Denham, UK. 16th October 2020. A run off gully from the HS2 construction site into the delicate chalk stream River Colne has appeared. Behind the gully construction work has started by HS2 contractors on a new temporary bridge that will take HS2 lorries and equipment across the bridge for the construction of the controversial and over budget High Speed Rail link from London to Birmingham. Credit: Maureen McLean/Alamy Live News

- Image ID: 2D6F1D0
Denham, UK. 16th October 2020. A run off gully from the HS2 construction site into the delicate chalk stream River Colne has appeared. Behind the gully construction work has started by HS2 contractors on a new temporary bridge that will take HS2 lorries and equipment across the bridge for the construction of the controversial and over budget High Speed Rail link from London to Birmingham. Credit: Maureen McLean/Alamy Live News Stock Photo
Enlarge
https://www.alamy.com/licenses-and-pricing/?v=1 https://www.alamy.com/denham-uk-16th-october-2020-a-run-off-gully-from-the-hs2-construction-site-into-the-delicate-chalk-stream-river-colne-has-appeared-behind-the-gully-construction-work-has-started-by-hs2-contractors-on-a-new-temporary-bridge-that-will-take-hs2-lorries-and-equipment-across-the-bridge-for-the-construction-of-the-controversial-and-over-budget-high-speed-rail-link-from-london-to-birmingham-credit-maureen-mcleanalamy-live-news-image382646460.html
Denham, UK. 16th October 2020. A run off gully from the HS2 construction site into the delicate chalk stream River Colne has appeared. Behind the gully construction work has started by HS2 contractors on a new temporary bridge that will take HS2 lorries and equipment across the bridge for the construction of the controversial and over budget High Speed Rail link from London to Birmingham. Credit: Maureen McLean/Alamy Live News
Maureen McLean / Alamy Stock Photo
Image ID: 2D6F1D0
Location: Denham, Uxbridge, Buckinghamshire, UK

Similar stock images