase one between London and Birmingham is due to open between 2029 and 2033. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-3rd-november-2022-construction-works-for-the-colne-valley-viaduct-for-the-hs2-high-speed-rail-link-are-pictured-in-savay-lake-mark-harper-the-new-secretary-of-state-for-transport-has-advised-that-the-government-is-examining-all-options-regarding-the-hs2-project-in-advance-of-expected-spending-cuts-in-the-autumn-statement-phase-one-between-london-and-birmingham-is-due-to-open-between-2029-and-2033-credit-mark-kerrisonalamy-live-news-image489299196.html
RM2KC1E38–Harefield, UK. 3rd November, 2022. Construction works for the Colne Valley Viaduct for the HS2 high-speed rail link are pictured in Savay Lake. Mark Harper, the new Secretary of State for Transport, has advised that the government is examining all options regarding the HS2 project in advance of expected spending cuts in the autumn statement. Phase one between London and Birmingham is due to open between 2029 and 2033. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 3rd August, 2023. Construction of the HS2 High Speed Rail Colne Valley Viaduct (CVV) piers across Savay Lake in Harefield for the new High Speed Railway from London to Birmingham is continuing. According to HS2 the CVV will stretch for more than 3.4km (2 miles) across a series of lakes and waterways between Hillingdon and the M25. It will be the longest railway bridge in the UK and almost a kilometre longer than the Forth Rail Bridge. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, callin Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-3rd-august-2023-construction-of-the-hs2-high-speed-rail-colne-valley-viaduct-cvv-piers-across-savay-lake-in-harefield-for-the-new-high-speed-railway-from-london-to-birmingham-is-continuing-according-to-hs2-the-cvv-will-stretch-for-more-than-34km-2-miles-across-a-series-of-lakes-and-waterways-between-hillingdon-and-the-m25-it-will-be-the-longest-railway-bridge-in-the-uk-and-almost-a-kilometre-longer-than-the-forth-rail-bridge-the-infrastructure-and-projects-authority-has-placed-the-hs2-multi-billion-pound-project-between-london-and-birmingham-on-the-danger-list-callin-image560324372.html
RM2RFGYCM–Harefield, UK. 3rd August, 2023. Construction of the HS2 High Speed Rail Colne Valley Viaduct (CVV) piers across Savay Lake in Harefield for the new High Speed Railway from London to Birmingham is continuing. According to HS2 the CVV will stretch for more than 3.4km (2 miles) across a series of lakes and waterways between Hillingdon and the M25. It will be the longest railway bridge in the UK and almost a kilometre longer than the Forth Rail Bridge. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, callin
Harefield, UK. 19 January, 2020. Early morning mist lies across a lake in Colne Valley Regional Park across which a 3.4 km-long viaduct would be constructed should plans for the HS2 high-speed rail link be approved. Bailiffs acting for HS2 have been evicting Save the Colne Valley and Stop HS2 activists from the Harvil Road wildlife protection camp alongside the lake for the past week and a half. 108 ancient woodlands are set to be destroyed by the high-speed rail link. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-19-january-2020-early-morning-mist-lies-across-a-lake-in-colne-valley-regional-park-across-which-a-34-km-long-viaduct-would-be-constructed-should-plans-for-the-hs2-high-speed-rail-link-be-approved-bailiffs-acting-for-hs2-have-been-evicting-save-the-colne-valley-and-stop-hs2-activists-from-the-harvil-road-wildlife-protection-camp-alongside-the-lake-for-the-past-week-and-a-half-108-ancient-woodlands-are-set-to-be-destroyed-by-the-high-speed-rail-link-credit-mark-kerrisonalamy-live-news-image340464396.html
RM2ANWDPM–Harefield, UK. 19 January, 2020. Early morning mist lies across a lake in Colne Valley Regional Park across which a 3.4 km-long viaduct would be constructed should plans for the HS2 high-speed rail link be approved. Bailiffs acting for HS2 have been evicting Save the Colne Valley and Stop HS2 activists from the Harvil Road wildlife protection camp alongside the lake for the past week and a half. 108 ancient woodlands are set to be destroyed by the high-speed rail link. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 3rd August, 2023. Construction of the HS2 High Speed Rail Colne Valley Viaduct (CVV) piers across Savay Lake in Harefield for the new High Speed Railway from London to Birmingham is continuing. According to HS2 the CVV will stretch for more than 3.4km (2 miles) across a series of lakes and waterways between Hillingdon and the M25. It will be the longest railway bridge in the UK and almost a kilometre longer than the Forth Rail Bridge. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, callin Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-3rd-august-2023-construction-of-the-hs2-high-speed-rail-colne-valley-viaduct-cvv-piers-across-savay-lake-in-harefield-for-the-new-high-speed-railway-from-london-to-birmingham-is-continuing-according-to-hs2-the-cvv-will-stretch-for-more-than-34km-2-miles-across-a-series-of-lakes-and-waterways-between-hillingdon-and-the-m25-it-will-be-the-longest-railway-bridge-in-the-uk-and-almost-a-kilometre-longer-than-the-forth-rail-bridge-the-infrastructure-and-projects-authority-has-placed-the-hs2-multi-billion-pound-project-between-london-and-birmingham-on-the-danger-list-callin-image560324423.html
RM2RFGYEF–Harefield, UK. 3rd August, 2023. Construction of the HS2 High Speed Rail Colne Valley Viaduct (CVV) piers across Savay Lake in Harefield for the new High Speed Railway from London to Birmingham is continuing. According to HS2 the CVV will stretch for more than 3.4km (2 miles) across a series of lakes and waterways between Hillingdon and the M25. It will be the longest railway bridge in the UK and almost a kilometre longer than the Forth Rail Bridge. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, callin
Harefield, UK. 19 January, 2020. Early morning mist lies across a lake in Colne Valley Regional Park across which a 3.4 km-long viaduct would be constructed should plans for the HS2 high-speed rail link be approved. Bailiffs acting for HS2 have been evicting Save the Colne Valley and Stop HS2 activists from the Harvil Road wildlife protection camp alongside the lake for the past week and a half. 108 ancient woodlands are set to be destroyed by the high-speed rail link. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-19-january-2020-early-morning-mist-lies-across-a-lake-in-colne-valley-regional-park-across-which-a-34-km-long-viaduct-would-be-constructed-should-plans-for-the-hs2-high-speed-rail-link-be-approved-bailiffs-acting-for-hs2-have-been-evicting-save-the-colne-valley-and-stop-hs2-activists-from-the-harvil-road-wildlife-protection-camp-alongside-the-lake-for-the-past-week-and-a-half-108-ancient-woodlands-are-set-to-be-destroyed-by-the-high-speed-rail-link-credit-mark-kerrisonalamy-live-news-image340481391.html
