Photo taken on February 10, 2023 shows the final phase of connecting the bridge over the Cetina river at 70 meters above sea level, in Omis, Croatia. The Omis bypass is one of the largest infrastructure projects in the Split-Dalmatia County and is valued at €24m. Bypass include two tunnels, Komorjak more than 600 meters long and Omis more than 500 meters long, and a bridge across the Cetina river with a length of 216 meters. Photo: Ivo Cagalj/PIXSELL

Photo taken on February 10, 2023 shows the final phase of connecting the bridge over the Cetina river at 70 meters above sea level, in Omis, Croatia. The Omis bypass is one of the largest infrastructure projects in the Split-Dalmatia County and is valued at €24m. Bypass include two tunnels, Komorjak more than 600 meters long and Omis more than 500 meters long, and a bridge across the Cetina river with a length of 216 meters. Photo: Ivo Cagalj/PIXSELL Stock Photo
Preview

Image details

Contributor:

Pixsell / Alamy Stock Photo

Image ID:

2N7581K

File size:

29.8 MB (1.4 MB Compressed download)

Releases:

Model - no | Property - noDo I need a release?

Dimensions:

4000 x 2600 px | 33.9 x 22 cm | 13.3 x 8.7 inches | 300dpi

Date taken:

10 February 2023

More information:

This image could have imperfections as it’s either historical or reportage.

Available for editorial and personal use only. Get in touch for commercial uses.

Search stock photos by tags