Operations at the Fort McCoy Central Issue Facility (CIF) are shown Oct. 27, 2022, at Fort McCoy, Wis. The facility (building 780) was built at a cost of more than $9 million. Central Issue Facility personnel began operations at the building Sept. 14, 2015. Operating out of a 62,548-square-foot facility in building 780, CIF personnel have plenty of space to store equipment and support customers. Since 2011, the Fort McCoy CIF has been issuing Reserve Soldiers their entire Organizational Clothing and Individual Equipment needs.

Operations at the Fort McCoy Central Issue Facility (CIF) are shown Oct. 27, 2022, at Fort McCoy, Wis. The facility (building 780) was built at a cost of more than $9 million. Central Issue Facility personnel began operations at the building Sept. 14, 2015. Operating out of a 62,548-square-foot facility in building 780, CIF personnel have plenty of space to store equipment and support customers. Since 2011, the Fort McCoy CIF has been issuing Reserve Soldiers their entire Organizational Clothing and Individual Equipment needs. Stock Photo
Preview

Image details

Contributor:

Operation 2022 / Alamy Stock Photo

Image ID:

2KG3HA4

File size:

23.5 MB (1.8 MB Compressed download)

Releases:

Model - no | Property - noDo I need a release?

Dimensions:

3819 x 2150 px | 32.3 x 18.2 cm | 12.7 x 7.2 inches | 300dpi

Date taken:

27 October 2022

More information:

This image could have imperfections as it’s either historical or reportage.

Search stock photos by tags