RM2ANX7DK–Harefield, UK. 19 January, 2020. Early morning mist lies across a lake in Colne Valley Regional Park across which a 3.4 km-long viaduct would be constructed should plans for the HS2 high-speed rail link be approved. Bailiffs acting for HS2 have been evicting Save the Colne Valley and Stop HS2 activists from the Harvil Road wildlife protection camp alongside the lake for the past week and a half. 108 ancient woodlands are set to be destroyed by the high-speed rail link. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 3rd August, 2023. Construction of the HS2 High Speed Rail Colne Valley Viaduct (CVV) piers across Savay Lake in Harefield for the new High Speed Railway from London to Birmingham is continuing. According to HS2 the CVV will stretch for more than 3.4km (2 miles) across a series of lakes and waterways between Hillingdon and the M25. It will be the longest railway bridge in the UK and almost a kilometre longer than the Forth Rail Bridge. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, callin Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-3rd-august-2023-construction-of-the-hs2-high-speed-rail-colne-valley-viaduct-cvv-piers-across-savay-lake-in-harefield-for-the-new-high-speed-railway-from-london-to-birmingham-is-continuing-according-to-hs2-the-cvv-will-stretch-for-more-than-34km-2-miles-across-a-series-of-lakes-and-waterways-between-hillingdon-and-the-m25-it-will-be-the-longest-railway-bridge-in-the-uk-and-almost-a-kilometre-longer-than-the-forth-rail-bridge-the-infrastructure-and-projects-authority-has-placed-the-hs2-multi-billion-pound-project-between-london-and-birmingham-on-the-danger-list-callin-image560324364.html
RM2RFGYCC–Harefield, UK. 3rd August, 2023. Construction of the HS2 High Speed Rail Colne Valley Viaduct (CVV) piers across Savay Lake in Harefield for the new High Speed Railway from London to Birmingham is continuing. According to HS2 the CVV will stretch for more than 3.4km (2 miles) across a series of lakes and waterways between Hillingdon and the M25. It will be the longest railway bridge in the UK and almost a kilometre longer than the Forth Rail Bridge. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, callin
Harefield, UK. 19 January, 2020. A view through early morning mist over a lake in Colne Valley Regional Park towards the Harvil Road wildlife protection camp from which bailiffs acting for HS2 have been evicting activists from Save the Colne Valley and Stop HS2. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-19-january-2020-a-view-through-early-morning-mist-over-a-lake-in-colne-valley-regional-park-towards-the-harvil-road-wildlife-protection-camp-from-which-bailiffs-acting-for-hs2-have-been-evicting-activists-from-save-the-colne-valley-and-stop-hs2-credit-mark-kerrisonalamy-live-news-image340481383.html
RM2ANX7DB–Harefield, UK. 19 January, 2020. A view through early morning mist over a lake in Colne Valley Regional Park towards the Harvil Road wildlife protection camp from which bailiffs acting for HS2 have been evicting activists from Save the Colne Valley and Stop HS2. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 3rd November, 2022. A swan is pictured in partial sunlight on Harefield Lake No. 2 during construction works for the HS2 high-speed rail link in the Colne Valley. Mark Harper, the new Secretary of State for Transport, has advised that the government is examining all options regarding the HS2 project in advance of expected spending cuts in the autumn statement. Phase one between London and Birmingham is due to open between 2029 and 2033. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-3rd-november-2022-a-swan-is-pictured-in-partial-sunlight-on-harefield-lake-no-2-during-construction-works-for-the-hs2-high-speed-rail-link-in-the-colne-valley-mark-harper-the-new-secretary-of-state-for-transport-has-advised-that-the-government-is-examining-all-options-regarding-the-hs2-project-in-advance-of-expected-spending-cuts-in-the-autumn-statement-phase-one-between-london-and-birmingham-is-due-to-open-between-2029-and-2033-credit-mark-kerrisonalamy-live-news-image489149342.html
RM2KBPJYA–Harefield, UK. 3rd November, 2022. A swan is pictured in partial sunlight on Harefield Lake No. 2 during construction works for the HS2 high-speed rail link in the Colne Valley. Mark Harper, the new Secretary of State for Transport, has advised that the government is examining all options regarding the HS2 project in advance of expected spending cuts in the autumn statement. Phase one between London and Birmingham is due to open between 2029 and 2033. Credit: Mark Kerrison/Alamy Live News
Hillingdon, UK. 16th April, 2024. The part-constructed Colne Valley viaduct for the HS2 high-speed rail link is pictured above Savay Lake. The viaduct will carry HS2 across lakes and watercourses in the Colne Valley Regional Park. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/hillingdon-uk-16th-april-2024-the-part-constructed-colne-valley-viaduct-for-the-hs2-high-speed-rail-link-is-pictured-above-savay-lake-the-viaduct-will-carry-hs2-across-lakes-and-watercourses-in-the-colne-valley-regional-park-credit-mark-kerrisonalamy-live-news-image603290666.html
RM2X1E7B6–Hillingdon, UK. 16th April, 2024. The part-constructed Colne Valley viaduct for the HS2 high-speed rail link is pictured above Savay Lake. The viaduct will carry HS2 across lakes and watercourses in the Colne Valley Regional Park. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 6th April, 2021. Trees felled for the HS2 high-speed rail link alongside the Grand Union Canal. Thousands of trees have already been felled in the Colne Valley where HS2 works will include the construction of a Colne Valley Viaduct across lakes and waterways and electricity pylon relocation. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-6th-april-2021-trees-felled-for-the-hs2-high-speed-rail-link-alongside-the-grand-union-canal-thousands-of-trees-have-already-been-felled-in-the-colne-valley-where-hs2-works-will-include-the-construction-of-a-colne-valley-viaduct-across-lakes-and-waterways-and-electricity-pylon-relocation-credit-mark-kerrisonalamy-live-news-image417665427.html
