A construction worker in last minute preparations at the project site where the new biomass energy power plant will be built in Marigat, Baringo County Kenya ca. 28 January 2014

A construction worker in last minute preparations at the project site where the new biomass energy power plant will be built in Marigat, Baringo County Kenya ca. 28 January 2014 Stock Photo
Preview

Image details

Contributor:

Hum Images / Alamy Stock Photo

Image ID:

2GD2R78

File size:

34.5 MB (1.4 MB Compressed download)

Releases:

Model - no | Property - noDo I need a release?

Dimensions:

4256 x 2832 px | 36 x 24 cm | 14.2 x 9.4 inches | 300dpi

Date taken:

28 January 2014

More information:

This image could have imperfections as it’s either historical or reportage.

Available for editorial and personal use only. Get in touch for commercial uses.