BANGKOK, THAILAND - APRIL 24, 2019: The Saensaep khlong leads through modern district of the city with residential houses, numerous bridges and high

RMImage ID:WTBT5F
Image details
Contributor:
eFesenko / Alamy Stock PhotoImage ID:
WTBT5FFile size:
41.1 MB (3.3 MB Compressed download)Releases:
Model - no | Property - noDo I need a release?Dimensions:
4722 x 3041 px | 40 x 25.7 cm | 15.7 x 10.1 inches | 300dpiDate taken:
24 April 2019More information:
BANGKOK, THAILAND - APRIL 24, 2019: The Saensaep khlong leads through modern district of the city with residential houses, numerous bridges and high buildings built on its the banks, on April 24 in Bangkok