Mainz, Germany. 28th Jan, 2021. The section for the new Schierstein bridge is being brought into position by a pontoon ship. From the ship, the 2,000-tonne, 120-metre-long component will be hoisted into its final position using steel cables. Credit: Andreas Arnold/dpa/Alamy Live News
RMID:Image ID:2E5KGPF
Image details
Contributor:
dpa picture alliance / Alamy Stock PhotoImage ID:
2E5KGPFFile size:
52.1 MB (2.8 MB Compressed download)Releases:
Model - no | Property - noDo I need a release?Dimensions:
5625 x 3239 px | 47.6 x 27.4 cm | 18.8 x 10.8 inches | 300dpiDate taken:
28 January 2021Photographer:
dpaMore information:
This image could have imperfections as it’s either historical or reportage.