Onshore oil and gas exploration site. Making up wire line logging tools before lifting up to rig platform floor. Kurdistan Iraq

- Image ID: D2CFCM
Greenshoots Communications / Alamy Stock Photo
Image ID: D2CFCM
Crewmen running wire line logs. Using various tools which are run into the bottom of the bore hole where Logging Up takes place - or readings are taken. These included measuring resistivity of geological formation, porosity, taking pressure readings and images of borehole and so on. Data is then interpreted to see whether the whole project is viable.
Location: Near Gopala Village, Near Sulaymaniyah, Sulaimani, Silemani, Kurdistan, Northern Iraq, Middle East

Similar stock images