Recklinghausen, North Rhine-Westphalia, Germany - barrier system on the A43 due to ailing bridge to control vehicles from 3.5 tons between the crosses Recklinghausen and Herne. The ailing Emschertal Bridge is no longer stable enough for heavy loads. It should be completely renovated by the end of 2025.
RMID:Image ID:2HMH83Y
Image details
Contributor:
mauritius images GmbH / Alamy Stock PhotoImage ID:
2HMH83YFile size:
63.3 MB (2.2 MB Compressed download)Releases:
Model - no | Property - noDo I need a release?Dimensions:
5436 x 4069 px | 46 x 34.5 cm | 18.1 x 13.6 inches | 300dpiDate taken:
20 December 2021Photographer:
Rupert Oberhäuser