. Building a railroad; a handbook devoted to a new, speedy and economical method of performing every operation from grading right-of-way to ballasting and maintaining track . FSuS^uoBrs. l3«>;nJJii8RaB Down on Side of Grade Making a Fill Machine Down on Berm on Side and DepositingMaterial Up on tiie Grade This is very easily accomplished by the Americanfor four reasons: (1) The facility with which the machine travelsup or down a grade on the portable track sections. (2) The maximum clearance height and reach ofthe dipper above the track on which the machineoperates, as follows: With radius

. Building a railroad; a handbook devoted to a new, speedy and economical method of performing every operation from grading right-of-way to ballasting and maintaining track . FSuS^uoBrs. l3«>;nJJii8RaB Down on Side of Grade Making a Fill Machine Down on Berm on Side and DepositingMaterial Up on tiie Grade This is very easily accomplished by the Americanfor four reasons: (1) The facility with which the machine travelsup or down a grade on the portable track sections. (2) The maximum clearance height and reach ofthe dipper above the track on which the machineoperates, as follows: With radius Stock Photo
Preview

Image details

Contributor:

Reading Room 2020 / Alamy Stock Photo

Image ID:

2CRBJC7

File size:

7.2 MB (263 KB Compressed download)

Releases:

Model - no | Property - noDo I need a release?

Dimensions:

1683 x 1485 px | 28.5 x 25.1 cm | 11.2 x 9.9 inches | 150dpi

More information:

This image could have imperfections as it’s either historical or reportage.

. Building a railroad; a handbook devoted to a new, speedy and economical method of performing every operation from grading right-of-way to ballasting and maintaining track . FSuS^uoBrs. l3«>;nJJii8RaB Down on Side of Grade Making a Fill Machine Down on Berm on Side and DepositingMaterial Up on tiie Grade This is very easily accomplished by the Americanfor four reasons: (1) The facility with which the machine travelsup or down a grade on the portable track sections. (2) The maximum clearance height and reach ofthe dipper above the track on which the machineoperates, as follows: With radius of dipper, 29 ft.Dumping height above rail, 9 ft. 4 in. With radius of dipper, 22 ft. 10 in.Dumping height above rail, 18 ft. 8 in. (3) The maximum digging depth of 8 ft. 4 in.below track and maximum digging radius of 30 ft.6 in. insures obtaining greatest amount of materialat each setting. 19 Building a Railroad. Diagram of Maximum and Minimum Digging Radius (4) Free moving, full circle action of the Ameri-can without use of outriggers of any kind.

Save up to 70% with our image packs

Pre-pay for multiple images and download on demand.

View discounts