Engineer sitting at his work station in the Transmission Control Center, TCC, of transmission network operator 50Hertz Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/stock-photo-engineer-sitting-at-his-work-station-in-the-transmission-control-center-73477150.html
RME7F4RX–Engineer sitting at his work station in the Transmission Control Center, TCC, of transmission network operator 50Hertz
View of new office towers for Total and 50Hertz company tower in new Europacity property development under construction, Berlin Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/stock-photo-view-of-new-office-towers-for-total-and-50hertz-company-tower-in-new-110377735.html
RMGBG3WY–View of new office towers for Total and 50Hertz company tower in new Europacity property development under construction, Berlin
17 April 2018, Germany, Bentwisch: A staff member of grid operator 50Hertz walks through the large switchboard unit at the new transformer substation. The German offshore windparks 'Baltic 1' and 'Baltic 2' and Danish windpark 'Kriegers Flak' both supply the transformer station which connects the powergrids in Germany and Denmark with electricity. The Scandinavian and German powergrids are not synchronised and the transformer converts arriving electricity from the windparks in direct current and switching back again into alternating currents but with a different frequency, which compliant wit Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/17-april-2018-germany-bentwisch-a-staff-member-of-grid-operator-50hertz-walks-through-the-large-switchboard-unit-at-the-new-transformer-substation-the-german-offshore-windparks-baltic-1-and-baltic-2-and-danish-windpark-kriegers-flak-both-supply-the-transformer-station-which-connects-the-powergrids-in-germany-and-denmark-with-electricity-the-scandinavian-and-german-powergrids-are-not-synchronised-and-the-transformer-converts-arriving-electricity-from-the-windparks-in-direct-current-and-switching-back-again-into-alternating-currents-but-with-a-different-frequency-which-compliant-wit-image183071864.html
RMMHRJ0T–17 April 2018, Germany, Bentwisch: A staff member of grid operator 50Hertz walks through the large switchboard unit at the new transformer substation. The German offshore windparks 'Baltic 1' and 'Baltic 2' and Danish windpark 'Kriegers Flak' both supply the transformer station which connects the powergrids in Germany and Denmark with electricity. The Scandinavian and German powergrids are not synchronised and the transformer converts arriving electricity from the windparks in direct current and switching back again into alternating currents but with a different frequency, which compliant wit
Neuenhagen, Germany, 50Hertz Transmission Control Center Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/stock-photo-neuenhagen-germany-50hertz-transmission-control-center-78049565.html
RMEEYD0D–Neuenhagen, Germany, 50Hertz Transmission Control Center
das Logo der Marke '50hertz', Berlin. Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/stock-photo-das-logo-der-marke-50hertz-berlin-124755305.html
RMH6Y2JH–das Logo der Marke '50hertz', Berlin.
Berlin, Germany - march 2019: Modern office building of the 50Hertz Transmission GmbH (former Vattenfall Europe Transmission) Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/berlin-germany-march-2019-modern-office-building-of-the-50hertz-transmission-gmbh-former-vattenfall-europe-transmission-image241087369.html
RFT06DB5–Berlin, Germany - march 2019: Modern office building of the 50Hertz Transmission GmbH (former Vattenfall Europe Transmission)
RM2MYNF2G–Corporate Headquarters, 50hertz Transmission, Heidestraße, Mitte, Berlin, Germany, Europe
German chancellor Angela Merkel and the director of 50Hertz Boris Schucht (r) officially open the new East-West power circuit line in Schwerin, Germany, 18 December 2012. The 380-kw line is regarded as important part of the green energy turn. The current fast line transmits wind energy from North-East between Schwerin and the Kruemmel power plant in Geesthacht, Germany. Photo: JENS BUETTNER Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/stock-photo-german-chancellor-angela-merkel-and-the-director-of-50hertz-boris-52582389.html
RMD1F9AD–German chancellor Angela Merkel and the director of 50Hertz Boris Schucht (r) officially open the new East-West power circuit line in Schwerin, Germany, 18 December 2012. The 380-kw line is regarded as important part of the green energy turn. The current fast line transmits wind energy from North-East between Schwerin and the Kruemmel power plant in Geesthacht, Germany. Photo: JENS BUETTNER
Unternehmenszentrale, 50hertz Transmission, Heidestraße, Mitte, Berlin, Deutschland Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/unternehmenszentrale-50hertz-transmission-heidestrae-mitte-berlin-deutschland-image335652494.html
RM2AE2852–Unternehmenszentrale, 50hertz Transmission, Heidestraße, Mitte, Berlin, Deutschland
Unternehmenszentrale, 50hertz Transmission, Heidestraße, Mitte, Berlin, Deutschland Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/unternehmenszentrale-50hertz-transmission-heidestrae-mitte-berlin-deutschland-image450216011.html
RM2H4D337–Unternehmenszentrale, 50hertz Transmission, Heidestraße, Mitte, Berlin, Deutschland
10.06.2019, Berlin, Germany, Europe - The company headquarters of 50Hertz along Heidestrasse in the Europacity in Berlin Moabit. Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/10062019-berlin-germany-europe-the-company-headquarters-of-50hertz-along-heidestrasse-in-the-europacity-in-berlin-moabit-image260235853.html
RMW3ANDH–10.06.2019, Berlin, Germany, Europe - The company headquarters of 50Hertz along Heidestrasse in the Europacity in Berlin Moabit.
50Hertz company, photographed during the Foreign Minister's trip to Germany in Neuenhagen, July 20, 2022. The trip through Germany takes place as part of the preparation of the national security strategy. Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/50hertz-company-photographed-during-the-foreign-ministers-trip-to-germany-in-neuenhagen-july-20-2022-the-trip-through-germany-takes-place-as-part-of-the-preparation-of-the-national-security-strategy-image478126918.html
RM2JNTFNA–50Hertz company, photographed during the Foreign Minister's trip to Germany in Neuenhagen, July 20, 2022. The trip through Germany takes place as part of the preparation of the national security strategy.
09.06.2019, Berlin, Germany, Europe - The company headquarters of 50Hertz along Heidestrasse in the Europacity in Berlin Moabit. Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/09062019-berlin-germany-europe-the-company-headquarters-of-50hertz-along-heidestrasse-in-the-europacity-in-berlin-moabit-image260235851.html
RMW3ANDF–09.06.2019, Berlin, Germany, Europe - The company headquarters of 50Hertz along Heidestrasse in the Europacity in Berlin Moabit.
