January 22, 2020, Okuma, Fukushima, Japan: Workers checks drain at Unit 4 building of tsunami-devastated Tokyo Electric Power Company (TEPCO) Fukushima Daiichi Nuclear Power Plant in Okuma town, Fukushima Prefecture, 22 January 2020. The storage tanks including water processed in the ALPS will be full around summer of 2022, TEPCO has told. Japanese government need to decide soon how manage the processed water still including tritium. (Credit Image: © Kimimasa Mayama/POOL via ZUMA Wire)

- Image ID: 2APCJM6

January 22, 2020, Okuma, Fukushima, Japan: Workers checks drain at Unit 4 building of tsunami-devastated Tokyo Electric Power Company (TEPCO) Fukushima Daiichi Nuclear Power Plant in Okuma town, Fukushima Prefecture, 22 January 2020. The storage tanks including water processed in the ALPS will be full around summer of 2022, TEPCO has told. Japanese government need to decide soon how manage the processed water still including tritium. (Credit Image: © Kimimasa Mayama/POOL via ZUMA Wire)

ZUMA Press, Inc. / Alamy Stock Photo

Image ID: 2APCJM6

Similar stock images