Liupanshui. 6th July, 2020. Aerial photo taken on July 6, 2020 shows a railway bridge along the Anshun-Liupanshui railway in southwest China's Guizhou Province. The Anshun-Liupanshui intercity railway, with a designed speed of 250 km per hour, is being prepared for opening. The railway will shorten the travel time between Guiyang and Liupanshui from the current 3.5 hours to about 1 hour, and Liupanshui City will be fully connected with the national high-speed rail network. Credit: Liu Xu/Xinhua/Alamy Live News

Liupanshui. 6th July, 2020. Aerial photo taken on July 6, 2020 shows a railway bridge along the Anshun-Liupanshui railway in southwest China's Guizhou Province. The Anshun-Liupanshui intercity railway, with a designed speed of 250 km per hour, is being prepared for opening. The railway will shorten the travel time between Guiyang and Liupanshui from the current 3.5 hours to about 1 hour, and Liupanshui City will be fully connected with the national high-speed rail network. Credit: Liu Xu/Xinhua/Alamy Live News Stock Photo
Preview

Image details

Contributor:

Xinhua / Alamy Stock Photo

Image ID:

2C61K26

File size:

30.5 MB (2.8 MB Compressed download)

Releases:

Model - no | Property - noDo I need a release?

Dimensions:

4000 x 2667 px | 33.9 x 22.6 cm | 13.3 x 8.9 inches | 300dpi

Date taken:

6 July 2020

Photographer:

Xinhua

More information:

This image could have imperfections as it’s either historical or reportage.

Available for editorial and personal use only. Get in touch for commercial uses.

Search stock photos by tags