Bucharest, Romania - 4th Mar, 2024: Walls deeply affected by mold in a multi-family housing block, built in the 50s, in Baltagului street no. 17, sector 5, where the Capital City Hall begins the consolidation works, with funds from the National Recovery and Resilience Plans PNRR. The resistance structure of the building is deeply affected and will be consolidated and rehabilitated by the Municipal Administration for the Consolidation of Seismic Risk Buildings. Credit: Lucian Alecu/Alamy Live
RMID:Image ID:2WNYE09
Image details
Contributor:
Lucian Alecu / Alamy Stock PhotoImage ID:
2WNYE09File size:
68.7 MB (3.2 MB Compressed download)Releases:
Model - no | Property - noDo I need a release?Dimensions:
6000 x 4000 px | 50.8 x 33.9 cm | 20 x 13.3 inches | 300dpiDate taken:
4 March 2024Location:
Bucharest, RomaniaMore information:
This image could have imperfections as it’s either historical or reportage.