RM2F7E8EB–Harefield, UK. 6th April, 2021. Trees felled for the HS2 high-speed rail link alongside the Grand Union Canal. Thousands of trees have already been felled in the Colne Valley where HS2 works will include the construction of a Colne Valley Viaduct across lakes and waterways and electricity pylon relocation. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 3rd August, 2023. Construction of the HS2 High Speed Rail Colne Valley Viaduct (CVV) piers across Savay Lake in Harefield for the new High Speed Railway from London to Birmingham is continuing. According to HS2 the CVV will stretch for more than 3.4km (2 miles) across a series of lakes and waterways between Hillingdon and the M25. It will be the longest railway bridge in the UK and almost a kilometre longer than the Forth Rail Bridge. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, callin Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-3rd-august-2023-construction-of-the-hs2-high-speed-rail-colne-valley-viaduct-cvv-piers-across-savay-lake-in-harefield-for-the-new-high-speed-railway-from-london-to-birmingham-is-continuing-according-to-hs2-the-cvv-will-stretch-for-more-than-34km-2-miles-across-a-series-of-lakes-and-waterways-between-hillingdon-and-the-m25-it-will-be-the-longest-railway-bridge-in-the-uk-and-almost-a-kilometre-longer-than-the-forth-rail-bridge-the-infrastructure-and-projects-authority-has-placed-the-hs2-multi-billion-pound-project-between-london-and-birmingham-on-the-danger-list-callin-image560324414.html
RM2RFGYE6–Harefield, UK. 3rd August, 2023. Construction of the HS2 High Speed Rail Colne Valley Viaduct (CVV) piers across Savay Lake in Harefield for the new High Speed Railway from London to Birmingham is continuing. According to HS2 the CVV will stretch for more than 3.4km (2 miles) across a series of lakes and waterways between Hillingdon and the M25. It will be the longest railway bridge in the UK and almost a kilometre longer than the Forth Rail Bridge. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, callin
Harefield, UK. 6th April, 2021. Trees felled for the HS2 high-speed rail link alongside the Grand Union Canal. Thousands of trees have already been felled in the Colne Valley where HS2 works will include the construction of a Colne Valley Viaduct across lakes and waterways and electricity pylon relocation. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-6th-april-2021-trees-felled-for-the-hs2-high-speed-rail-link-alongside-the-grand-union-canal-thousands-of-trees-have-already-been-felled-in-the-colne-valley-where-hs2-works-will-include-the-construction-of-a-colne-valley-viaduct-across-lakes-and-waterways-and-electricity-pylon-relocation-credit-mark-kerrisonalamy-live-news-image417665790.html
RM2F7E8YA–Harefield, UK. 6th April, 2021. Trees felled for the HS2 high-speed rail link alongside the Grand Union Canal. Thousands of trees have already been felled in the Colne Valley where HS2 works will include the construction of a Colne Valley Viaduct across lakes and waterways and electricity pylon relocation. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 3rd August, 2023. Construction of the HS2 High Speed Rail Colne Valley Viaduct (CVV) piers across Savay Lake in Harefield for the new High Speed Railway from London to Birmingham is continuing. According to HS2 the CVV will stretch for more than 3.4km (2 miles) across a series of lakes and waterways between Hillingdon and the M25. It will be the longest railway bridge in the UK and almost a kilometre longer than the Forth Rail Bridge. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, callin Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-3rd-august-2023-construction-of-the-hs2-high-speed-rail-colne-valley-viaduct-cvv-piers-across-savay-lake-in-harefield-for-the-new-high-speed-railway-from-london-to-birmingham-is-continuing-according-to-hs2-the-cvv-will-stretch-for-more-than-34km-2-miles-across-a-series-of-lakes-and-waterways-between-hillingdon-and-the-m25-it-will-be-the-longest-railway-bridge-in-the-uk-and-almost-a-kilometre-longer-than-the-forth-rail-bridge-the-infrastructure-and-projects-authority-has-placed-the-hs2-multi-billion-pound-project-between-london-and-birmingham-on-the-danger-list-callin-image560324294.html
RM2RFGY9X–Harefield, UK. 3rd August, 2023. Construction of the HS2 High Speed Rail Colne Valley Viaduct (CVV) piers across Savay Lake in Harefield for the new High Speed Railway from London to Birmingham is continuing. According to HS2 the CVV will stretch for more than 3.4km (2 miles) across a series of lakes and waterways between Hillingdon and the M25. It will be the longest railway bridge in the UK and almost a kilometre longer than the Forth Rail Bridge. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, callin
Harefield, UK. 6th April, 2021. Trees felled for the HS2 high-speed rail link close to the Grand Union Canal. Thousands of trees have already been felled in the Colne Valley where HS2 works will include the construction of a Colne Valley Viaduct across lakes and waterways and electricity pylon relocation. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-6th-april-2021-trees-felled-for-the-hs2-high-speed-rail-link-close-to-the-grand-union-canal-thousands-of-trees-have-already-been-felled-in-the-colne-valley-where-hs2-works-will-include-the-construction-of-a-colne-valley-viaduct-across-lakes-and-waterways-and-electricity-pylon-relocation-credit-mark-kerrisonalamy-live-news-image417665791.html
RM2F7E8YB–Harefield, UK. 6th April, 2021. Trees felled for the HS2 high-speed rail link close to the Grand Union Canal. Thousands of trees have already been felled in the Colne Valley where HS2 works will include the construction of a Colne Valley Viaduct across lakes and waterways and electricity pylon relocation. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 3rd August, 2023. Construction of the HS2 High Speed Rail Colne Valley Viaduct (CVV) piers across Savay Lake in Harefield for the new High Speed Railway from London to Birmingham is continuing. According to HS2 the CVV will stretch for more than 3.4km (2 miles) across a series of lakes and waterways between Hillingdon and the M25. It will be the longest railway bridge in the UK and almost a kilometre longer than the Forth Rail Bridge. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, callin Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-3rd-august-2023-construction-of-the-hs2-high-speed-rail-colne-valley-viaduct-cvv-piers-across-savay-lake-in-harefield-for-the-new-high-speed-railway-from-london-to-birmingham-is-continuing-according-to-hs2-the-cvv-will-stretch-for-more-than-34km-2-miles-across-a-series-of-lakes-and-waterways-between-hillingdon-and-the-m25-it-will-be-the-longest-railway-bridge-in-the-uk-and-almost-a-kilometre-longer-than-the-forth-rail-bridge-the-infrastructure-and-projects-authority-has-placed-the-hs2-multi-billion-pound-project-between-london-and-birmingham-on-the-danger-list-callin-image560324299.html
RM2RFGYA3–Harefield, UK. 3rd August, 2023. Construction of the HS2 High Speed Rail Colne Valley Viaduct (CVV) piers across Savay Lake in Harefield for the new High Speed Railway from London to Birmingham is continuing. According to HS2 the CVV will stretch for more than 3.4km (2 miles) across a series of lakes and waterways between Hillingdon and the M25. It will be the longest railway bridge in the UK and almost a kilometre longer than the Forth Rail Bridge. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, callin
