Cookham, UK. 12th January, 2024. Flooding residue around a rope on the River Thames. The village of Cookham in Berkshire is slowly beginning to dry out after the River Thames burst its banks last weekend. The river levels are finally dropping. Now the expensive clean up will begin by residents and the Royal Borough of Windsor & Maidenhead. Credit: Maureen McLean/Alamy
![Cookham, UK. 12th January, 2024. Flooding residue around a rope on the River Thames. The village of Cookham in Berkshire is slowly beginning to dry out after the River Thames burst its banks last weekend. The river levels are finally dropping. Now the expensive clean up will begin by residents and the Royal Borough of Windsor & Maidenhead. Credit: Maureen McLean/Alamy Stock Photo](https://c8.alamy.com/comp/2WBXENA/cookham-uk-12th-january-2024-flooding-residue-around-a-rope-on-the-river-thames-the-village-of-cookham-in-berkshire-is-slowly-beginning-to-dry-out-after-the-river-thames-burst-its-banks-last-weekend-the-river-levels-are-finally-dropping-now-the-expensive-clean-up-will-begin-by-residents-and-the-royal-borough-of-windsor-maidenhead-credit-maureen-mcleanalamy-2WBXENA.jpg)
RFID:Image ID:2WBXENA
Image details
Contributor:
Maureen McLean / Alamy Stock PhotoImage ID:
2WBXENAFile size:
43.9 MB (2.3 MB Compressed download)Releases:
Model - no | Property - noDo I need a release?Dimensions:
4800 x 3200 px | 40.6 x 27.1 cm | 16 x 10.7 inches | 300dpiDate taken:
12 January 2024Location:
Cookham, Berkshire, UKMore information:
This image could have imperfections as it’s either historical or reportage.