Alamy logo

. The Big Blackfoot River restoration progress report for 2002 and 2003 . Fish populations; Fishes; Fishery management; Trout fisheries; Stream ecology; Blackfoot River (Mont. ). (Solvelimis fontinalis). artic grayling (Thymallus arcticiis), white sucker {Catostomus commcrsoni). fathead minnow (Pimephales pomelas). northern pike {Esox lucius), brook stickleback {Culaea inconstans). Pumpkinseed (Lepomis gibhosiis), largemouth bass {Micropteriis sulmoides) and yellow perch (Percaflavescem). Most salmonids (WSCT. bull trout, rainbow trout and brown trout) in the river system exhibit fluvial migra

. The Big Blackfoot River restoration progress report for 2002 and 2003 . Fish populations; Fishes; Fishery management; Trout fisheries; Stream ecology; Blackfoot River (Mont. ). (Solvelimis fontinalis). artic grayling (Thymallus arcticiis), white sucker {Catostomus commcrsoni). fathead minnow (Pimephales pomelas). northern pike {Esox lucius), brook stickleback {Culaea inconstans). Pumpkinseed (Lepomis gibhosiis), largemouth bass {Micropteriis sulmoides) and yellow perch (Percaflavescem). Most salmonids (WSCT. bull trout, rainbow trout and brown trout) in the river system exhibit fluvial migra Stock Photo
Preview

Image details

Contributor:

Library Book Collection / Alamy Stock Photo

Image ID:

RHT9RP

File size:

7.1 MB (211.1 KB Compressed download)

Releases:

Model - no | Property - noDo I need a release?

Dimensions:

1880 x 1329 px | 31.8 x 22.5 cm | 12.5 x 8.9 inches | 150dpi

More information:

This image is a public domain image, which means either that copyright has expired in the image or the copyright holder has waived their copyright. Alamy charges you a fee for access to the high resolution copy of the image.

This image could have imperfections as it’s either historical or reportage.

. The Big Blackfoot River restoration progress report for 2002 and 2003 . Fish populations; Fishes; Fishery management; Trout fisheries; Stream ecology; Blackfoot River (Mont. ). (Solvelimis fontinalis). artic grayling (Thymallus arcticiis), white sucker {Catostomus commcrsoni). fathead minnow (Pimephales pomelas). northern pike {Esox lucius), brook stickleback {Culaea inconstans). Pumpkinseed (Lepomis gibhosiis), largemouth bass {Micropteriis sulmoides) and yellow perch (Percaflavescem). Most salmonids (WSCT. bull trout, rainbow trout and brown trout) in the river system exhibit fluvial migratory life-history characteristics, whereas tributaries support both migratory and resident populations. WSCT have a basin-wide distribution and is the most abundant species in the upper reaches of the tributary system. Bull trout distribution extends from the mainstem Blackfoot River to headwaters of larger tributaries north of the Blackfoot River mainstem. However, juvenile bull trout will rear in smaller "non- spawning" tributaries, some of which are located in the Garnet Mountains. Rainbow trout distribution is limited to the Blackfoot River downstream of Nevada Creek and lower reaches of the lower river tributaries, with the exception of Nevada Creek upstream and downstream of Nevada Reservoir. Rainbow trout occupy -10% of the perennial streams in the Blackfoot watershed, with river populations reproducing primarily in the lower portions of larger south-flowing tributaries. Brown trout inhabit -15% of the perennial stream system with a distribution that extends from the Landers Fork down the length of the Blackfoot River and into the lower foothills of the tributary system. Brook trout are widely distributed in tributaries, but rare in the mainstem Blackfoot River below the Landers Fork.. Figure 7. Land ownership map of the Blackfoot River Watershed. 19. Please note that these images are extracted from scanned page images that may have been digitally enhanced for

Save up to 30% with our image packs

Pre-pay for multiple images and download on demand.

View discounts