SAVE 40% ON SINGLE IMAGE PURCHASES - OFFER ENDS SOON, USE CODE: IMAGESAVE40%

The finished, brand new A14 motorway is photographed with a drone near Grabow, Germany, 16 December 2017. The Eldetal Bridge is one of the longest with a length of 506, 5 metres between Groß Warnow and Grabow. The section will be officially opened on the 20th of December 2017. The 155 kilomtre line between Schwerin and Magdeburg cost approximately 1, 3 billion Euros and should be completed by 2020. Photo: Jens Büttner/dpa-Zentralbild/dpa

The finished, brand new A14 motorway is photographed with a drone near Grabow, Germany, 16 December 2017. The Eldetal Bridge is one of the longest with a length of 506, 5 metres between Groß Warnow and Grabow. The section will be officially opened on the 20th of December 2017. The 155 kilomtre line between Schwerin and Magdeburg cost approximately 1, 3 billion Euros and should be completed by 2020. Photo: Jens Büttner/dpa-Zentralbild/dpa Stock Photo
Preview

Image details

Contributor:

dpa picture alliance / Alamy Stock Photo

Image ID:

KR5TFD

File size:

45.1 MB (2.4 MB Compressed download)

Releases:

Model - no | Property - noDo I need a release?

Dimensions:

4582 x 3439 px | 38.8 x 29.1 cm | 15.3 x 11.5 inches | 300dpi

Date taken:

16 December 2017

Photographer:

dpa

More information:

This image could have imperfections as it’s either historical or reportage.

Search stock photos by tags