Harefield, UK. 6th April, 2021. Trees felled for the HS2 high-speed rail link close to the Grand Union Canal. Thousands of trees have already been felled in the Colne Valley where HS2 works will include the construction of a Colne Valley Viaduct across lakes and waterways and electricity pylon relocation. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-6th-april-2021-trees-felled-for-the-hs2-high-speed-rail-link-close-to-the-grand-union-canal-thousands-of-trees-have-already-been-felled-in-the-colne-valley-where-hs2-works-will-include-the-construction-of-a-colne-valley-viaduct-across-lakes-and-waterways-and-electricity-pylon-relocation-credit-mark-kerrisonalamy-live-news-image417665796.html
RM2F7E8YG–Harefield, UK. 6th April, 2021. Trees felled for the HS2 high-speed rail link close to the Grand Union Canal. Thousands of trees have already been felled in the Colne Valley where HS2 works will include the construction of a Colne Valley Viaduct across lakes and waterways and electricity pylon relocation. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 3rd August, 2023. Construction of the HS2 High Speed Rail Colne Valley Viaduct (CVV) piers across Savay Lake in Harefield for the new High Speed Railway from London to Birmingham is continuing. According to HS2 the CVV will stretch for more than 3.4km (2 miles) across a series of lakes and waterways between Hillingdon and the M25. It will be the longest railway bridge in the UK and almost a kilometre longer than the Forth Rail Bridge. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, callin Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-3rd-august-2023-construction-of-the-hs2-high-speed-rail-colne-valley-viaduct-cvv-piers-across-savay-lake-in-harefield-for-the-new-high-speed-railway-from-london-to-birmingham-is-continuing-according-to-hs2-the-cvv-will-stretch-for-more-than-34km-2-miles-across-a-series-of-lakes-and-waterways-between-hillingdon-and-the-m25-it-will-be-the-longest-railway-bridge-in-the-uk-and-almost-a-kilometre-longer-than-the-forth-rail-bridge-the-infrastructure-and-projects-authority-has-placed-the-hs2-multi-billion-pound-project-between-london-and-birmingham-on-the-danger-list-callin-image560324366.html
RM2RFGYCE–Harefield, UK. 3rd August, 2023. Construction of the HS2 High Speed Rail Colne Valley Viaduct (CVV) piers across Savay Lake in Harefield for the new High Speed Railway from London to Birmingham is continuing. According to HS2 the CVV will stretch for more than 3.4km (2 miles) across a series of lakes and waterways between Hillingdon and the M25. It will be the longest railway bridge in the UK and almost a kilometre longer than the Forth Rail Bridge. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, callin
Harefield, UK. 6th April, 2021. Trees marked with orange paint adjacent to an area alongside the Grand Union Canal already cleared of trees for the HS2 high-speed rail link. Thousands of trees have already been felled in the Colne Valley where HS2 works will include the construction of a Colne Valley Viaduct across lakes and waterways and electricity pylon relocation. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-6th-april-2021-trees-marked-with-orange-paint-adjacent-to-an-area-alongside-the-grand-union-canal-already-cleared-of-trees-for-the-hs2-high-speed-rail-link-thousands-of-trees-have-already-been-felled-in-the-colne-valley-where-hs2-works-will-include-the-construction-of-a-colne-valley-viaduct-across-lakes-and-waterways-and-electricity-pylon-relocation-credit-mark-kerrisonalamy-live-news-image417665831.html
RM2F7E90R–Harefield, UK. 6th April, 2021. Trees marked with orange paint adjacent to an area alongside the Grand Union Canal already cleared of trees for the HS2 high-speed rail link. Thousands of trees have already been felled in the Colne Valley where HS2 works will include the construction of a Colne Valley Viaduct across lakes and waterways and electricity pylon relocation. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 3rd November, 2022. Construction works are pictured for the Colne Valley Viaduct for the HS2 high-speed rail link. Mark Harper, the new Secretary of State for Transport, has advised that the government is examining all options regarding the HS2 project in advance of expected spending cuts in the autumn statement. Phase one between London and Birmingham is due to open between 2029 and 2033. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-3rd-november-2022-construction-works-are-pictured-for-the-colne-valley-viaduct-for-the-hs2-high-speed-rail-link-mark-harper-the-new-secretary-of-state-for-transport-has-advised-that-the-government-is-examining-all-options-regarding-the-hs2-project-in-advance-of-expected-spending-cuts-in-the-autumn-statement-phase-one-between-london-and-birmingham-is-due-to-open-between-2029-and-2033-credit-mark-kerrisonalamy-live-news-image489148685.html
RM2KBPJ3W–Harefield, UK. 3rd November, 2022. Construction works are pictured for the Colne Valley Viaduct for the HS2 high-speed rail link. Mark Harper, the new Secretary of State for Transport, has advised that the government is examining all options regarding the HS2 project in advance of expected spending cuts in the autumn statement. Phase one between London and Birmingham is due to open between 2029 and 2033. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 3rd August, 2023. Construction of the HS2 High Speed Rail Colne Valley Viaduct (CVV) piers across Savay Lake in Harefield for the new High Speed Railway from London to Birmingham is continuing. According to HS2 the CVV will stretch for more than 3.4km (2 miles) across a series of lakes and waterways between Hillingdon and the M25. It will be the longest railway bridge in the UK and almost a kilometre longer than the Forth Rail Bridge. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, callin Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-3rd-august-2023-construction-of-the-hs2-high-speed-rail-colne-valley-viaduct-cvv-piers-across-savay-lake-in-harefield-for-the-new-high-speed-railway-from-london-to-birmingham-is-continuing-according-to-hs2-the-cvv-will-stretch-for-more-than-34km-2-miles-across-a-series-of-lakes-and-waterways-between-hillingdon-and-the-m25-it-will-be-the-longest-railway-bridge-in-the-uk-and-almost-a-kilometre-longer-than-the-forth-rail-bridge-the-infrastructure-and-projects-authority-has-placed-the-hs2-multi-billion-pound-project-between-london-and-birmingham-on-the-danger-list-callin-image560324341.html
RM2RFGYBH–Harefield, UK. 3rd August, 2023. Construction of the HS2 High Speed Rail Colne Valley Viaduct (CVV) piers across Savay Lake in Harefield for the new High Speed Railway from London to Birmingham is continuing. According to HS2 the CVV will stretch for more than 3.4km (2 miles) across a series of lakes and waterways between Hillingdon and the M25. It will be the longest railway bridge in the UK and almost a kilometre longer than the Forth Rail Bridge. The Infrastructure and Projects Authority, has placed the HS2 multi-billion pound project between London and Birmingham on the danger list, callin
