Glasgow, Scotland, UK. 23 March 2021. Glasgow, Scotland, UK. An engineer on the viaduct during lane closures on the M8 inspects the structural integrity of the concrete viaduct. All of the bridge piers and half-joints have been marked for remedial measures and repair which will require lengthy lane closures .Iain Masterton/Alamy live News
RMID:Image ID:2F50881
Image details
Contributor:
Iain Masterton / Alamy Stock PhotoImage ID:
2F50881File size:
53.6 MB (3.4 MB Compressed download)Releases:
Model - no | Property - noDo I need a release?Dimensions:
5300 x 3533 px | 44.9 x 29.9 cm | 17.7 x 11.8 inches | 300dpiDate taken:
23 March 2021More information:
This image could have imperfections as it’s either historical or reportage.