Berlin, Germany - Sept 2022: Modern office building of the 50Hertz Transmission GmbH designed by LOVE architecture Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/berlin-germany-sept-2022-modern-office-building-of-the-50hertz-transmission-gmbh-designed-by-love-architecture-image491360888.html
RF2KFBBR4–Berlin, Germany - Sept 2022: Modern office building of the 50Hertz Transmission GmbH designed by LOVE architecture
10.06.2019, Berlin, Germany, Europe - The administrative headquarters of 50Hertz along the Heidestrasse in the Europacity in Berlin-Moabit. 50Hertz Transmission GmbH is a German transmission system operator. [automated translation] Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/10062019-berlin-germany-europe-the-administrative-headquarters-of-50hertz-along-the-heidestrasse-in-the-europacity-in-berlin-moabit-50hertz-transmission-gmbh-is-a-german-transmission-system-operator-automated-translation-image348624851.html
RM2B756FF–10.06.2019, Berlin, Germany, Europe - The administrative headquarters of 50Hertz along the Heidestrasse in the Europacity in Berlin-Moabit. 50Hertz Transmission GmbH is a German transmission system operator. [automated translation]
Unternehmenszentrale, 50hertz Transmission, Heidestraße, Mitte, Berlin, Deutschland Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/unternehmenszentrale-50hertz-transmission-heidestrae-mitte-berlin-deutschland-image397210800.html
RF2E26EC0–Unternehmenszentrale, 50hertz Transmission, Heidestraße, Mitte, Berlin, Deutschland
09.06.2019, Berlin, Germany, Europe - The administrative headquarters of 50Hertz along the Heidestrasse in the Europacity in Berlin-Moabit. 50Hertz Transmission GmbH is a German transmission system operator. [automated translation] Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/09062019-berlin-germany-europe-the-administrative-headquarters-of-50hertz-along-the-heidestrasse-in-the-europacity-in-berlin-moabit-50hertz-transmission-gmbh-is-a-german-transmission-system-operator-automated-translation-image348624781.html
RM2B756D1–09.06.2019, Berlin, Germany, Europe - The administrative headquarters of 50Hertz along the Heidestrasse in the Europacity in Berlin-Moabit. 50Hertz Transmission GmbH is a German transmission system operator. [automated translation]
A complex emergency exercise of German and Czech rescue workers in an electricity power line near Hora Sv. Sebastiana, Czech Republic, on September 16, 2014. Around 200 experts are taking part in the unique international security exercise involving the failure of power grids entitled DRILL by Czech power grid operator CEPS and German operator 50Hertz. (CTK Photo/Ondrej Hajek) Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/stock-photo-a-complex-emergency-exercise-of-german-and-czech-rescue-workers-in-73675961.html
RME7T6C9–A complex emergency exercise of German and Czech rescue workers in an electricity power line near Hora Sv. Sebastiana, Czech Republic, on September 16, 2014. Around 200 experts are taking part in the unique international security exercise involving the failure of power grids entitled DRILL by Czech power grid operator CEPS and German operator 50Hertz. (CTK Photo/Ondrej Hajek)
Stefan Kapferer, CEO de 50Hertz pictured during the inauguration of a peace of the Berlin Wall in Elia site in Brussels, Monday 07 September 2020. BELGA PHOTO THIERRY ROGE Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/stefan-kapferer-ceo-de-50hertz-pictured-during-the-inauguration-of-a-peace-of-the-berlin-wall-in-elia-site-in-brussels-monday-07-september-2020-belga-photo-thierry-roge-image501018241.html
RM2M339TH–Stefan Kapferer, CEO de 50Hertz pictured during the inauguration of a peace of the Berlin Wall in Elia site in Brussels, Monday 07 September 2020. BELGA PHOTO THIERRY ROGE
DEN HAAG - The 50HERTZ Club Train during the 29th edition of the Amsterdam Dance Event (ADE). Spread over five days, more than a thousand music events will take place at over two hundred venues in the capital. ANP DINGENA MOL netherlands out - belgium out Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/den-haag-the-50hertz-club-train-during-the-29th-edition-of-the-amsterdam-dance-event-ade-spread-over-five-days-more-than-a-thousand-music-events-will-take-place-at-over-two-hundred-venues-in-the-capital-anp-dingena-mol-netherlands-out-belgium-out-image626612705.html
RM2YBCJW5–DEN HAAG - The 50HERTZ Club Train during the 29th edition of the Amsterdam Dance Event (ADE). Spread over five days, more than a thousand music events will take place at over two hundred venues in the capital. ANP DINGENA MOL netherlands out - belgium out
Detail of facade of new headquarters of 50Hertz power company under construction in new Europacity property development, Berlin Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/stock-photo-detail-of-facade-of-new-headquarters-of-50hertz-power-company-under-110377647.html
RMGBG3PR–Detail of facade of new headquarters of 50Hertz power company under construction in new Europacity property development, Berlin
Stefan Kapferer, CEO 50Hertz Transmission, Einzelbild,angeschnittenes Einzelmotiv, Portrait,Portraet. Ludwig Erhard Gipfel 2025 auf Gut Kaltenbrunn am Tegernsee am 09.05.2025. *** Stefan Kapferer, CEO 50Hertz Transmission, single image, cropped single motif, portrait, portrait Ludwig Erhard Summit 2025 at Gut Kaltenbrunn on Lake Tegernsee on 09 05 2025 Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/stefan-kapferer-ceo-50hertz-transmission-einzelbildangeschnittenes-einzelmotiv-portraitportraet-ludwig-erhard-gipfel-2025-auf-gut-kaltenbrunn-am-tegernsee-am-09052025-stefan-kapferer-ceo-50hertz-transmission-single-image-cropped-single-motif-portrait-portrait-ludwig-erhard-summit-2025-at-gut-kaltenbrunn-on-lake-tegernsee-on-09-05-2025-image677012740.html
RM3B9CGJC–Stefan Kapferer, CEO 50Hertz Transmission, Einzelbild,angeschnittenes Einzelmotiv, Portrait,Portraet. Ludwig Erhard Gipfel 2025 auf Gut Kaltenbrunn am Tegernsee am 09.05.2025. *** Stefan Kapferer, CEO 50Hertz Transmission, single image, cropped single motif, portrait, portrait Ludwig Erhard Summit 2025 at Gut Kaltenbrunn on Lake Tegernsee on 09 05 2025
Neuenhagen, Germany, 50Hertz Transmission Control Center Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/stock-photo-neuenhagen-germany-50hertz-transmission-control-center-78049570.html
RMEEYD0J–Neuenhagen, Germany, 50Hertz Transmission Control Center
RM2MYNF2Y–Corporate Headquarters, 50hertz Transmission, Heidestraße, Mitte, Berlin, Germany, Europe
50 Hertz in Berlin Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/50-hertz-in-berlin-image327382849.html
RM2A0HG4H–50 Hertz in Berlin
Unternehmenszentrale, 50hertz Transmission, Heidestraße, Mitte, Berlin, Deutschland Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/unternehmenszentrale-50hertz-transmission-heidestrae-mitte-berlin-deutschland-image335652510.html
RM2AE285J–Unternehmenszentrale, 50hertz Transmission, Heidestraße, Mitte, Berlin, Deutschland
Unternehmenszentrale, 50hertz Transmission, Heidestraße, Mitte, Berlin, Deutschland Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/unternehmenszentrale-50hertz-transmission-heidestrae-mitte-berlin-deutschland-image450216007.html
RM2H4D333–Unternehmenszentrale, 50hertz Transmission, Heidestraße, Mitte, Berlin, Deutschland
Wikinger Offshore Windfarm Construction Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/stock-photo-wikinger-offshore-windfarm-construction-143169356.html
RFJ8WWY8–Wikinger Offshore Windfarm Construction
50Hertz company, photographed during the Foreign Minister's trip to Germany in Neuenhagen, July 20, 2022. The trip through Germany takes place as part of the preparation of the national security strategy. Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/50hertz-company-photographed-during-the-foreign-ministers-trip-to-germany-in-neuenhagen-july-20-2022-the-trip-through-germany-takes-place-as-part-of-the-preparation-of-the-national-security-strategy-image478126616.html
RM2JNTFAG–50Hertz company, photographed during the Foreign Minister's trip to Germany in Neuenhagen, July 20, 2022. The trip through Germany takes place as part of the preparation of the national security strategy.
