S128-E-007700 (5 Sept. 2009) --- European Space Agency astronaut Christer Fuglesang, STS-128 mission specialist, participates in the mission's third and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the seven-hour, one-minute spacewalk, Fuglesang and NASA astronaut John “Danny” Olivas (out of frame), mission specialist, deployed the Payload Attachment System (PAS), replaced the Rate Gyro Assembly #2, installed two GPS antennae and did some work to prepare for the installation of Node 3 next year. During connec
![S128-E-007700 (5 Sept. 2009) --- European Space Agency astronaut Christer Fuglesang, STS-128 mission specialist, participates in the mission's third and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the seven-hour, one-minute spacewalk, Fuglesang and NASA astronaut John “Danny” Olivas (out of frame), mission specialist, deployed the Payload Attachment System (PAS), replaced the Rate Gyro Assembly #2, installed two GPS antennae and did some work to prepare for the installation of Node 3 next year. During connec Stock Photo](https://c8.alamy.com/comp/2WBNERX/s128-e-007700-5-sept-2009-european-space-agency-astronaut-christer-fuglesang-sts-128-mission-specialist-participates-in-the-missions-third-and-final-session-of-extravehicular-activity-eva-as-construction-and-maintenance-continue-on-the-international-space-station-during-the-seven-hour-one-minute-spacewalk-fuglesang-and-nasa-astronaut-john-danny-olivas-out-of-frame-mission-specialist-deployed-the-payload-attachment-system-pas-replaced-the-rate-gyro-assembly-2-installed-two-gps-antennae-and-did-some-work-to-prepare-for-the-installation-of-node-3-next-year-during-connec-2WBNERX.jpg)
Image details
Contributor:
NASA/piemags / Alamy Stock PhotoImage ID:
2WBNERXFile size:
35.9 MB (1.5 MB Compressed download)Releases:
Model - no | Property - noDo I need a release?Dimensions:
4288 x 2929 px | 36.3 x 24.8 cm | 14.3 x 9.8 inches | 300dpiDate taken:
5 September 2009More information:
This image is a public domain image, which means either that copyright has expired in the image or the copyright holder has waived their copyright. Alamy charges you a fee for access to the high resolution copy of the image.
This image could have imperfections as it’s either historical or reportage.
S128-E-007700 (5 Sept. 2009) --- European Space Agency astronaut Christer Fuglesang, STS-128 mission specialist, participates in the mission's third and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the seven-hour, one-minute spacewalk, Fuglesang and NASA astronaut John “Danny” Olivas (out of frame), mission specialist, deployed the Payload Attachment System (PAS), replaced the Rate Gyro Assembly #2, installed two GPS antennae and did some work to prepare for the installation of Node 3 next year. During connection of one of two sets of avionics cables for Node 3, one of the connectors could not be mated. This cable and connector were wrapped in a protective sleeve and safed. All other cables were mated successfully.