Engineers and technicians process the right forward center segment of the Space Launch System solid rocket boosters for the Artemis II mission inside the Rotation, Processing and Surge Facility (RPSF) at NASA’s Kennedy Space Center in Florida by removing the yellow cap and inspecting propellant on Monday, Nov. 27, 2023. Since arriving via rail in September, the team has been examining each segment one-by-one to make sure they are ready for integration and launch before being moved to the Vehicle Assembly Building for stacking atop the mobile launcher. Artemis II astronauts Reid Wiseman, Victor

Engineers and technicians process the right forward center segment of the Space Launch System solid rocket boosters for the Artemis II mission inside the Rotation, Processing and Surge Facility (RPSF) at NASA’s Kennedy Space Center in Florida by removing the yellow cap and inspecting propellant on Monday, Nov. 27, 2023. Since arriving via rail in September, the team has been examining each segment one-by-one to make sure they are ready for integration and launch before being moved to the Vehicle Assembly Building for stacking atop the mobile launcher. Artemis II astronauts Reid Wiseman, Victor Stock Photo
Preview

Image details

Contributor:

NASA/piemags / Alamy Stock Photo

Image ID:

2WBPAWB

File size:

86.1 MB (5.5 MB Compressed download)

Releases:

Model - no | Property - noDo I need a release?

Dimensions:

6720 x 4480 px | 56.9 x 37.9 cm | 22.4 x 14.9 inches | 300dpi

Date taken:

27 November 2023

More information:

This image is a public domain image, which means either that copyright has expired in the image or the copyright holder has waived their copyright. Alamy charges you a fee for access to the high resolution copy of the image.

This image could have imperfections as it’s either historical or reportage.

Engineers and technicians process the right forward center segment of the Space Launch System solid rocket boosters for the Artemis II mission inside the Rotation, Processing and Surge Facility (RPSF) at NASA’s Kennedy Space Center in Florida by removing the yellow cap and inspecting propellant on Monday, Nov. 27, 2023. Since arriving via rail in September, the team has been examining each segment one-by-one to make sure they are ready for integration and launch before being moved to the Vehicle Assembly Building for stacking atop the mobile launcher. Artemis II astronauts Reid Wiseman, Victor Glover, Christina Koch, and Jeremy Hansen will blast off from Kennedy and travel around the moon for the agency’s first crewed mission under Artemis that will test all of the Orion spacecraft’s systems.