09.06.2019, Berlin, Germany, Europe - The company headquarters of 50Hertz along Heidestrasse in the Europacity in Berlin Moabit. Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/09062019-berlin-germany-europe-the-company-headquarters-of-50hertz-along-heidestrasse-in-the-europacity-in-berlin-moabit-image260235826.html
RMW3ANCJ–09.06.2019, Berlin, Germany, Europe - The company headquarters of 50Hertz along Heidestrasse in the Europacity in Berlin Moabit.
22 June 2022, Saxony-Anhalt, Bad Lauchstädt: Along a long-distance road, the facilities of the Bad Lauchstädt substation can be seen standing out against the blue sky. The substation is one of over 70 electricity hubs operated by the transmission system operator 50Hertz in eastern Germany and needs to be expanded in the course of the energy transition. Two so-called STATCOMs. are being built here to collect electricity from renewable energies, transform it to a higher voltage level and transport it to other regions via extra-high voltage lines. The high-tech facilities are intended to keep the Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/22-june-2022-saxony-anhalt-bad-lauchstdt-along-a-long-distance-road-the-facilities-of-the-bad-lauchstdt-substation-can-be-seen-standing-out-against-the-blue-sky-the-substation-is-one-of-over-70-electricity-hubs-operated-by-the-transmission-system-operator-50hertz-in-eastern-germany-and-needs-to-be-expanded-in-the-course-of-the-energy-transition-two-so-called-statcoms-are-being-built-here-to-collect-electricity-from-renewable-energies-transform-it-to-a-higher-voltage-level-and-transport-it-to-other-regions-via-extra-high-voltage-lines-the-high-tech-facilities-are-intended-to-keep-the-image474045389.html
RM2JF6HMD–22 June 2022, Saxony-Anhalt, Bad Lauchstädt: Along a long-distance road, the facilities of the Bad Lauchstädt substation can be seen standing out against the blue sky. The substation is one of over 70 electricity hubs operated by the transmission system operator 50Hertz in eastern Germany and needs to be expanded in the course of the energy transition. Two so-called STATCOMs. are being built here to collect electricity from renewable energies, transform it to a higher voltage level and transport it to other regions via extra-high voltage lines. The high-tech facilities are intended to keep the
Berlin, Germany - Sept 2022: Modern office building of the 50Hertz Transmission GmbH designed by LOVE architecture Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/berlin-germany-sept-2022-modern-office-building-of-the-50hertz-transmission-gmbh-designed-by-love-architecture-image491360670.html
RF2KFBBFA–Berlin, Germany - Sept 2022: Modern office building of the 50Hertz Transmission GmbH designed by LOVE architecture
Unternehmenszentrale, 50hertz Transmission, Heidestraße, Mitte, Berlin, Deutschland Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/unternehmenszentrale-50hertz-transmission-heidestrae-mitte-berlin-deutschland-image397225080.html
RF2E274J0–Unternehmenszentrale, 50hertz Transmission, Heidestraße, Mitte, Berlin, Deutschland
09.06.2019, Berlin, Germany, Europe - The administrative headquarters of 50Hertz along Heidestrasse in the Europacity in Berlin-Moabit. 50Hertz Transmission GmbH is a German transmission system operator. [automated translation] Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/09062019-berlin-germany-europe-the-administrative-headquarters-of-50hertz-along-heidestrasse-in-the-europacity-in-berlin-moabit-50hertz-transmission-gmbh-is-a-german-transmission-system-operator-automated-translation-image348624778.html
RM2B756CX–09.06.2019, Berlin, Germany, Europe - The administrative headquarters of 50Hertz along Heidestrasse in the Europacity in Berlin-Moabit. 50Hertz Transmission GmbH is a German transmission system operator. [automated translation]
A complex emergency exercise of German and Czech rescue workers in an electricity power line near Hora Sv. Sebastiana, Czech Republic, on September 16, 2014. Around 200 experts are taking part in the unique international security exercise involving the failure of power grids entitled DRILL by Czech power grid operator CEPS and German operator 50Hertz. (CTK Photo/Ondrej Hajek) Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/stock-photo-a-complex-emergency-exercise-of-german-and-czech-rescue-workers-in-73661412.html
RME7RFTM–A complex emergency exercise of German and Czech rescue workers in an electricity power line near Hora Sv. Sebastiana, Czech Republic, on September 16, 2014. Around 200 experts are taking part in the unique international security exercise involving the failure of power grids entitled DRILL by Czech power grid operator CEPS and German operator 50Hertz. (CTK Photo/Ondrej Hajek)
Former European Council president Herman Van Rompuy, Martin Kotthaus, German Ambassador, Chris Peeters, CEO of Elia and Stefan Kapferer, CEO de 50Hertz pictured during the inauguration of a peace of the Berlin Wall in Elia site in Brussels, Monday 07 September 2020. BELGA PHOTO THIERRY ROGE Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/former-european-council-president-herman-van-rompuy-martin-kotthaus-german-ambassador-chris-peeters-ceo-of-elia-and-stefan-kapferer-ceo-de-50hertz-pictured-during-the-inauguration-of-a-peace-of-the-berlin-wall-in-elia-site-in-brussels-monday-07-september-2020-belga-photo-thierry-roge-image501018230.html
RM2M339T6–Former European Council president Herman Van Rompuy, Martin Kotthaus, German Ambassador, Chris Peeters, CEO of Elia and Stefan Kapferer, CEO de 50Hertz pictured during the inauguration of a peace of the Berlin Wall in Elia site in Brussels, Monday 07 September 2020. BELGA PHOTO THIERRY ROGE
