Surveyors examine the iron work on Madeira Terrace on Brighton seafront. A total of 148 arches are to be fully restored at an estimated cost of more than £24 million pounds. The entire Grade II-listed cast iron structure that forms Brighton's Madeira Terraces has been closed to the public over fears parts could collapse.

Surveyors examine the iron work on Madeira Terrace on Brighton seafront. A total of 148 arches are to be fully restored at an estimated cost of  more than £24 million pounds. The entire Grade II-listed cast iron structure that forms Brighton's Madeira Terraces has been closed to the public over fears parts could collapse. Stock Photo
Preview

Image details

Contributor:

James Boardman / Alamy Stock Photo

Image ID:

M7X7K4

File size:

45.7 MB (1.6 MB Compressed download)

Releases:

Model - no | Property - noDo I need a release?

Dimensions:

4908 x 3258 px | 41.6 x 27.6 cm | 16.4 x 10.9 inches | 300dpi

Date taken:

13 March 2018

Location:

Brighton, UK

More information:

This image could have imperfections as it’s either historical or reportage.