Harefield, Uxbridge, UK. 27th January, 2023. HS2 High Speed Rail construction work for the viaduct of sheet piling, installing cofferdams and jetty building have taken place across Harefield Lake No 2. Rotary piling for the ground and lake piers is now underway. The popular Hillingdon Outdoor Activities Centre (pictured) for sailing and boating on the lake has been permanently closed due to HS2. It has been widely reported in the press today that there is a possibility that HS2 could terminate in West London and not Euston due to costs, however, Chancellor Jeremy Hunt has denied this and said
Image details
Contributor:
Maureen McLean / Alamy Stock PhotoImage ID:
2MJR2E8File size:
38.6 MB (2.8 MB Compressed download)Releases:
Model - no | Property - noDo I need a release?Dimensions:
4500 x 3000 px | 38.1 x 25.4 cm | 15 x 10 inches | 300dpiDate taken:
27 January 2023Location:
Harfield, Uxbridge, London Borough of Hillingdon, UKMore information:
This image could have imperfections as it’s either historical or reportage.
Harefield, Uxbridge, UK. 27th January, 2023. HS2 High Speed Rail construction work for the viaduct of sheet piling, installing cofferdams and jetty building have taken place across Harefield Lake No 2. Rotary piling for the ground and lake piers is now underway. The popular Hillingdon Outdoor Activities Centre (pictured) for sailing and boating on the lake has been permanently closed due to HS2. It has been widely reported in the press today that there is a possibility that HS2 could terminate in West London and not Euston due to costs, however, Chancellor Jeremy Hunt has denied this and said "that he could not see any conceivable circumstance where HS2 would not terminate in Central London". Credit: Maureen McLean/Alamy Live News