AMSTERDAM - Audience at the 50HERTZ Club Train during the 29th edition of the Amsterdam Dance Event (ADE). Spread over five days, more than a thousand music events will take place in the capital at over two hundred venues. ANP DINGENA MOL netherlands out - belgium out Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/amsterdam-audience-at-the-50hertz-club-train-during-the-29th-edition-of-the-amsterdam-dance-event-ade-spread-over-five-days-more-than-a-thousand-music-events-will-take-place-in-the-capital-at-over-two-hundred-venues-anp-dingena-mol-netherlands-out-belgium-out-image626612626.html
RM2YBCJPA–AMSTERDAM - Audience at the 50HERTZ Club Train during the 29th edition of the Amsterdam Dance Event (ADE). Spread over five days, more than a thousand music events will take place in the capital at over two hundred venues. ANP DINGENA MOL netherlands out - belgium out
View of new headquarters of 50Hertz power company under construction in new Europacity property development in Berlin Germany Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/stock-photo-view-of-new-headquarters-of-50hertz-power-company-under-construction-110377637.html
RMGBG3PD–View of new headquarters of 50Hertz power company under construction in new Europacity property development in Berlin Germany
Stefan Kapferer, CEO 50Hertz Transmission, Einzelbild,angeschnittenes Einzelmotiv, Portrait,Portraet. Ludwig Erhard Gipfel 2025 auf Gut Kaltenbrunn am Tegernsee am 09.05.2025. *** Stefan Kapferer, CEO 50Hertz Transmission, single image, cropped single motif, portrait, portrait Ludwig Erhard Summit 2025 at Gut Kaltenbrunn on Lake Tegernsee on 09 05 2025 Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/stefan-kapferer-ceo-50hertz-transmission-einzelbildangeschnittenes-einzelmotiv-portraitportraet-ludwig-erhard-gipfel-2025-auf-gut-kaltenbrunn-am-tegernsee-am-09052025-stefan-kapferer-ceo-50hertz-transmission-single-image-cropped-single-motif-portrait-portrait-ludwig-erhard-summit-2025-at-gut-kaltenbrunn-on-lake-tegernsee-on-09-05-2025-image677012742.html
RM3B9CGJE–Stefan Kapferer, CEO 50Hertz Transmission, Einzelbild,angeschnittenes Einzelmotiv, Portrait,Portraet. Ludwig Erhard Gipfel 2025 auf Gut Kaltenbrunn am Tegernsee am 09.05.2025. *** Stefan Kapferer, CEO 50Hertz Transmission, single image, cropped single motif, portrait, portrait Ludwig Erhard Summit 2025 at Gut Kaltenbrunn on Lake Tegernsee on 09 05 2025
Neuenhagen, Germany, 50Hertz Transmission Control Center Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/stock-photo-neuenhagen-germany-50hertz-transmission-control-center-78049567.html
RMEEYD0F–Neuenhagen, Germany, 50Hertz Transmission Control Center
Blue Digital Screen in Dark Theme Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/blue-digital-screen-in-dark-theme-image441308640.html
RF2GHY9JT–Blue Digital Screen in Dark Theme
Germany, Saxony-Anhalt, heavy current pylons, winter landscape Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/germany-saxony-anhalt-heavy-current-pylons-winter-landscape-image456852561.html
RM2HF7C2W–Germany, Saxony-Anhalt, heavy current pylons, winter landscape
RM2MYNF2C–Corporate Headquarters, 50hertz Transmission, Heidestraße, Mitte, Berlin, Germany, Europe
50 Hertz in Berlin Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/50-hertz-in-berlin-image327382847.html
RM2A0HG4F–50 Hertz in Berlin
Unternehmenszentrale, 50hertz Transmission, Heidestraße, Mitte, Berlin, Deutschland Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/unternehmenszentrale-50hertz-transmission-heidestrae-mitte-berlin-deutschland-image335652507.html
RM2AE285F–Unternehmenszentrale, 50hertz Transmission, Heidestraße, Mitte, Berlin, Deutschland
Unternehmenszentrale, 50hertz Transmission, Heidestraße, Mitte, Berlin, Deutschland Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/unternehmenszentrale-50hertz-transmission-heidestrae-mitte-berlin-deutschland-image450216001.html
RM2H4D32W–Unternehmenszentrale, 50hertz Transmission, Heidestraße, Mitte, Berlin, Deutschland
Wikinger Offshore Windfarm Construction Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/stock-photo-wikinger-offshore-windfarm-construction-143169351.html
RMJ8WWY3–Wikinger Offshore Windfarm Construction
Berlin, Germany. July 5th 2013. Inter alia press conference with German Minister Philipp Rösler and Minister Peter Altmaier about concept of citizen participation in network expansion with agreement signing between the companies and the Government. Credit: Credit: Gonçalo Silva/Alamy Live News. Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/stock-photo-berlin-germany-july-5th-2013-inter-alia-press-conference-with-german-57917279.html
RMDA6A27–Berlin, Germany. July 5th 2013. Inter alia press conference with German Minister Philipp Rösler and Minister Peter Altmaier about concept of citizen participation in network expansion with agreement signing between the companies and the Government. Credit: Credit: Gonçalo Silva/Alamy Live News.
09.06.2019, Berlin, Germany, Europe - The company headquarters of 50Hertz along Heidestrasse in the Europacity in Berlin Moabit. Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/09062019-berlin-germany-europe-the-company-headquarters-of-50hertz-along-heidestrasse-in-the-europacity-in-berlin-moabit-image260235846.html
RMW3ANDA–09.06.2019, Berlin, Germany, Europe - The company headquarters of 50Hertz along Heidestrasse in the Europacity in Berlin Moabit.