Harefield, UK. 3rd November, 2022. Construction works are pictured for the Colne Valley Viaduct for the HS2 high-speed rail link. Mark Harper, the new Secretary of State for Transport, has advised that the government is examining all options regarding the HS2 project in advance of expected spending cuts in the autumn statement. Phase one between London and Birmingham is due to open between 2029 and 2033. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-3rd-november-2022-construction-works-are-pictured-for-the-colne-valley-viaduct-for-the-hs2-high-speed-rail-link-mark-harper-the-new-secretary-of-state-for-transport-has-advised-that-the-government-is-examining-all-options-regarding-the-hs2-project-in-advance-of-expected-spending-cuts-in-the-autumn-statement-phase-one-between-london-and-birmingham-is-due-to-open-between-2029-and-2033-credit-mark-kerrisonalamy-live-news-image489298537.html
RM2KC1D7N–Harefield, UK. 3rd November, 2022. Construction works are pictured for the Colne Valley Viaduct for the HS2 high-speed rail link. Mark Harper, the new Secretary of State for Transport, has advised that the government is examining all options regarding the HS2 project in advance of expected spending cuts in the autumn statement. Phase one between London and Birmingham is due to open between 2029 and 2033. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 21st March, 2023. Construction works are pictured for the Colne Valley Viaduct for the HS2 high-speed rail link adjacent to Moorfield Road. The viaduct requires 292 piles and will carry HS2 across lakes and watercourses in the Colne Valley Regional Park. Transport Secretary Mark Harper has announced that the second stage of HS2 from Birmingham to Crewe will be delayed by two years at least and that trains will not run into central London until around 2040. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-21st-march-2023-construction-works-are-pictured-for-the-colne-valley-viaduct-for-the-hs2-high-speed-rail-link-adjacent-to-moorfield-road-the-viaduct-requires-292-piles-and-will-carry-hs2-across-lakes-and-watercourses-in-the-colne-valley-regional-park-transport-secretary-mark-harper-has-announced-that-the-second-stage-of-hs2-from-birmingham-to-crewe-will-be-delayed-by-two-years-at-least-and-that-trains-will-not-run-into-central-london-until-around-2040-credit-mark-kerrisonalamy-live-news-image544564227.html
RM2PHY16B–Harefield, UK. 21st March, 2023. Construction works are pictured for the Colne Valley Viaduct for the HS2 high-speed rail link adjacent to Moorfield Road. The viaduct requires 292 piles and will carry HS2 across lakes and watercourses in the Colne Valley Regional Park. Transport Secretary Mark Harper has announced that the second stage of HS2 from Birmingham to Crewe will be delayed by two years at least and that trains will not run into central London until around 2040. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 3rd August, 2023. A temporary HS2 pipeline and overhead walkway for HS2 contractors across the Grand Union Canal in Harefield between Harefield Lake 1 and Savay Lake. Pedestrian access to Denham Quarry has been rerouted by HS2 across a temporary road above the Grand Union Canal. Construction of the HS2 High Speed Rail Colne Valley Viaduct (CVV) piers across Savay Lake in Harefield for the new High Speed Railway from London to Birmingham is continuing. According to HS2 the CVV will stretch for more than 3.4km (2 miles) across a series of lakes and waterways between Hillingdon an Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-3rd-august-2023-a-temporary-hs2-pipeline-and-overhead-walkway-for-hs2-contractors-across-the-grand-union-canal-in-harefield-between-harefield-lake-1-and-savay-lake-pedestrian-access-to-denham-quarry-has-been-rerouted-by-hs2-across-a-temporary-road-above-the-grand-union-canal-construction-of-the-hs2-high-speed-rail-colne-valley-viaduct-cvv-piers-across-savay-lake-in-harefield-for-the-new-high-speed-railway-from-london-to-birmingham-is-continuing-according-to-hs2-the-cvv-will-stretch-for-more-than-34km-2-miles-across-a-series-of-lakes-and-waterways-between-hillingdon-an-image560324322.html
RM2RFGYAX–Harefield, UK. 3rd August, 2023. A temporary HS2 pipeline and overhead walkway for HS2 contractors across the Grand Union Canal in Harefield between Harefield Lake 1 and Savay Lake. Pedestrian access to Denham Quarry has been rerouted by HS2 across a temporary road above the Grand Union Canal. Construction of the HS2 High Speed Rail Colne Valley Viaduct (CVV) piers across Savay Lake in Harefield for the new High Speed Railway from London to Birmingham is continuing. According to HS2 the CVV will stretch for more than 3.4km (2 miles) across a series of lakes and waterways between Hillingdon an
Harefield, UK. 21st March, 2023. Construction works are pictured for the Colne Valley Viaduct for the HS2 high-speed rail link adjacent to Moorfield Road. The viaduct requires 292 piles and will carry HS2 across lakes and watercourses in the Colne Valley Regional Park. Transport Secretary Mark Harper has announced that the second stage of HS2 from Birmingham to Crewe will be delayed by two years at least and that trains will not run into central London until around 2040. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-21st-march-2023-construction-works-are-pictured-for-the-colne-valley-viaduct-for-the-hs2-high-speed-rail-link-adjacent-to-moorfield-road-the-viaduct-requires-292-piles-and-will-carry-hs2-across-lakes-and-watercourses-in-the-colne-valley-regional-park-transport-secretary-mark-harper-has-announced-that-the-second-stage-of-hs2-from-birmingham-to-crewe-will-be-delayed-by-two-years-at-least-and-that-trains-will-not-run-into-central-london-until-around-2040-credit-mark-kerrisonalamy-live-news-image544564213.html
