Sand and gravel plant. The building to the right is the crusher plant from which the conveyor runs to the balancing pile over the two tunnels carrying conveyors to the top floor of the screen house where it is washed, screened and classified and then delivered to stock piles. Below the crusher plant is a 100,000 gallon water supply surge tank and below that are the two 3.6 million gallon clarifier tanks; between the clarifier units is the 130,000 gallon equalizer tank, to the left of which is the sludge pumping plant. The straight line running to the river is the 16-inch water supply pipe. The

Sand and gravel plant. The building to the right is the crusher plant from which the conveyor runs to the balancing pile over the two tunnels carrying conveyors to the top floor of the screen house where it is washed, screened and classified and then delivered to stock piles. Below the crusher plant is a 100,000 gallon water supply surge tank and below that are the two 3.6 million gallon clarifier tanks; between the clarifier units is the 130,000 gallon equalizer tank, to the left of which is the sludge pumping plant. The straight line running to the river is the 16-inch water supply pipe. The Stock Photo
Preview

Image details

Contributor:

Tango Images / Alamy Stock Photo

Image ID:

TYJJDT

File size:

71.5 MB (3.1 MB Compressed download)

Releases:

Model - no | Property - noDo I need a release?

Dimensions:

5657 x 4418 px | 47.9 x 37.4 cm | 18.9 x 14.7 inches | 300dpi

More information:

This image is a public domain image, which means either that copyright has expired in the image or the copyright holder has waived their copyright. Alamy charges you a fee for access to the high resolution copy of the image.

This image could have imperfections as it’s either historical or reportage.

Sand and gravel plant. The building to the right is the crusher plant from which the conveyor runs to the balancing pile over the two tunnels carrying conveyors to the top floor of the screen house where it is washed, screened and classified and then delivered to stock piles. Below the crusher plant is a 100, 000 gallon water supply surge tank and below that are the two 3.6 million gallon clarifier tanks; between the clarifier units is the 130, 000 gallon equalizer tank, to the left of which is the sludge pumping plant. The straight line running to the river is the 16-inch water supply pipe. The airport can be seen in the distance.; Scope and content: Photograph from Volume Two of a series of photo albums documenting the construction of the Grand Coulee Dam and related work on the Columbia Basin Project.