22 June 2022, Saxony-Anhalt, Bad Lauchstädt: Along a trunk road, the facilities of the Bad Lauchstädt substation can be seen standing out against the blue sky. The substation is one of over 70 electricity hubs operated by the transmission system operator 50Hertz in eastern Germany and needs to be expanded in the course of the energy transition. Two so-called STATCOMs. are being built here to collect electricity from renewable energies, transform it to a higher voltage level and transport it to other regions via extra-high voltage lines. The high-tech facilities are intended to keep the voltage Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/22-june-2022-saxony-anhalt-bad-lauchstdt-along-a-trunk-road-the-facilities-of-the-bad-lauchstdt-substation-can-be-seen-standing-out-against-the-blue-sky-the-substation-is-one-of-over-70-electricity-hubs-operated-by-the-transmission-system-operator-50hertz-in-eastern-germany-and-needs-to-be-expanded-in-the-course-of-the-energy-transition-two-so-called-statcoms-are-being-built-here-to-collect-electricity-from-renewable-energies-transform-it-to-a-higher-voltage-level-and-transport-it-to-other-regions-via-extra-high-voltage-lines-the-high-tech-facilities-are-intended-to-keep-the-voltage-image474044270.html
RM2JF6G8E–22 June 2022, Saxony-Anhalt, Bad Lauchstädt: Along a trunk road, the facilities of the Bad Lauchstädt substation can be seen standing out against the blue sky. The substation is one of over 70 electricity hubs operated by the transmission system operator 50Hertz in eastern Germany and needs to be expanded in the course of the energy transition. Two so-called STATCOMs. are being built here to collect electricity from renewable energies, transform it to a higher voltage level and transport it to other regions via extra-high voltage lines. The high-tech facilities are intended to keep the voltage
Berlin, Germany - Sept 2022: Modern office building of the 50Hertz Transmission GmbH designed by LOVE architecture Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/berlin-germany-sept-2022-modern-office-building-of-the-50hertz-transmission-gmbh-designed-by-love-architecture-image491360426.html
RF2KFBB6J–Berlin, Germany - Sept 2022: Modern office building of the 50Hertz Transmission GmbH designed by LOVE architecture
Unternehmenszentrale, 50hertz Transmission, Heidestraße, Mitte, Berlin, Deutschland Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/unternehmenszentrale-50hertz-transmission-heidestrae-mitte-berlin-deutschland-image397199217.html
RF2E25YJ9–Unternehmenszentrale, 50hertz Transmission, Heidestraße, Mitte, Berlin, Deutschland
Berlin, Germany - Sept 2022: Modern office building of the 50Hertz Transmission GmbH designed by LOVE architecture Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/berlin-germany-sept-2022-modern-office-building-of-the-50hertz-transmission-gmbh-designed-by-love-architecture-image491360210.html
RF2KFBAXX–Berlin, Germany - Sept 2022: Modern office building of the 50Hertz Transmission GmbH designed by LOVE architecture
09.06.2019, Berlin, Germany, Europe - The administrative headquarters of 50Hertz along Heidestrasse in the Europacity in Berlin-Moabit. 50Hertz Transmission GmbH is a German transmission system operator. [automated translation] Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/09062019-berlin-germany-europe-the-administrative-headquarters-of-50hertz-along-heidestrasse-in-the-europacity-in-berlin-moabit-50hertz-transmission-gmbh-is-a-german-transmission-system-operator-automated-translation-image348624812.html
RM2B756E4–09.06.2019, Berlin, Germany, Europe - The administrative headquarters of 50Hertz along Heidestrasse in the Europacity in Berlin-Moabit. 50Hertz Transmission GmbH is a German transmission system operator. [automated translation]
A complex emergency exercise of German and Czech rescue workers in an electricity power line near Hora Sv. Sebastiana, Czech Republic, on September 16, 2014. Around 200 experts are taking part in the unique international security exercise involving the failure of power grids entitled DRILL by Czech power grid operator CEPS and German operator 50Hertz. (CTK Photo/Ondrej Hajek) Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/stock-photo-a-complex-emergency-exercise-of-german-and-czech-rescue-workers-in-73661410.html
RME7RFTJ–A complex emergency exercise of German and Czech rescue workers in an electricity power line near Hora Sv. Sebastiana, Czech Republic, on September 16, 2014. Around 200 experts are taking part in the unique international security exercise involving the failure of power grids entitled DRILL by Czech power grid operator CEPS and German operator 50Hertz. (CTK Photo/Ondrej Hajek)
AMSTERDAM - Audience at the 50HERTZ Club Train during the 29th edition of the Amsterdam Dance Event (ADE). Spread over five days, more than a thousand music events will take place in the capital at over two hundred venues. ANP DINGENA MOL netherlands out - belgium out Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/amsterdam-audience-at-the-50hertz-club-train-during-the-29th-edition-of-the-amsterdam-dance-event-ade-spread-over-five-days-more-than-a-thousand-music-events-will-take-place-in-the-capital-at-over-two-hundred-venues-anp-dingena-mol-netherlands-out-belgium-out-image626612481.html
RM2YBCJH5–AMSTERDAM - Audience at the 50HERTZ Club Train during the 29th edition of the Amsterdam Dance Event (ADE). Spread over five days, more than a thousand music events will take place in the capital at over two hundred venues. ANP DINGENA MOL netherlands out - belgium out
Detail of facade of new headquarters of 50Hertz power company under construction in new Europacity property development, Berlin Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/stock-photo-detail-of-facade-of-new-headquarters-of-50hertz-power-company-under-110377668.html
RMGBG3RG–Detail of facade of new headquarters of 50Hertz power company under construction in new Europacity property development, Berlin
Stefan Kapferer, CEO 50Hertz Transmission, Einzelbild,angeschnittenes Einzelmotiv, Portrait,Portraet. Ludwig Erhard Gipfel 2025 auf Gut Kaltenbrunn am Tegernsee am 09.05.2025. *** Stefan Kapferer, CEO 50Hertz Transmission, single image, cropped single motif, portrait, portrait Ludwig Erhard Summit 2025 at Gut Kaltenbrunn on Lake Tegernsee on 09 05 2025 Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/stefan-kapferer-ceo-50hertz-transmission-einzelbildangeschnittenes-einzelmotiv-portraitportraet-ludwig-erhard-gipfel-2025-auf-gut-kaltenbrunn-am-tegernsee-am-09052025-stefan-kapferer-ceo-50hertz-transmission-single-image-cropped-single-motif-portrait-portrait-ludwig-erhard-summit-2025-at-gut-kaltenbrunn-on-lake-tegernsee-on-09-05-2025-image677012738.html
RM3B9CGJA–Stefan Kapferer, CEO 50Hertz Transmission, Einzelbild,angeschnittenes Einzelmotiv, Portrait,Portraet. Ludwig Erhard Gipfel 2025 auf Gut Kaltenbrunn am Tegernsee am 09.05.2025. *** Stefan Kapferer, CEO 50Hertz Transmission, single image, cropped single motif, portrait, portrait Ludwig Erhard Summit 2025 at Gut Kaltenbrunn on Lake Tegernsee on 09 05 2025
Neuenhagen, Germany, 50Hertz Transmission Control Center Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/stock-photo-neuenhagen-germany-50hertz-transmission-control-center-78049568.html
RMEEYD0G–Neuenhagen, Germany, 50Hertz Transmission Control Center
RM2MYNF25–Corporate Headquarters, 50hertz Transmission, Heidestraße, Mitte, Berlin, Germany, Europe
50 Hertz in Berlin Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/50-hertz-in-berlin-image327382843.html
RM2A0HG4B–50 Hertz in Berlin
Unternehmenszentrale, 50hertz Transmission, Heidestraße, Mitte, Berlin, Deutschland Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/unternehmenszentrale-50hertz-transmission-heidestrae-mitte-berlin-deutschland-image335652513.html
RM2AE285N–Unternehmenszentrale, 50hertz Transmission, Heidestraße, Mitte, Berlin, Deutschland
Unternehmenszentrale, 50hertz Transmission, Heidestraße, Mitte, Berlin, Deutschland Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/unternehmenszentrale-50hertz-transmission-heidestrae-mitte-berlin-deutschland-image450216000.html
RM2H4D32T–Unternehmenszentrale, 50hertz Transmission, Heidestraße, Mitte, Berlin, Deutschland
Wikinger Offshore Windfarm Construction Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/stock-photo-wikinger-offshore-windfarm-construction-143169336.html
RMJ8WWXG–Wikinger Offshore Windfarm Construction
Berlin, Germany. July 5th 2013. Inter alia press conference with German Minister Philipp Rösler and Minister Peter Altmaier about concept of citizen participation in network expansion with agreement signing between the companies and the Government. Credit: Credit: Gonçalo Silva/Alamy Live News. Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/stock-photo-berlin-germany-july-5th-2013-inter-alia-press-conference-with-german-57917277.html
RMDA6A25–Berlin, Germany. July 5th 2013. Inter alia press conference with German Minister Philipp Rösler and Minister Peter Altmaier about concept of citizen participation in network expansion with agreement signing between the companies and the Government. Credit: Credit: Gonçalo Silva/Alamy Live News.
