. The Bulletin of the Beach Erosion Board. Coastal engineering; Shore protection; Beach erosion. The expansion of the Beach Erosion Board research facilities by the construction of a large wave tank and a coast model test basin is in progress adjacent to the Board's' offices and laboratory. A brief description of these facilities appeared in the Bulletin, Vol. 3, No. 4, October 1, 1Q49. Contract work is about 60 percent complete at the time this publication goes to press. Excavation work for the wave tank and coast model basin has been completed and concrete work is now progressing slightly ah

- Image ID: RGJM38
. The Bulletin of the Beach Erosion Board. Coastal engineering; Shore protection; Beach erosion. The expansion of the Beach Erosion Board research facilities by the construction of a large wave tank and a coast model test basin is in progress adjacent to the Board's' offices and laboratory. A brief description of these facilities appeared in the Bulletin, Vol. 3, No. 4, October 1, 1Q49. Contract work is about 60 percent complete at the time this publication goes to press. Excavation work for the wave tank and coast model basin has been completed and concrete work is now progressing slightly ah
Book Worm / Alamy Stock Photo
Image ID: RGJM38
. The Bulletin of the Beach Erosion Board. Coastal engineering; Shore protection; Beach erosion. The expansion of the Beach Erosion Board research facilities by the construction of a large wave tank and a coast model test basin is in progress adjacent to the Board's' offices and laboratory. A brief description of these facilities appeared in the Bulletin, Vol. 3, No. 4, October 1, 1Q49. Contract work is about 60 percent complete at the time this publication goes to press. Excavation work for the wave tank and coast model basin has been completed and concrete work is now progressing slightly ahead of schedule, Progress photographs of the construction operations on the wave tank are shown in figures 1-5. Progress pictures of the basin construction will be published in a later issue of this publication. WAVE TANK PROGRESS PHOTOGRAPHS. FIGURE I-VIEW SHOWING EXCAVATION AND SUBGRADING THE FLOOR OF 6-FOOT WAVE TANK PRIOR TO PLACEMENT OF FORMS,REINFORCING AND CONCRETE OF THE FLOOR SLAB 39. Please note that these images are extracted from scanned page images that may have been digitally enhanced for readability - coloration and appearance of these illustrations may not perfectly resemble the original work.. United States. Beach Erosion Board; United States. Army. Corps of Engineers. Washington, D. C. : The Board

Search stock photos by tags


Similar stock images