Offshore workers transfering to a cable laying vessel on the Walney Offshore windfarm project, off Barrow in Furness,

RMID:Image ID:C5MTC4
Image details
Contributor:
Ashley Cooper pics / Alamy Stock PhotoImage ID:
C5MTC4File size:
60.2 MB (2.5 MB Compressed download)Releases:
Model - no | Property - noDo I need a release?Dimensions:
5616 x 3744 px | 47.5 x 31.7 cm | 18.7 x 12.5 inches | 300dpiDate taken:
8 July 2011More information:
Offshore workers transfering to a cable laying vessel on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320, 000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.