09.06.2019, Berlin, Germany, Europe - The company headquarters of 50Hertz along Heidestrasse in the Europacity in Berlin Moabit. Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/09062019-berlin-germany-europe-the-company-headquarters-of-50hertz-along-heidestrasse-in-the-europacity-in-berlin-moabit-image260235850.html
RMW3ANDE–09.06.2019, Berlin, Germany, Europe - The company headquarters of 50Hertz along Heidestrasse in the Europacity in Berlin Moabit.
22 June 2022, Saxony-Anhalt, Bad Lauchstädt: In the office building of the Bad Lauchstädt substation, the current grid frequency is displayed, which changes within seconds depending on demand and supply. The substation is one of over 70 electricity hubs operated by the transmission system operator 50Hertz in eastern Germany and needs to be expanded in the course of the energy transition. Two so-called STATCOMs. are being built here to collect electricity from renewable energies, transform it to a higher voltage level and transport it to other regions via extra-high voltage lines. The high-te Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/22-june-2022-saxony-anhalt-bad-lauchstdt-in-the-office-building-of-the-bad-lauchstdt-substation-the-current-grid-frequency-is-displayed-which-changes-within-seconds-depending-on-demand-and-supply-the-substation-is-one-of-over-70-electricity-hubs-operated-by-the-transmission-system-operator-50hertz-in-eastern-germany-and-needs-to-be-expanded-in-the-course-of-the-energy-transition-two-so-called-statcoms-are-being-built-here-to-collect-electricity-from-renewable-energies-transform-it-to-a-higher-voltage-level-and-transport-it-to-other-regions-via-extra-high-voltage-lines-the-high-te-image474045353.html
RM2JF6HK5–22 June 2022, Saxony-Anhalt, Bad Lauchstädt: In the office building of the Bad Lauchstädt substation, the current grid frequency is displayed, which changes within seconds depending on demand and supply. The substation is one of over 70 electricity hubs operated by the transmission system operator 50Hertz in eastern Germany and needs to be expanded in the course of the energy transition. Two so-called STATCOMs. are being built here to collect electricity from renewable energies, transform it to a higher voltage level and transport it to other regions via extra-high voltage lines. The high-te
Wikinger Offshore Windfarm Construction Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/stock-photo-wikinger-offshore-windfarm-construction-143169329.html
RFJ8WWX9–Wikinger Offshore Windfarm Construction
Unternehmenszentrale, 50hertz Transmission, Heidestraße, Mitte, Berlin, Deutschland Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/unternehmenszentrale-50hertz-transmission-heidestrae-mitte-berlin-deutschland-image397219842.html
RF2E26WXX–Unternehmenszentrale, 50hertz Transmission, Heidestraße, Mitte, Berlin, Deutschland
Berlin, Germany - Sept 2022: Modern office building of the 50Hertz Transmission GmbH designed by LOVE architecture Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/berlin-germany-sept-2022-modern-office-building-of-the-50hertz-transmission-gmbh-designed-by-love-architecture-image491359987.html
RF2KFBAJY–Berlin, Germany - Sept 2022: Modern office building of the 50Hertz Transmission GmbH designed by LOVE architecture
09.06.2019, Berlin, Germany, Europe - The administrative headquarters of 50Hertz along Heidestrasse in the Europacity in Berlin-Moabit. 50Hertz Transmission GmbH is a German transmission system operator. [automated translation] Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/09062019-berlin-germany-europe-the-administrative-headquarters-of-50hertz-along-heidestrasse-in-the-europacity-in-berlin-moabit-50hertz-transmission-gmbh-is-a-german-transmission-system-operator-automated-translation-image348624832.html
RM2B756ET–09.06.2019, Berlin, Germany, Europe - The administrative headquarters of 50Hertz along Heidestrasse in the Europacity in Berlin-Moabit. 50Hertz Transmission GmbH is a German transmission system operator. [automated translation]
A complex emergency exercise of German and Czech rescue workers in an electricity power line near Hora Sv. Sebastiana, Czech Republic, on September 16, 2014. Around 200 experts are taking part in the unique international security exercise involving the failure of power grids entitled DRILL by Czech power grid operator CEPS and German operator 50Hertz. (CTK Photo/Ondrej Hajek) Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/stock-photo-a-complex-emergency-exercise-of-german-and-czech-rescue-workers-in-73661416.html
RME7RFTT–A complex emergency exercise of German and Czech rescue workers in an electricity power line near Hora Sv. Sebastiana, Czech Republic, on September 16, 2014. Around 200 experts are taking part in the unique international security exercise involving the failure of power grids entitled DRILL by Czech power grid operator CEPS and German operator 50Hertz. (CTK Photo/Ondrej Hajek)
DEN HAAG - The 50HERTZ Club Train during the 29th edition of the Amsterdam Dance Event (ADE). Spread over five days, more than a thousand music events will take place at over two hundred venues in the capital. ANP DINGENA MOL netherlands out - belgium out Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/den-haag-the-50hertz-club-train-during-the-29th-edition-of-the-amsterdam-dance-event-ade-spread-over-five-days-more-than-a-thousand-music-events-will-take-place-at-over-two-hundred-venues-in-the-capital-anp-dingena-mol-netherlands-out-belgium-out-image626612706.html
RM2YBCJW6–DEN HAAG - The 50HERTZ Club Train during the 29th edition of the Amsterdam Dance Event (ADE). Spread over five days, more than a thousand music events will take place at over two hundred venues in the capital. ANP DINGENA MOL netherlands out - belgium out
