Gruenheide, 08.05.2021 - Aerial view of the Tesla Gigafactory construction site in the Freienbrink district of Gruenheide. The opening of the Gigafactory is delayed. Here, 500,000 electric cars are to be produced annually. [automated translation]

Gruenheide, 08.05.2021 - Aerial view of the Tesla Gigafactory construction site in the Freienbrink district of Gruenheide. The opening of the Gigafactory is delayed. Here, 500,000 electric cars are to be produced annually. [automated translation] Stock Photo
Preview

Image details

Contributor:

Sueddeutsche Zeitung Photo / Alamy Stock Photo

Image ID:

2J5D1EN

File size:

56.9 MB (2.6 MB Compressed download)

Releases:

Model - no | Property - noDo I need a release?

Dimensions:

5464 x 3640 px | 46.3 x 30.8 cm | 18.2 x 12.1 inches | 300dpi

Date taken:

8 May 2021

Location:

Brandenburg, Germany

More information:

This image could have imperfections as it’s either historical or reportage.

Tesla Gigafactory construction site. Gruenheide, 08.05.2021 - Aerial view of the Tesla Gigafactory construction site in the Freienbrink district of Gruenheide. The opening of the Gigafactory is delayed. Here, 500, 000 electric cars are to be produced annually. [automated translation]. Date created: 08/05/2021