WASHINGTON DC, USA - Reflecting Pool Renovation with Water. Status of the renovation project on the Lincoln Memorial's Reflecting Pool as of July 2, 2012. Costing over $30 million and taking over 2 years, the major renovation has replaced the floor of the pool, installed a new circulation and filtration system, paved the walkways on either side, and added new lighting. It is scheduled for completion in late-summer to early-fall 2012.

- Image ID: CRXAY4
WASHINGTON DC, USA - Reflecting Pool Renovation with Water. Status of the renovation project on the Lincoln Memorial's Stock Photo
Enlarge
https://www.alamy.com/licenses-and-pricing/?v=1 https://www.alamy.com/stock-photo-washington-dc-usa-reflecting-pool-renovation-with-water-status-of-49137176.html
WASHINGTON DC, USA - Reflecting Pool Renovation with Water. Status of the renovation project on the Lincoln Memorial's Reflecting Pool as of July 2, 2012. Costing over $30 million and taking over 2 years, the major renovation has replaced the floor of the pool, installed a new circulation and filtration system, paved the walkways on either side, and added new lighting. It is scheduled for completion in late-summer to early-fall 2012.
Image ID: CRXAY4
Photo by David Coleman / HaveCameraWillTravel
Location: Lincoln Memorial, Washington DC, District of Columbia, United States