View of new office towers for Total and 50Hertz company tower in new Europacity property development under construction in Ber Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/stock-photo-view-of-new-office-towers-for-total-and-50hertz-company-tower-in-new-110377564.html
RMGBG3KT–View of new office towers for Total and 50Hertz company tower in new Europacity property development under construction in Ber
Stefan Kapferer, CEO 50Hertz Transmission, Einzelbild,angeschnittenes Einzelmotiv, Portrait,Portraet. Ludwig Erhard Gipfel 2025 auf Gut Kaltenbrunn am Tegernsee am 09.05.2025. *** Stefan Kapferer, CEO 50Hertz Transmission, single image, cropped single motif, portrait, portrait Ludwig Erhard Summit 2025 at Gut Kaltenbrunn on Lake Tegernsee on 09 05 2025 Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/stefan-kapferer-ceo-50hertz-transmission-einzelbildangeschnittenes-einzelmotiv-portraitportraet-ludwig-erhard-gipfel-2025-auf-gut-kaltenbrunn-am-tegernsee-am-09052025-stefan-kapferer-ceo-50hertz-transmission-single-image-cropped-single-motif-portrait-portrait-ludwig-erhard-summit-2025-at-gut-kaltenbrunn-on-lake-tegernsee-on-09-05-2025-image677012737.html
RM3B9CGJ9–Stefan Kapferer, CEO 50Hertz Transmission, Einzelbild,angeschnittenes Einzelmotiv, Portrait,Portraet. Ludwig Erhard Gipfel 2025 auf Gut Kaltenbrunn am Tegernsee am 09.05.2025. *** Stefan Kapferer, CEO 50Hertz Transmission, single image, cropped single motif, portrait, portrait Ludwig Erhard Summit 2025 at Gut Kaltenbrunn on Lake Tegernsee on 09 05 2025
Neuenhagen, Germany, 50Hertz Transmission Control Center Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/stock-photo-neuenhagen-germany-50hertz-transmission-control-center-78049572.html
RMEEYD0M–Neuenhagen, Germany, 50Hertz Transmission Control Center
50 Hertz Transmission GmbH in Berlin *** 50 Hertz Transmission GmbH in Berlin Credit: Imago/Alamy Live News Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/50-hertz-transmission-gmbh-in-berlin-50-hertz-transmission-gmbh-in-berlin-credit-imagoalamy-live-news-image571735807.html
RM2T64PRY–50 Hertz Transmission GmbH in Berlin *** 50 Hertz Transmission GmbH in Berlin Credit: Imago/Alamy Live News
Berlin, Germany. July 5th 2013. Inter alia press conference with German Minister Philipp Rösler and Minister Peter Altmaier about concept of citizen participation in network expansion with agreement signing between the companies and the Government. Credit: Credit: Gonçalo Silva/Alamy Live News. Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/stock-photo-berlin-germany-july-5th-2013-inter-alia-press-conference-with-german-57916087.html
RMDA68FK–Berlin, Germany. July 5th 2013. Inter alia press conference with German Minister Philipp Rösler and Minister Peter Altmaier about concept of citizen participation in network expansion with agreement signing between the companies and the Government. Credit: Credit: Gonçalo Silva/Alamy Live News.
09.06.2019, Berlin, Germany, Europe - The company headquarters of 50Hertz along Heidestrasse in the Europacity in Berlin Moabit. Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/09062019-berlin-germany-europe-the-company-headquarters-of-50hertz-along-heidestrasse-in-the-europacity-in-berlin-moabit-image260235849.html
RMW3ANDD–09.06.2019, Berlin, Germany, Europe - The company headquarters of 50Hertz along Heidestrasse in the Europacity in Berlin Moabit.
22 June 2022, Saxony-Anhalt, Bad Lauchstädt: Along a trunk road, the facilities of the Bad Lauchstädt substation can be seen standing out against the blue sky. The substation is one of over 70 electricity hubs operated by the transmission system operator 50Hertz in eastern Germany and needs to be expanded in the course of the energy transition. Two so-called STATCOMs. are being built here to collect electricity from renewable energies, transform it to a higher voltage level and transport it to other regions via extra-high voltage lines. The high-tech facilities are intended to keep the voltage Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/22-june-2022-saxony-anhalt-bad-lauchstdt-along-a-trunk-road-the-facilities-of-the-bad-lauchstdt-substation-can-be-seen-standing-out-against-the-blue-sky-the-substation-is-one-of-over-70-electricity-hubs-operated-by-the-transmission-system-operator-50hertz-in-eastern-germany-and-needs-to-be-expanded-in-the-course-of-the-energy-transition-two-so-called-statcoms-are-being-built-here-to-collect-electricity-from-renewable-energies-transform-it-to-a-higher-voltage-level-and-transport-it-to-other-regions-via-extra-high-voltage-lines-the-high-tech-facilities-are-intended-to-keep-the-voltage-image474044268.html
RM2JF6G8C–22 June 2022, Saxony-Anhalt, Bad Lauchstädt: Along a trunk road, the facilities of the Bad Lauchstädt substation can be seen standing out against the blue sky. The substation is one of over 70 electricity hubs operated by the transmission system operator 50Hertz in eastern Germany and needs to be expanded in the course of the energy transition. Two so-called STATCOMs. are being built here to collect electricity from renewable energies, transform it to a higher voltage level and transport it to other regions via extra-high voltage lines. The high-tech facilities are intended to keep the voltage
10.06.2019, Berlin, Germany, Europe - Tower of the Total Deutschland GmbH headquarters at the Europacity in the inner city locality of Moabit. Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/10062019-berlin-germany-europe-tower-of-the-total-deutschland-gmbh-headquarters-at-the-europacity-in-the-inner-city-locality-of-moabit-image386678040.html
RM2DD2KP0–10.06.2019, Berlin, Germany, Europe - Tower of the Total Deutschland GmbH headquarters at the Europacity in the inner city locality of Moabit.
