. The Big Blackfoot River restoration progress report for 2002 and 2003 . Fish populations; Fishes; Fishery management; Trout fisheries; Stream ecology; Blackfoot River (Mont. ). Blackfoot River and tributary temperatures Collecting watershed-wide water temperatures is a major element to a habitat assessment and monitoring program (Figure 12). Temperatures studies during 2002 and 2003 involved: 1) baseline and long-term data collections at established sites throughout the Blackfoot watershed; 2) assessing tributary restoration projects; 3) identifying thermal regimes (natural and anthropogenic

Image details
Contributor:
Library Book Collection / Alamy Stock PhotoImage ID:
RHT9NRFile size:
7.2 MB (286.4 KB Compressed download)Releases:
Model - no | Property - noDo I need a release?Dimensions:
2136 x 1170 px | 36.2 x 19.8 cm | 14.2 x 7.8 inches | 150dpiMore information:
This image is a public domain image, which means either that copyright has expired in the image or the copyright holder has waived their copyright. Alamy charges you a fee for access to the high resolution copy of the image.
This image could have imperfections as it’s either historical or reportage.
. The Big Blackfoot River restoration progress report for 2002 and 2003 . Fish populations; Fishes; Fishery management; Trout fisheries; Stream ecology; Blackfoot River (Mont. ). Blackfoot River and tributary temperatures Collecting watershed-wide water temperatures is a major element to a habitat assessment and monitoring program (Figure 12). Temperatures studies during 2002 and 2003 involved: 1) baseline and long-term data collections at established sites throughout the Blackfoot watershed; 2) assessing tributary restoration projects; 3) identifying thermal regimes (natural and anthropogenic) favorable and unfavorable for trout; 4) monitoring temperature triggers of the Drought Plan; and 5) relating other biological assessments (movements, spawning, etc.) to thermal properties of the river system. Summaries of temperature data are found throughout this report. All raw and summary data for all monitoring sites are located in Appendix I. Blackfoot River Tributary. During 2002 and 2003, we collected 78 water temperature samples at 59 locations in 38 tributaries, along with 13 samples at seven sites in the Blackfoot River (Appendix I). Figure 13 shows a portion of the river data for critical summer periods between 1997-2003. These data outline the warming (Nevada Creek) and cooling (eg. North Fork) influences of key tributaries and the general summer-time thermal properties of the lower ~70 miles of the Blackfoot River. Blackfoot River Maximum Temperatures (1997-2003) 75 70 A A A A A ^^A^A^Al^ ll ⦠Scotty Brown â Belmont â â ttf "'t/^ 60 ⢠â « * A Raymond If 3 g >⢠O) 3333 â Cutoff 1997 1998 1999 2000 2001 2002 2003 Figure 13. Maximum water temperatures for four locations of the Blaci^foot River, July and August 1997-2003. 28. Please note that these images are extracted from scanned page images that may have been digitally enhanced for readability - coloration and appearance of these illustrations may not perfectly resemble the original work..