. The Big Blackfoot River restoration progress report for 2002 and 2003 . Fish populations; Fishes; Fishery management; Trout fisheries; Stream ecology; Blackfoot River (Mont. ). period, and damage (hoof-shear) to stream banks. Livestock have since been fenced from the riparian area. The survey site at mile 0.8 was not subject to streamside livestock damage. Water temperature monitoring shows moderately significant declines (Paired t- test; P = 0.08) following reconstruction, with maximum water temperatures -15" F cooler post-project compared with pre-project. Whirling disease sampling sh

Image details
Contributor:
Library Book Collection / Alamy Stock PhotoImage ID:
RHT9HTFile size:
7.2 MB (199.1 KB Compressed download)Releases:
Model - no | Property - noDo I need a release?Dimensions:
1716 x 1457 px | 29.1 x 24.7 cm | 11.4 x 9.7 inches | 150dpiMore information:
This image is a public domain image, which means either that copyright has expired in the image or the copyright holder has waived their copyright. Alamy charges you a fee for access to the high resolution copy of the image.
This image could have imperfections as it’s either historical or reportage.
. The Big Blackfoot River restoration progress report for 2002 and 2003 . Fish populations; Fishes; Fishery management; Trout fisheries; Stream ecology; Blackfoot River (Mont. ). period, and damage (hoof-shear) to stream banks. Livestock have since been fenced from the riparian area. The survey site at mile 0.8 was not subject to streamside livestock damage. Water temperature monitoring shows moderately significant declines (Paired t- test; P = 0.08) following reconstruction, with maximum water temperatures -15" F cooler post-project compared with pre-project. Whirling disease sampling shows continued high infection (results Part IV). McCabe Creek Restoration objective: restore instream flows and habitat conditions for bull trout and WSCT. Project Summary McCabe Creek, a cold basin-fed tributary to lower Dick Creek entering at stream mile 3.8, is located in the Monture Creek bull trout recovery area. McCabe Creek begins as a steep mountain stream in its headwaters, before entering knob-and-kettle topography in the lower basin. In lower reaches, McCabe Creek passes through a beaver-influenced wetland bog before entering Dick Creek, a lower tributary to Monture Creek, entering at stream mile 3.8. McCabe Creek has a long history of adverse fisheries impacts related to channel alterations and agricultural activities. These include intensive riparian grazing, physical alterations to the channel, poorly designed road crossings, chronic dewatering, and fish losses to irrigation ditches. A comprehensive restoration project for McCabe Creek began in 1999 and was completed in 2002. This project: 1) consolidated four irrigation ditches into one pipeline and screened the intake; 2) converted flood to sprinkler irrigation; 3) restored habitat conditions including the placement of instream wood and shrub plantings along 1/2 mile of stream; 4) incorporated necessary riparian livestock management changes; and 5) replaced a county road culvert with an open-bottom box culvert. I