Electrical workers from the F.E.C. Construction Company of Farah, Afghanistan, which is owned and operated by Walley Muhammad, continue to install electrical poles and wires as part of the Farah Provincial Reconstruction Team (PRT) sponsored District I electrification program on Dec. 8, 2009. Currently, 280 electrical poles have been installed throughout District I and the overall project is 70 percent complete. Electric power will allow the citizens of Farah to increase their sanitation levels, extend business hours, and generally increase their quality of life.
RMID:Image ID:HEB1DB
Image details
Contributor:
PJF Military Collection / Alamy Stock PhotoImage ID:
HEB1DBFile size:
7.1 MB (252.9 KB Compressed download)Releases:
Model - no | Property - noDo I need a release?Dimensions:
1907 x 1310 px | 32.3 x 22.2 cm | 12.7 x 8.7 inches | 150dpiDate taken:
8 December 2009More information:
This image is a public domain image, which means either that copyright has expired in the image or the copyright holder has waived their copyright. Alamy charges you a fee for access to the high resolution copy of the image.
This image could have imperfections as it’s either historical or reportage.