RM2PHY15W–Harefield, UK. 21st March, 2023. Construction works are pictured for the Colne Valley Viaduct for the HS2 high-speed rail link adjacent to Moorfield Road. The viaduct requires 292 piles and will carry HS2 across lakes and watercourses in the Colne Valley Regional Park. Transport Secretary Mark Harper has announced that the second stage of HS2 from Birmingham to Crewe will be delayed by two years at least and that trains will not run into central London until around 2040. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 3rd August, 2023. A lorry taking away liquid from the HS2 site at Harefield Lake 1. Construction of the HS2 High Speed Rail Colne Valley Viaduct (CVV) piers across Savay Lake in Harefield for the new High Speed Railway from London to Birmingham is continuing. According to HS2 the CVV will stretch for more than 3.4km (2 miles) across a series of lakes and waterways between Hillingdon and the M25. It will be the longest railway bridge in the UK and almost a kilometre longer than the Forth Rail Bridge. The Infrastructure and Projects Authority, has placed the HS2 multi-billion poun Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-3rd-august-2023-a-lorry-taking-away-liquid-from-the-hs2-site-at-harefield-lake-1-construction-of-the-hs2-high-speed-rail-colne-valley-viaduct-cvv-piers-across-savay-lake-in-harefield-for-the-new-high-speed-railway-from-london-to-birmingham-is-continuing-according-to-hs2-the-cvv-will-stretch-for-more-than-34km-2-miles-across-a-series-of-lakes-and-waterways-between-hillingdon-and-the-m25-it-will-be-the-longest-railway-bridge-in-the-uk-and-almost-a-kilometre-longer-than-the-forth-rail-bridge-the-infrastructure-and-projects-authority-has-placed-the-hs2-multi-billion-poun-image560324376.html
RM2RFGYCT–Harefield, UK. 3rd August, 2023. A lorry taking away liquid from the HS2 site at Harefield Lake 1. Construction of the HS2 High Speed Rail Colne Valley Viaduct (CVV) piers across Savay Lake in Harefield for the new High Speed Railway from London to Birmingham is continuing. According to HS2 the CVV will stretch for more than 3.4km (2 miles) across a series of lakes and waterways between Hillingdon and the M25. It will be the longest railway bridge in the UK and almost a kilometre longer than the Forth Rail Bridge. The Infrastructure and Projects Authority, has placed the HS2 multi-billion poun
Harefield, UK. 21st March, 2023. Construction works are pictured for the Colne Valley Viaduct for the HS2 high-speed rail link adjacent to Moorfield Road. The viaduct requires 292 piles and will carry HS2 across lakes and watercourses in the Colne Valley Regional Park. Transport Secretary Mark Harper has announced that the second stage of HS2 from Birmingham to Crewe will be delayed by two years at least and that trains will not run into central London until around 2040. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-21st-march-2023-construction-works-are-pictured-for-the-colne-valley-viaduct-for-the-hs2-high-speed-rail-link-adjacent-to-moorfield-road-the-viaduct-requires-292-piles-and-will-carry-hs2-across-lakes-and-watercourses-in-the-colne-valley-regional-park-transport-secretary-mark-harper-has-announced-that-the-second-stage-of-hs2-from-birmingham-to-crewe-will-be-delayed-by-two-years-at-least-and-that-trains-will-not-run-into-central-london-until-around-2040-credit-mark-kerrisonalamy-live-news-image544564219.html
RM2PHY163–Harefield, UK. 21st March, 2023. Construction works are pictured for the Colne Valley Viaduct for the HS2 high-speed rail link adjacent to Moorfield Road. The viaduct requires 292 piles and will carry HS2 across lakes and watercourses in the Colne Valley Regional Park. Transport Secretary Mark Harper has announced that the second stage of HS2 from Birmingham to Crewe will be delayed by two years at least and that trains will not run into central London until around 2040. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 3rd August, 2023. A temporary HS2 pipeline and overhead walkway for HS2 contractors across the Grand Union Canal in Harefield between Harefield Lake 1 and Savay Lake. Pedestrian access to Denham Quarry has been rerouted by HS2 across a temporary road above the Grand Union Canal. Construction of the HS2 High Speed Rail Colne Valley Viaduct (CVV) piers across Savay Lake in Harefield for the new High Speed Railway from London to Birmingham is continuing. According to HS2 the CVV will stretch for more than 3.4km (2 miles) across a series of lakes and waterways between Hillingdon an Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-3rd-august-2023-a-temporary-hs2-pipeline-and-overhead-walkway-for-hs2-contractors-across-the-grand-union-canal-in-harefield-between-harefield-lake-1-and-savay-lake-pedestrian-access-to-denham-quarry-has-been-rerouted-by-hs2-across-a-temporary-road-above-the-grand-union-canal-construction-of-the-hs2-high-speed-rail-colne-valley-viaduct-cvv-piers-across-savay-lake-in-harefield-for-the-new-high-speed-railway-from-london-to-birmingham-is-continuing-according-to-hs2-the-cvv-will-stretch-for-more-than-34km-2-miles-across-a-series-of-lakes-and-waterways-between-hillingdon-an-image560324332.html
RM2RFGYB8–Harefield, UK. 3rd August, 2023. A temporary HS2 pipeline and overhead walkway for HS2 contractors across the Grand Union Canal in Harefield between Harefield Lake 1 and Savay Lake. Pedestrian access to Denham Quarry has been rerouted by HS2 across a temporary road above the Grand Union Canal. Construction of the HS2 High Speed Rail Colne Valley Viaduct (CVV) piers across Savay Lake in Harefield for the new High Speed Railway from London to Birmingham is continuing. According to HS2 the CVV will stretch for more than 3.4km (2 miles) across a series of lakes and waterways between Hillingdon an
Harefield, UK. 21st March, 2023. Construction works are pictured for the Colne Valley Viaduct for the HS2 high-speed rail link adjacent to Moorfield Road. The viaduct requires 292 piles and will carry HS2 across lakes and watercourses in the Colne Valley Regional Park. Transport Secretary Mark Harper has announced that the second stage of HS2 from Birmingham to Crewe will be delayed by two years at least and that trains will not run into central London until around 2040. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-21st-march-2023-construction-works-are-pictured-for-the-colne-valley-viaduct-for-the-hs2-high-speed-rail-link-adjacent-to-moorfield-road-the-viaduct-requires-292-piles-and-will-carry-hs2-across-lakes-and-watercourses-in-the-colne-valley-regional-park-transport-secretary-mark-harper-has-announced-that-the-second-stage-of-hs2-from-birmingham-to-crewe-will-be-delayed-by-two-years-at-least-and-that-trains-will-not-run-into-central-london-until-around-2040-credit-mark-kerrisonalamy-live-news-image544564229.html
RM2PHY16D–Harefield, UK. 21st March, 2023. Construction works are pictured for the Colne Valley Viaduct for the HS2 high-speed rail link adjacent to Moorfield Road. The viaduct requires 292 piles and will carry HS2 across lakes and watercourses in the Colne Valley Regional Park. Transport Secretary Mark Harper has announced that the second stage of HS2 from Birmingham to Crewe will be delayed by two years at least and that trains will not run into central London until around 2040. Credit: Mark Kerrison/Alamy Live News
