London, UK. 3rd August 2017. Construction work taking place at the Chambers Wharf site on the River Thames near Tower Bridge. The Thames Tideway Tunnel will be an under-construction 16 mile tunnel running under the tidal section of the River Thames to deal with raw sewage and rainwater discharges that currently overflow into the river. Starting in 2016, construction of the Thames Tideway Tunnel will take seven to eight years, giving a target completion date of 2023 and will cost an estimated £4.2 billion. Credit: Vickie Flores/Alamy Live News

London, UK. 3rd August 2017. Construction work taking place at the Chambers Wharf site on the River Thames near Tower Bridge. The Thames Tideway Tunnel will be an under-construction 16 mile tunnel running under the tidal section of the River Thames to deal with raw sewage and rainwater discharges that currently overflow into the river. Starting in 2016, construction of the Thames Tideway Tunnel will take seven to eight years, giving a target completion date of 2023 and will cost an estimated £4.2 billion. Credit: Vickie Flores/Alamy Live News Stock Photo
Preview

Image details

Contributor:

Vickie Flores / Alamy Stock Photo

Image ID:

JR7CEE

File size:

30.5 MB (1.8 MB Compressed download)

Releases:

Model - no | Property - noDo I need a release?

Dimensions:

4000 x 2667 px | 33.9 x 22.6 cm | 13.3 x 8.9 inches | 300dpi

Date taken:

3 August 2017

More information:

This image could have imperfections as it’s either historical or reportage.

This image can't be licensed for personal use (e.g. personal prints).