The finished, brand new A14 motorway is photographed with a drone near Grabow, Germany, 16 December 2017. The Eldetal Bridge is one of the longest with a length of 506, 5 metres between Groß Warnow and Grabow. The section will be officially opened on the 20th of December 2017. The 155 kilomtre line between Schwerin and Magdeburg cost approximately 1, 3 billion Euros and should be completed by 2020. Photo: Jens Büttner/dpa-Zentralbild/dpa
RMID:Image ID:KR5TFD
Image details
Contributor:
dpa picture alliance / Alamy Stock PhotoImage ID:
KR5TFDFile size:
45.1 MB (2.4 MB Compressed download)Releases:
Model - no | Property - noDo I need a release?Dimensions:
4582 x 3439 px | 38.8 x 29.1 cm | 15.3 x 11.5 inches | 300dpiDate taken:
16 December 2017Photographer:
dpaMore information:
This image could have imperfections as it’s either historical or reportage.