Uxbridge, UK. 1 February, 2020. Mark Keir from Save the Colne Valley addresses environmental activists from Stop HS2 and Extinction Rebellion campaigning against the controversial HS2 high-speed rail link during a ‘Still Standing for the Trees’ march from the Harvil Road wildlife protection camp in Harefield through Denham Country Park to three addresses closely linked to Boris Johnson in his Uxbridge constituency. The Prime Minister is expected to make a decision imminently as to whether to proceed with the high-speed rail line. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/uxbridge-uk-1-february-2020-mark-keir-from-save-the-colne-valley-addresses-environmental-activists-from-stop-hs2-and-extinction-rebellion-campaigning-against-the-controversial-hs2-high-speed-rail-link-during-a-still-standing-for-the-trees-march-from-the-harvil-road-wildlife-protection-camp-in-harefield-through-denham-country-park-to-three-addresses-closely-linked-to-boris-johnson-in-his-uxbridge-constituency-the-prime-minister-is-expected-to-make-a-decision-imminently-as-to-whether-to-proceed-with-the-high-speed-rail-line-credit-mark-kerrisonalamy-live-news-image342097837.html
RM2ATFW7W–Uxbridge, UK. 1 February, 2020. Mark Keir from Save the Colne Valley addresses environmental activists from Stop HS2 and Extinction Rebellion campaigning against the controversial HS2 high-speed rail link during a ‘Still Standing for the Trees’ march from the Harvil Road wildlife protection camp in Harefield through Denham Country Park to three addresses closely linked to Boris Johnson in his Uxbridge constituency. The Prime Minister is expected to make a decision imminently as to whether to proceed with the high-speed rail line. Credit: Mark Kerrison/Alamy Live News
Denham, UK. 26th September, 2023. Construction works for the Colne Valley Viaduct for the HS2 high-speed rail link. Speculation is growing as to whether the UK government intends to proceed with sections of HS2 between Birmingham and Manchester and between Old Oak Common and Euston. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/denham-uk-26th-september-2023-construction-works-for-the-colne-valley-viaduct-for-the-hs2-high-speed-rail-link-speculation-is-growing-as-to-whether-the-uk-government-intends-to-proceed-with-sections-of-hs2-between-birmingham-and-manchester-and-between-old-oak-common-and-euston-credit-mark-kerrisonalamy-live-news-image567260872.html
RM2RXTY0T–Denham, UK. 26th September, 2023. Construction works for the Colne Valley Viaduct for the HS2 high-speed rail link. Speculation is growing as to whether the UK government intends to proceed with sections of HS2 between Birmingham and Manchester and between Old Oak Common and Euston. Credit: Mark Kerrison/Alamy Live News
London, UK. 16th April, 2024. A 700-tonne launching girder is used in the construction of the Colne Valley viaduct for the HS2 high-speed rail link. The viaduct will carry HS2 across lakes and watercourses in the Colne Valley Regional Park. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/london-uk-16th-april-2024-a-700-tonne-launching-girder-is-used-in-the-construction-of-the-colne-valley-viaduct-for-the-hs2-high-speed-rail-link-the-viaduct-will-carry-hs2-across-lakes-and-watercourses-in-the-colne-valley-regional-park-credit-mark-kerrisonalamy-live-news-image603569917.html
RM2X1XYGD–London, UK. 16th April, 2024. A 700-tonne launching girder is used in the construction of the Colne Valley viaduct for the HS2 high-speed rail link. The viaduct will carry HS2 across lakes and watercourses in the Colne Valley Regional Park. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 3rd August, 2023. A temporary HS2 pipeline and overhead walkway for HS2 contractors across the Grand Union Canal in Harefield between Harefield Lake 1 and Savay Lake. Construction of the HS2 High Speed Rail Colne Valley Viaduct (CVV) piers across Savay Lake in Harefield for the new High Speed Railway from London to Birmingham is continuing. According to HS2 the CVV will stretch for more than 3.4km (2 miles) across a series of lakes and waterways between Hillingdon and the M25. It will be the longest railway bridge in the UK and almost a kilometre longer than the Forth Rail Brid Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-3rd-august-2023-a-temporary-hs2-pipeline-and-overhead-walkway-for-hs2-contractors-across-the-grand-union-canal-in-harefield-between-harefield-lake-1-and-savay-lake-construction-of-the-hs2-high-speed-rail-colne-valley-viaduct-cvv-piers-across-savay-lake-in-harefield-for-the-new-high-speed-railway-from-london-to-birmingham-is-continuing-according-to-hs2-the-cvv-will-stretch-for-more-than-34km-2-miles-across-a-series-of-lakes-and-waterways-between-hillingdon-and-the-m25-it-will-be-the-longest-railway-bridge-in-the-uk-and-almost-a-kilometre-longer-than-the-forth-rail-brid-image560324275.html
RM2RFGY97–Harefield, UK. 3rd August, 2023. A temporary HS2 pipeline and overhead walkway for HS2 contractors across the Grand Union Canal in Harefield between Harefield Lake 1 and Savay Lake. Construction of the HS2 High Speed Rail Colne Valley Viaduct (CVV) piers across Savay Lake in Harefield for the new High Speed Railway from London to Birmingham is continuing. According to HS2 the CVV will stretch for more than 3.4km (2 miles) across a series of lakes and waterways between Hillingdon and the M25. It will be the longest railway bridge in the UK and almost a kilometre longer than the Forth Rail Brid
Harefield, UK. 26 June, 2020. A detail of a lake currently used by Hillingdon Outdoor Activities Centre (HOAC). The HOAC centre itself will soon be demolished as part of works requiring a viaduct for the HS2 high-speed rail link. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-26-june-2020-a-detail-of-a-lake-currently-used-by-hillingdon-outdoor-activities-centre-hoac-the-hoac-centre-itself-will-soon-be-demolished-as-part-of-works-requiring-a-viaduct-for-the-hs2-high-speed-rail-link-credit-mark-kerrisonalamy-live-news-image364198422.html
RM2C4EJPE–Harefield, UK. 26 June, 2020. A detail of a lake currently used by Hillingdon Outdoor Activities Centre (HOAC). The HOAC centre itself will soon be demolished as part of works requiring a viaduct for the HS2 high-speed rail link. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 12th September, 2020. A banner advertising the popular Hillingdon Outdoor Activities Centre (HOAC). HOAC, situated on HOAC lake, has now been closed to accommodate works for the £106bn HS2 high-speed rail link. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-12th-september-2020-a-banner-advertising-the-popular-hillingdon-outdoor-activities-centre-hoac-hoac-situated-on-hoac-lake-has-now-been-closed-to-accommodate-works-for-the-106bn-hs2-high-speed-rail-link-credit-mark-kerrisonalamy-live-news-image371802849.html