08 June 2023, Schleswig-Holstein, Wedel: Stefan Kapferer (l-r), head of the transmission system operator 50Hertz, Gernot Kaser (independent), Mayor of Wedel, Tobias Goldschmidt (Bündnis 90/Die Grünen), Minister for Energy Transition, Climate Protection, Environment and Nature in Schleswig-Holstein, Jens Kerstan (Bündnis 90/Die Grünen), Senator for Environment, Climate, Energy and Agricultural Economics in Hamburg, Robert Habeck (Bündnis 90/Die Grünen), Federal Minister for the Economy and Climate Protection, hold signs with the text 'Wind energy for green heat' at a press event to mark the com Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/08-june-2023-schleswig-holstein-wedel-stefan-kapferer-l-r-head-of-the-transmission-system-operator-50hertz-gernot-kaser-independent-mayor-of-wedel-tobias-goldschmidt-bndnis-90die-grnen-minister-for-energy-transition-climate-protection-environment-and-nature-in-schleswig-holstein-jens-kerstan-bndnis-90die-grnen-senator-for-environment-climate-energy-and-agricultural-economics-in-hamburg-robert-habeck-bndnis-90die-grnen-federal-minister-for-the-economy-and-climate-protection-hold-signs-with-the-text-wind-energy-for-green-heat-at-a-press-event-to-mark-the-com-image554667033.html
RM2R6B7CW–08 June 2023, Schleswig-Holstein, Wedel: Stefan Kapferer (l-r), head of the transmission system operator 50Hertz, Gernot Kaser (independent), Mayor of Wedel, Tobias Goldschmidt (Bündnis 90/Die Grünen), Minister for Energy Transition, Climate Protection, Environment and Nature in Schleswig-Holstein, Jens Kerstan (Bündnis 90/Die Grünen), Senator for Environment, Climate, Energy and Agricultural Economics in Hamburg, Robert Habeck (Bündnis 90/Die Grünen), Federal Minister for the Economy and Climate Protection, hold signs with the text 'Wind energy for green heat' at a press event to mark the com
Unternehmenszentrale, 50hertz Transmission, Heidestraße, Mitte, Berlin, Deutschland Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/unternehmenszentrale-50hertz-transmission-heidestrae-mitte-berlin-deutschland-image397269314.html
RF2E2951P–Unternehmenszentrale, 50hertz Transmission, Heidestraße, Mitte, Berlin, Deutschland
22 June 2022, Saxony-Anhalt, Bad Lauchstädt: Installations from the Bad Lauchstädt substation stand out against the blue sky. The substation is one of over 70 electricity hubs operated by the transmission system operator 50Hertz in eastern Germany and needs to be expanded in the course of the energy transition. In order to collect electricity from renewable energies, transform it to a higher voltage level and transport it to other regions via extra-high voltage lines, two so-called STATCOMs. are being built here. The high-tech facilities are intended to keep the voltage in the power grid at a Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/22-june-2022-saxony-anhalt-bad-lauchstdt-installations-from-the-bad-lauchstdt-substation-stand-out-against-the-blue-sky-the-substation-is-one-of-over-70-electricity-hubs-operated-by-the-transmission-system-operator-50hertz-in-eastern-germany-and-needs-to-be-expanded-in-the-course-of-the-energy-transition-in-order-to-collect-electricity-from-renewable-energies-transform-it-to-a-higher-voltage-level-and-transport-it-to-other-regions-via-extra-high-voltage-lines-two-so-called-statcoms-are-being-built-here-the-high-tech-facilities-are-intended-to-keep-the-voltage-in-the-power-grid-at-a-image474045362.html
RM2JF6HKE–22 June 2022, Saxony-Anhalt, Bad Lauchstädt: Installations from the Bad Lauchstädt substation stand out against the blue sky. The substation is one of over 70 electricity hubs operated by the transmission system operator 50Hertz in eastern Germany and needs to be expanded in the course of the energy transition. In order to collect electricity from renewable energies, transform it to a higher voltage level and transport it to other regions via extra-high voltage lines, two so-called STATCOMs. are being built here. The high-tech facilities are intended to keep the voltage in the power grid at a
09.06.2019, Berlin, Germany, Europe - The administrative headquarters of 50Hertz along Heidestrasse in the Europacity in Berlin-Moabit. 50Hertz Transmission GmbH is a German transmission system operator. [automated translation] Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/09062019-berlin-germany-europe-the-administrative-headquarters-of-50hertz-along-heidestrasse-in-the-europacity-in-berlin-moabit-50hertz-transmission-gmbh-is-a-german-transmission-system-operator-automated-translation-image348624868.html
RM2B756G4–09.06.2019, Berlin, Germany, Europe - The administrative headquarters of 50Hertz along Heidestrasse in the Europacity in Berlin-Moabit. 50Hertz Transmission GmbH is a German transmission system operator. [automated translation]
A complex emergency exercise of German and Czech rescue workers in an electricity power line near Hora Sv. Sebastiana, Czech Republic, on September 16, 2014. Around 200 experts are taking part in the unique international security exercise involving the failure of power grids entitled DRILL by Czech power grid operator CEPS and German operator 50Hertz. (CTK Photo/Ondrej Hajek) Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/stock-photo-a-complex-emergency-exercise-of-german-and-czech-rescue-workers-in-73675963.html
RME7T6CB–A complex emergency exercise of German and Czech rescue workers in an electricity power line near Hora Sv. Sebastiana, Czech Republic, on September 16, 2014. Around 200 experts are taking part in the unique international security exercise involving the failure of power grids entitled DRILL by Czech power grid operator CEPS and German operator 50Hertz. (CTK Photo/Ondrej Hajek)
AMSTERDAM - Audience at the 50HERTZ Club Train during the 29th edition of the Amsterdam Dance Event (ADE). Spread over five days, more than a thousand music events will take place in the capital at over two hundred venues. ANP DINGENA MOL netherlands out - belgium out Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/amsterdam-audience-at-the-50hertz-club-train-during-the-29th-edition-of-the-amsterdam-dance-event-ade-spread-over-five-days-more-than-a-thousand-music-events-will-take-place-in-the-capital-at-over-two-hundred-venues-anp-dingena-mol-netherlands-out-belgium-out-image626612477.html
RM2YBCJH1–AMSTERDAM - Audience at the 50HERTZ Club Train during the 29th edition of the Amsterdam Dance Event (ADE). Spread over five days, more than a thousand music events will take place in the capital at over two hundred venues. ANP DINGENA MOL netherlands out - belgium out
10.06.2019, Berlin, Germany, Europe - high-rise building with the headquarters of Total Deutschland GmbH in Europacity in the Moabit district of Mitte. Opposite on the other side of the street is the new building of the 50Hertz Transmission GmbH company headquarters. [automated translation] Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/10062019-berlin-germany-europe-high-rise-building-with-the-headquarters-of-total-deutschland-gmbh-in-europacity-in-the-moabit-district-of-mitte-opposite-on-the-other-side-of-the-street-is-the-new-building-of-the-50hertz-transmission-gmbh-company-headquarters-automated-translation-image468036034.html
RM2J5CTMJ–10.06.2019, Berlin, Germany, Europe - high-rise building with the headquarters of Total Deutschland GmbH in Europacity in the Moabit district of Mitte. Opposite on the other side of the street is the new building of the 50Hertz Transmission GmbH company headquarters. [automated translation]
Neuenhagen, Germany, 50Hertz Transmission Control Center Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/stock-photo-neuenhagen-germany-50hertz-transmission-control-center-78049560.html
RMEEYD08–Neuenhagen, Germany, 50Hertz Transmission Control Center
Germany, Saxony-Anhalt, heavy current pylons, winter landscape Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/germany-saxony-anhalt-heavy-current-pylons-winter-landscape-image456852556.html
RM2HF7C2M–Germany, Saxony-Anhalt, heavy current pylons, winter landscape