A young woman carrying out the naming ceremony for the oil platform Graythorp II. In the early 1970s Laing Pipelines Offshore constructed the Graythorp fabrication yard and dry dock on the site of the old William Gray Shipyard. The company created a dry dock which was used for the construction of fixed platform North Sea drilling rigs for the BP North Sea Oil Project. The oil platform Graythorp I was launched on Saturday 29th June 1974 and on the weekend of 14th-15th June 1975, Graythorp II was named and floated out of the dock basin down the Seaton Channel to where it was handed over to its o

A young woman carrying out the naming ceremony for the oil platform Graythorp II. In the early 1970s Laing Pipelines Offshore constructed the Graythorp fabrication yard and dry dock on the site of the old William Gray Shipyard. The company created a dry dock which was used for the construction of fixed platform North Sea drilling rigs for the BP North Sea Oil Project. The oil platform Graythorp I was launched on Saturday 29th June 1974 and on the weekend of 14th-15th June 1975, Graythorp II was named and floated out of the dock basin down the Seaton Channel to where it was handed over to its o Stock Photo
Preview

Image details

Contributor:

Heritage Image Partnership Ltd  / Alamy Stock Photo

Image ID:

2GGE7EY

File size:

78.4 MB (2.9 MB Compressed download)

Releases:

Model - no | Property - noDo I need a release?

Dimensions:

5197 x 5276 px | 44 x 44.7 cm | 17.3 x 17.6 inches | 300dpi

More information:

This image could have imperfections as it’s either historical or reportage.

A young woman carrying out the naming ceremony for the oil platform Graythorp II. In the early 1970s Laing Pipelines Offshore constructed the Graythorp fabrication yard and dry dock on the site of the old William Gray Shipyard. The company created a dry dock which was used for the construction of fixed platform North Sea drilling rigs for the BP North Sea Oil Project. The oil platform Graythorp I was launched on Saturday 29th June 1974 and on the weekend of 14th-15th June 1975, Graythorp II was named and floated out of the dock basin down the Seaton Channel to where it was handed over to its owners BP.