Denham, UK. 16th October 2020. Work has started on the building of a new temporary bridge across the River Colne for HS2 to take their lorries and equipment across the delicate chalk stream River Colne as part of the construction of the controversial High Speed Rail link from London to Birmingham. A huge number of trees have already been felled as part of this project. Credit: Maureen McLean/Alamy Live News

- Image ID: 2D6F1EW
Denham, UK. 16th October 2020. Work has started on the building of a new temporary bridge across the River Colne for HS2 to take their lorries and equipment across the delicate chalk stream River Colne as part of the construction of the controversial High Speed Rail link from London to Birmingham. A huge number of trees have already been felled as part of this project. Credit: Maureen McLean/Alamy Live News Stock Photo
Enlarge
https://www.alamy.com/licenses-and-pricing/?v=1 https://www.alamy.com/denham-uk-16th-october-2020-work-has-started-on-the-building-of-a-new-temporary-bridge-across-the-river-colne-for-hs2-to-take-their-lorries-and-equipment-across-the-delicate-chalk-stream-river-colne-as-part-of-the-construction-of-the-controversial-high-speed-rail-link-from-london-to-birmingham-a-huge-number-of-trees-have-already-been-felled-as-part-of-this-project-credit-maureen-mcleanalamy-live-news-image382646513.html
Denham, UK. 16th October 2020. Work has started on the building of a new temporary bridge across the River Colne for HS2 to take their lorries and equipment across the delicate chalk stream River Colne as part of the construction of the controversial High Speed Rail link from London to Birmingham. A huge number of trees have already been felled as part of this project. Credit: Maureen McLean/Alamy Live News
Maureen McLean / Alamy Stock Photo
Image ID: 2D6F1EW
Location: Denham, Uxbridge, Buckinghamshire, UK

Similar stock images