Visitors at the Mushada water treatment plant tour the facility during the grand-opening celebration March 26. (U.S. Army photo/Capt. Allison Flannigan) Piledriver comes to an end, projects continue 89727
RMID:Image ID:HENJ3T
Image details
Contributor:
PJF Military Collection / Alamy Stock PhotoImage ID:
HENJ3TFile size:
7.2 MB (362 KB Compressed download)Releases:
Model - no | Property - noDo I need a release?Dimensions:
1291 x 1936 px | 21.9 x 32.8 cm | 8.6 x 12.9 inches | 150dpiDate taken:
26 March 2008More information:
This image is a public domain image, which means either that copyright has expired in the image or the copyright holder has waived their copyright. Alamy charges you a fee for access to the high resolution copy of the image.
This image could have imperfections as it’s either historical or reportage.