The Crawler Transporter brings the Space Shuttle Discovery on its Mobile Launcher Platform into position at Launch Pad 39B, following rollout from the Vehicle Assembly Building. The Fixed Service Structure and the Rotating Service Structure, permanent parts of the launch pad, are left of the Shuttle. Discovery and its crew of five are targeted for a June 8 liftoff on a satellite deployment mission, STS-70. Meanwhile, sister ship Atlantis is poised for launch from Pad 39A on a mission to rendezvous and dock with the Russian Mir Space Station. Atlantis is scheduled to lift off on STS-71 no earlier than June 22. 5/11/1995 (photo: NASA )
with our download packs
Pre-pay for multiple images and download on demand.
This image is no longer for sale. It has previously been bought for a multiple re-use license which is still valid. You cannot download or purchase for any new licenses. By clicking OK, you are confirming that this image is only to be used for the rights in the existing license.