SAVE 40% ON SINGLE IMAGE PURCHASES - OFFER ENDS SOON, USE CODE: IMAGESAVE40%

Madrid, Spain. 16th July, 2021. With an investment of 10.7 million, 66,000 passengers are expected to pass through the new space daily. The new Gran Vi-a Metro station has reopened its doors this Friday, July 16, 2021, at 06:00, after having been closed for more than 1,000 days. Almost three years in which it has undergone a radical change in its architecture. Now it sports a futuristic appearance that is not only reflected in the cladding, but also in the small details that the user will find in its path, such as the latest generation access lathes. Credit: Pacific Press Media Production Corp

Madrid, Spain. 16th July, 2021. With an investment of 10.7 million, 66,000 passengers are expected to pass through the new space daily. The new Gran Vi-a Metro station has reopened its doors this Friday, July 16, 2021, at 06:00, after having been closed for more than 1,000 days. Almost three years in which it has undergone a radical change in its architecture. Now it sports a futuristic appearance that is not only reflected in the cladding, but also in the small details that the user will find in its path, such as the latest generation access lathes. Credit: Pacific Press Media Production Corp Stock Photo
Preview

Image details

Contributor:

Pacific Press Media Production Corp. / Alamy Stock Photo

Image ID:

2G8645B

File size:

17.2 MB (513 KB Compressed download)

Releases:

Model - no | Property - noDo I need a release?

Dimensions:

3000 x 2000 px | 25.4 x 16.9 cm | 10 x 6.7 inches | 300dpi

Date taken:

16 July 2021

Photographer:

PACIFIC PRESS

More information:

This image could have imperfections as it’s either historical or reportage.

Available for editorial and personal use only. Get in touch for commercial uses.