RM2CGW295–Harefield, UK. 12th September, 2020. A banner advertising the popular Hillingdon Outdoor Activities Centre (HOAC). HOAC, situated on HOAC lake, has now been closed to accommodate works for the £106bn HS2 high-speed rail link. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 21st September, 2020. An HS2 security guard holds an item which a colleague had removed from the possessions of an anti-HS2 activist during tree felling works alongside HOAC lake in connection with the HS2 high-speed rail link. Anti-HS2 activists continue to try to prevent or delay works for the controversial £106bn HS2 high-speed rail link on environmental and cost grounds from a series of protection camps based along the route of the line between London and Birmingham. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-21st-september-2020-an-hs2-security-guard-holds-an-item-which-a-colleague-had-removed-from-the-possessions-of-an-anti-hs2-activist-during-tree-felling-works-alongside-hoac-lake-in-connection-with-the-hs2-high-speed-rail-link-anti-hs2-activists-continue-to-try-to-prevent-or-delay-works-for-the-controversial-106bn-hs2-high-speed-rail-link-on-environmental-and-cost-grounds-from-a-series-of-protection-camps-based-along-the-route-of-the-line-between-london-and-birmingham-credit-mark-kerrisonalamy-live-news-image376399104.html
RM2CTACW4–Harefield, UK. 21st September, 2020. An HS2 security guard holds an item which a colleague had removed from the possessions of an anti-HS2 activist during tree felling works alongside HOAC lake in connection with the HS2 high-speed rail link. Anti-HS2 activists continue to try to prevent or delay works for the controversial £106bn HS2 high-speed rail link on environmental and cost grounds from a series of protection camps based along the route of the line between London and Birmingham. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 3rd August, 2023. A lorry taking away liquid from the HS2 site at Harefield Lake 1. Construction of the HS2 High Speed Rail Colne Valley Viaduct (CVV) piers across Savay Lake in Harefield for the new High Speed Railway from London to Birmingham is continuing. According to HS2 the CVV will stretch for more than 3.4km (2 miles) across a series of lakes and waterways between Hillingdon and the M25. It will be the longest railway bridge in the UK and almost a kilometre longer than the Forth Rail Bridge. The Infrastructure and Projects Authority, has placed the HS2 multi-billion poun Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-3rd-august-2023-a-lorry-taking-away-liquid-from-the-hs2-site-at-harefield-lake-1-construction-of-the-hs2-high-speed-rail-colne-valley-viaduct-cvv-piers-across-savay-lake-in-harefield-for-the-new-high-speed-railway-from-london-to-birmingham-is-continuing-according-to-hs2-the-cvv-will-stretch-for-more-than-34km-2-miles-across-a-series-of-lakes-and-waterways-between-hillingdon-and-the-m25-it-will-be-the-longest-railway-bridge-in-the-uk-and-almost-a-kilometre-longer-than-the-forth-rail-bridge-the-infrastructure-and-projects-authority-has-placed-the-hs2-multi-billion-poun-image560324408.html
RM2RFGYE0–Harefield, UK. 3rd August, 2023. A lorry taking away liquid from the HS2 site at Harefield Lake 1. Construction of the HS2 High Speed Rail Colne Valley Viaduct (CVV) piers across Savay Lake in Harefield for the new High Speed Railway from London to Birmingham is continuing. According to HS2 the CVV will stretch for more than 3.4km (2 miles) across a series of lakes and waterways between Hillingdon and the M25. It will be the longest railway bridge in the UK and almost a kilometre longer than the Forth Rail Bridge. The Infrastructure and Projects Authority, has placed the HS2 multi-billion poun
Harefield, UK. 21st September, 2020. An HS2 security guard (c) is filmed by an anti-HS2 activist after he removed an item belonging to a fellow activist during tree felling works alongside HOAC lake in connection with the HS2 high-speed rail link. Anti-HS2 activists continue to try to prevent or delay works for the controversial £106bn HS2 high-speed rail link on environmental and cost grounds from a series of protection camps based along the route of the line between London and Birmingham. Credit: Mark Kerrison/Alamy Live News Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-21st-september-2020-an-hs2-security-guard-c-is-filmed-by-an-anti-hs2-activist-after-he-removed-an-item-belonging-to-a-fellow-activist-during-tree-felling-works-alongside-hoac-lake-in-connection-with-the-hs2-high-speed-rail-link-anti-hs2-activists-continue-to-try-to-prevent-or-delay-works-for-the-controversial-106bn-hs2-high-speed-rail-link-on-environmental-and-cost-grounds-from-a-series-of-protection-camps-based-along-the-route-of-the-line-between-london-and-birmingham-credit-mark-kerrisonalamy-live-news-image376399096.html
RM2CTACTT–Harefield, UK. 21st September, 2020. An HS2 security guard (c) is filmed by an anti-HS2 activist after he removed an item belonging to a fellow activist during tree felling works alongside HOAC lake in connection with the HS2 high-speed rail link. Anti-HS2 activists continue to try to prevent or delay works for the controversial £106bn HS2 high-speed rail link on environmental and cost grounds from a series of protection camps based along the route of the line between London and Birmingham. Credit: Mark Kerrison/Alamy Live News
Harefield, UK. 3rd August, 2023. A temporary HS2 pipeline and overhead walkway for HS2 contractors across the Grand Union Canal in Harefield between Harefield Lake 1 and Savay Lake. Pedestrian access to Denham Quarry has been rerouted by HS2 across a temporary road above the Grand Union Canal. Construction of the HS2 High Speed Rail Colne Valley Viaduct (CVV) piers across Savay Lake in Harefield for the new High Speed Railway from London to Birmingham is continuing. According to HS2 the CVV will stretch for more than 3.4km (2 miles) across a series of lakes and waterways between Hillingdon an Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/harefield-uk-3rd-august-2023-a-temporary-hs2-pipeline-and-overhead-walkway-for-hs2-contractors-across-the-grand-union-canal-in-harefield-between-harefield-lake-1-and-savay-lake-pedestrian-access-to-denham-quarry-has-been-rerouted-by-hs2-across-a-temporary-road-above-the-grand-union-canal-construction-of-the-hs2-high-speed-rail-colne-valley-viaduct-cvv-piers-across-savay-lake-in-harefield-for-the-new-high-speed-railway-from-london-to-birmingham-is-continuing-according-to-hs2-the-cvv-will-stretch-for-more-than-34km-2-miles-across-a-series-of-lakes-and-waterways-between-hillingdon-an-image560324326.html
RM2RFGYB2–Harefield, UK. 3rd August, 2023. A temporary HS2 pipeline and overhead walkway for HS2 contractors across the Grand Union Canal in Harefield between Harefield Lake 1 and Savay Lake. Pedestrian access to Denham Quarry has been rerouted by HS2 across a temporary road above the Grand Union Canal. Construction of the HS2 High Speed Rail Colne Valley Viaduct (CVV) piers across Savay Lake in Harefield for the new High Speed Railway from London to Birmingham is continuing. According to HS2 the CVV will stretch for more than 3.4km (2 miles) across a series of lakes and waterways between Hillingdon an