U.S. Navy Seabees with Underwater Construction Team 2 (UCT 2) Construction Diving Detachment Bravo (CDDB), prepare to enter the water at Commander, Fleet Activities Sasebo (CFAS) to connect rigging to submerged steel piles on January 24, 2018. CDDB used various underwater demolition techniques including underwater cutting, explosives, and lift bags to remove hazards to navigation from Sasebo's harbor. CDDB is on the first stop of their six-month deployment where they are conducting inspection, maintenance, and repair of various underwater and waterfront facilities in support of the Pacific Fl
Image details
Contributor:
RP Library / Alamy Stock PhotoImage ID:
M1TH8DFile size:
5.7 MB (417.2 KB Compressed download)Releases:
Model - no | Property - noDo I need a release?Dimensions:
1632 x 1224 px | 27.6 x 20.7 cm | 10.9 x 8.2 inches | 150dpiMore information:
This image is a public domain image, which means either that copyright has expired in the image or the copyright holder has waived their copyright. Alamy charges you a fee for access to the high resolution copy of the image.
This image could have imperfections as it’s either historical or reportage.
U.S. Navy Seabees with Underwater Construction Team 2 (UCT 2) Construction Diving Detachment Bravo (CDDB), prepare to enter the water at Commander, Fleet Activities Sasebo (CFAS) to connect rigging to submerged steel piles on January 24, 2018. CDDB used various underwater demolition techniques including underwater cutting, explosives, and lift bags to remove hazards to navigation from Sasebo's harbor. CDDB is on the first stop of their six-month deployment where they are conducting inspection, maintenance, and repair of various underwater and waterfront facilities in support of the Pacific Fleet. (U.S. Navy